Letter No.
|
Subject
|
dated
|
2017/M(C)/135/158
|
Non-functioning of electrical equipments in mobile pantry units on IR
|
27.12.2017
|
2010/M(C)/137/2
|
Modification of coaches and other PCVs & OCVs
|
27.12.2017
|
2017/M(C)/58/2
|
Condition of bio-toilets
|
26.12.2017
|
99/M(C)/141/21
|
Leakage of water due to damage to health faucet
|
20.12.2017
|
20151M(C)/137/1
|
Schedule of Technical requirement for Refurbishing Model rake coaches
|
19.12.2017
|
2007/M(C)/137/16/V01.Xl
|
Availability of resting place for train Escorting Staff
|
04.12.2017
|
2016/M(C)/650/2
|
Conversion of coaches into camping coaches
|
29.11.2017
|
2007/M(C)/137/16/V01.XI
|
Unauthorised use of AC Coaches by staff deputed for on-board services
|
23.11.2017
|
2017/M(C)/137/9
|
Technical requirements for LHB coaching stock maintenance for speed upto 160 / 200 kmph
|
22.11.2017
|
76/M(C)/137/31 Vol.iv
|
Provision of Fire Extinguishers with anti theft arrangement in newly manufactured non-AC coaches (2 nos per coach)
|
21.11.2017
|
2009/M(C)/141/6
|
Attachment of extra coach in a Rake / Passenger train
|
17.11.2017
|
20071M(C)/137121V01.(I)
|
Minutes of the CRSE'S and CWM (Coaching Workshops) Conference held on 14.11.2017 at Conference Hall, Baroda Rouse, New Delhi
|
17.11.2017
|
2009/M(C)/137/1 Vol-ii
|
Replacement of suspected Bolster Spring of ICF design coaches (M_s R.L. Steel Make)
|
15.11.2017
|
2010/M(C)/165/5
|
Provision of double acting AC compartment doors in all newly manufactured AC coaches
|
15.11.2017
|
97/M(C)/137/1 (xi)
|
Procurement of High Tensile Tight Lock Centre Buffer Coupler CBC
|
15.11.2017
|
2007/ M(C) /137/2 Vol.(l)
|
Transportation code for LHB (LS-S & LWACCN) coaches Air Springs of 160 KN
|
15.11.2017
|
87/M(C)/202/10 VOL(II)
|
Printing of Safety message on doors of coaches
|
10.11.2017
|
2007/M(C)/137/16 Vol. XI
|
Re-Distribution of RSP work (732_17-18) regarding FIAT Bogies dtd 08.11.17
|
08.11.2017
|
2007/M(C)/13716 vol (Xi)
|
Provision of Pit Wheel Lathes in Coaching Depots
|
27.10.2017
|
2009/M(C)/137/1 Vol (ii)
|
Replacement of Bolster Springs manufactured from M/s RL Steel bars
|
24.10.2017
|
2000/M(C)/l41/8
|
Bio-Toilet coaches - flushing and ventilation
|
18.10.2017
|
2007/M(C)/l37/16 Vol. XI
|
Distribution of RSP work (732_17-18) regarding FIAT Bogies
|
17.10.2017
|
99/M(C)/141/16 Vol.III
|
Maintenance of pantry cars and safety therein
|
06.10.2017
|
2009/M(C)/137/1 Vol-ll
|
Reporting of Coach Detachments
|
29.09.2017
|