Search Documents(Date Wise)   Search | Hindi | Increase Font size Increase Font size Increase Font size|
Indian Railway main logo
भारतीय रेल राष्ट्र की जीवन रेखा...
INDIAN RAILWAYS Lifeline to the Nation...
National Emblem of India
National Emblem of India
About Indian Railways
   Corporate Overview
      Railway Board Directorates
         Mechanical Engneering
            Circulars
               Mechanical (Coaching)
                  2017


 
2017

 

Letter  No.

Subject

dated

2017/M(C)/135/158

Non-functioning of electrical equipments in mobile pantry units on IR

27.12.2017

2010/M(C)/137/2

Modification of coaches and other PCVs & OCVs

27.12.2017

2017/M(C)/58/2

Condition of bio-toilets

26.12.2017

99/M(C)/141/21

Leakage of water due to damage to health faucet

20.12.2017

20151M(C)/137/1

Schedule of Technical requirement for Refurbishing Model rake coaches

19.12.2017

2007/M(C)/137/16/V01.Xl

Availability of resting place for train Escorting Staff

04.12.2017

 2016/M(C)/650/2

Conversion of coaches into camping coaches

29.11.2017

2007/M(C)/137/16/V01.XI

Unauthorised use of AC Coaches by staff deputed for on-board services

23.11.2017

2017/M(C)/137/9

Technical requirements for LHB coaching stock maintenance for speed upto 160 / 200 kmph

22.11.2017

76/M(C)/137/31 Vol.iv

Provision of Fire Extinguishers with anti theft arrangement in newly manufactured non-AC coaches (2 nos per coach)

21.11.2017

2009/M(C)/141/6

Attachment of extra coach in a Rake / Passenger train

17.11.2017

20071M(C)/137121V01.(I)

Minutes of the CRSE'S and CWM (Coaching Workshops) Conference held on 14.11.2017 at Conference Hall, Baroda Rouse, New Delhi

17.11.2017

2009/M(C)/137/1 Vol-ii

Replacement of suspected Bolster Spring of ICF design coaches (M_s R.L. Steel Make)

15.11.2017

2010/M(C)/165/5

Provision of double acting AC compartment doors in all newly manufactured AC coaches

15.11.2017

97/M(C)/137/1 (xi)

Procurement of High Tensile Tight Lock Centre Buffer Coupler CBC

15.11.2017

2007/ M(C) /137/2 Vol.(l)

Transportation code for LHB (LS-S & LWACCN) coaches Air Springs of 160 KN

15.11.2017

87/M(C)/202/10 VOL(II)

Printing of Safety message on doors of coaches

10.11.2017

2007/M(C)/137/16 Vol. XI

Re-Distribution of RSP work (732_17-18) regarding FIAT Bogies dtd 08.11.17

08.11.2017

2007/M(C)/13716 vol (Xi)

Provision of Pit Wheel Lathes in Coaching Depots

27.10.2017

2009/M(C)/137/1 Vol (ii)

Replacement of Bolster Springs manufactured from M/s RL Steel bars

24.10.2017

2000/M(C)/l41/8

Bio-Toilet coaches - flushing and ventilation

18.10.2017

2007/M(C)/l37/16 Vol. XI

Distribution of RSP work (732_17-18) regarding FIAT Bogies

17.10.2017

99/M(C)/141/16 Vol.III

Maintenance of pantry cars and safety therein

06.10.2017

2009/M(C)/137/1 Vol-ll

Reporting of Coach Detachments

29.09.2017

2017/M(C)/137/2 Vol.(i)

Points recorded during meeting of CRSE/ Chg’s and Sr.CDO’s 07.09.2017 in Railway Board

19.09.2017

2009/M(C)/165/6

Rationalization of the functions of AC Coach Attendant, Coach Attendant for Linen distribution and OBHS

14.09.2017

2017/M(C)/143/1

Inspection of Trains & Coaching Depots by CRSE/Chg’s

14.09.2017

96/M(C)/141/77

Quick watering arrangements

11.09.2017

2017/M(C)/142/4

Distribution of work of Provision of 10000 Fire Extinguishers with anti-theft arrangement in non-AC coaches under RSP 17-18

01.09.2017

2017/M(C)/142/4

Distribution of work of Provision of Dustbins in 7500 non-AC coaches under RSP 17-18

01.09.2017

2017/M(C)/142/4

Provision of crash buffers along with anti-climbers for 2000 ICF design coaches under RSP 2017-18

31.08.2017

2007/M(C)/137/3 Vol.lI

Nomination of Nodal Officers for new rolling stock

24.08.2017

2009/M(C)/141/6 vol. xi

Reporting of unusual happenings to Railway Board

22.08.2017

2017/M(C)/142/4

Retro-fitment of CBC and Refurbishment of lCF coaches

11.08.2017

2007/M(C)/137/16 vol. ix

LPDN make secondary springs

09.08.2017

2007/M(C)/137/16 vol. xi

LHB maintenance

08.08.2017

2007/M(C)/141/1

POH of coaches

21.07.2017

2001/M(C)/137/10 Vol. ii

Removal of plastic films from newly manufactured coaches

19.07.2017

2017/M(C)/141/8 Pt

Project Swarn

17.07.2017

2007/M(C)/137/2 (CMG)

Warranty period for various Coaching items as per RDSO Specifications

07.07.2017

2007/M(C)/137/2 (CMG)

Breakage  leakage working out of Ferrule Joints of BP / FP Angle cocks of LHB coaches

07.07.2017

97 /M(C)/1 37/1 Vol (xl)

Completing the work of Fitment of Balanced Draft Gear in Rajdhani / Shatabdi

29.06.2017

2006/M(C)/ 137/20 Vol VIII part (II)

Use of NAFTC and GFRE sheets as roof ceiling material paneling purpose in coaches

16.06.2017

95/M(C)/141/1 Pt

Maintenance Pattern of Coaching Trains (Mainline and MEMU_DEMU_EMU)

14.06.2017

2009/M(C) I137/1 Vol (ii)

Brake binding in coaches

13.06.2017

2007/M(C)/137/16 Vol. IX

Functioning of Controlled Discharge, Toilet System (CDTS) in coaches

09.06.2017

2017/M(C)/141/8 Pt.

Launching of Project Swarn

09.06.2017

2017/M(C)/141/8 Pt.

Launching of Project Swarn

08.06.2017

2008/M(C)/165/4

Points raised by the Members of the Standing Committee on Railways during their meeting held on 31.05.2017 reg. condition of coaches

06.06.2017

2006/M(C)/137/20 Vol (ix) Pt.

Provision of Polymerized Floor Coating in coaches having SS inlay

05.06.2017

2017/M(C)/141/8 Pt.

Launching of Project Swarn

25.05.2017

2017/M(C)/142/4

Retrofitment of crash buffers alongwith anti-climber in 2000 ICF design coaches

23.05.2017

2003/M(C)/141/3

Dealing with bad odour emanating of toilets of coaches

19.05.2017

2009/M(C)/137/1 Vol (i)

Unscheduled detachments at the Primary End for 2016-17

19.05.2017

2000/M(C)/141/8 Vol.-V

Supply of Inoculums to Zonal Railway

15.05.2017

97/M(C)/137/1 Vol. XI

Retrofitment of Balanced Draft Gear in LHB coaches

12.05.2017

2014/M(C)/141/2

Monitoring the performance of Zonal Railways - Coaching

09.05.2017

201/M(C)/142/4

Retrofltment of CBCs along with balanced draft gear in ICF coach 04.05.17 PUs

04.05.2017

95/ M(C)/141/1 (LHB) pt.

SS-1 Schedules in the Coaching Depots

04.05.2017

1995/ M(C)/141/1 pt.1

Maintenance of Rajdhani, Shatabdi and Duranto trains

28.04.2017

2014/M(C)/141/2

Standardization of Hand Tools to be carried by the Pit line gangs

28.04.2017

1995/ M(C)/141/1 pt.1

Maintenance of Rajdhani, Shatabdi and Duranto trains

20.04.2017

2007/ M(C)/137/16 vol (ix)

Breakage of Springs of FIAT Bogies

06.03.2017

2007/ M(C)/137/16 vol (ix)

Breakage of Springs of FIAT Bogies

28.02.2017

2016/M(C)/650/2

Eligible life of ICF design coaches for conversion into NMGs

21.02.2017
 

1995/ M(C)/141/1

Maintenance of passenger carrying trains

20.02.2017

97/M(C)/137/1 Vol.xii

Retro-fitment of CBCs with Balanced Draft Gear in ICF coaches (Annual Target for ZR)

17.02.2017

2006/M(C)/137/20

Upgraded items for ICF-design coaches

10.02.2017

95/M(C)/141/1

Corrigendum  Maintenance of trains that touch the Primary Station more than once within the limit of 3500 Kms / 96 Hrs.

10.02.2017

87/M(C)/202/10 vol (iii)

Provision of Integrated Braille display in existing coaches during POH in Workshops.

25.01.2017

97/M(C)/137/1 Vol (XI)

Retrofitment of CBC with balanced draft gear on ICF Coaches having screw couplers.

20.01.2017

95/M(C)/141/1

Maintenance of trains that touch the Primary Station more than once within the limit of 3500 Kms / 96 Hrs.

16.01.2017

2016/M(C)/141/1

Targets & objectives for 2016·17 & 2017·18-actionable points

04.01.2017

20071M(C)/137/16 Vol  IX

Attachment of ICF Design RA in rake with LHB coaches

04.01.2017

2007/ M(C)/137/16 Vol (ix)

Breakage of Springs of FIAT Bogies of Gatiman I Rajdhani I Shatabdi trains

03.01.2017

2009/M (C)/141/6 Vol. III

Improving safety performances of Indian Railways

30.12.2016

97/M(C)/137/1 Vol. IX

MoM on the Retrofitment of Centre Buffer Coupler (CBC) and Head stock in ICF Coaches held on 14th December 2016 at Railway Board

26.12.2016

2007/M(C)/137/1 Vol. IX

Breakage of LHB Springs

26.12.2016

2006/ M(C)/137/11(PNM)

Provision of additional foldable berth and Tool box in Non LHB (i.e. ICF) AC Coaches

20.12.2016


 




Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 23-06-2021  

Admin Login |  Site Map  |  Contact Us  |  RTI  |  Disclaimer  |  Terms & Conditions  |  Privacy Policy  Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.