Search Documents(Date Wise)   Search | Hindi | Increase Font size Increase Font size Increase Font size|
Indian Railway main logo
भारतीय रेल राष्ट्र की जीवन रेखा...
INDIAN RAILWAYS Lifeline to the Nation...
National Emblem of India
National Emblem of India
About Indian Railways
   Corporate Overview
      Railway Board Directorates
         Mechanical Engneering
            Circulars
               Mechanical (Coaching)
                  2023


 
2023

File No.  Subject Date
2021/M(C)/143/1_Inspection-III Inspection of Off POH Coaches  11.09.23
2021/M(C)/143/1_Inspection-II Inspection of off-POH rake of ECR 11.09.23
2021/M(C)/143/1_Inspection-I Inspection of ICF rake of WR 11.09.23

No.2017/M(C)/138/2

Investigation of high value OMRS alert and Brake Binding cases of coaches 04.09.23

2023/M(C)/142/4 Pt.VI

Work for up gradation of Fire Suppression System as per revised RDSO Spec No. RDSO/2013/CG-06 (Rev.2) with Amndt.'l or latest 24.08.23
No.2014/M(C)/141/2_CMM 

Clarification regarding Prefix 'X' before coach number

24.08.23
No. 2009/Dev. Cell/lCCl/l Vol.Xll

Trolley Mounted sewage evacuation machine for Bio-toilets

23.08.23
2017/M(C)/137/4 TrainSet

Training on Vande-Bharat Trainsets

23.08.23
201 9/M(C)/137/5 Pt.5

Review of items for Vendor Directory

14.08.23
2020/M(C)/142/4 pt VI

Work of replacement of existing HASps with aspiration type sampling points in Lavatory area of AC coaches

14.08.23
2020/MC/i37/16 GS Pt.

Production plan of manufacturing EOG LWS AC coaches

10.08.23
2014/M(C)/141/ 2_CMM

implementation of feature to only allow WISE to accept coaches into shop through shop booking through CMM

09.08.23
2014/M(C)/141/2 _CMM

Minutes of meeting of video conference held on 07 Aug 2023 with GM CMMS CRIS and CRSE CR  

08.08.23
2023/M(C)/142/2

Allotment of LHB Coaches for rake PP 2023-2024

09.08.23
2023/M(C)/142/2

Allotment of LHB Coaches for rake PP 2023-2024

07.08.23
2023/M(C)/142/2

Allotment of LHB Coaches for rake formation completion

02.08.23
2014/M(C)/141/2

Holding of Coaches over CMMS

01.08.23
2020/M(C)/651/1 pt.

lnter-Railway transfer of coaches

31.07.23
2007/M(C)/137/16 Vol-VII

Pantograph entanglement in train no. 12285

31.07.23
2021/M(C)/58/1/Mtg.&Conf

Minutes of Meeting regarding various safety issues on 12.07.2023

27.07.23
2022/M(C)/137/11

RA (inspection carriage with Air Brake) for ECR SPJ Division

26.07.23
2023/M(C)/142/4pt VI

Allotment for the work of Up gradation of Manual Fire suppression system into Automatic system in 500 Power Pantry Cars under Pink Book item No. 1253 (23-24)  

24.07.23
76/M(C)/137/31Vol-V

Minutes of Meeting regarding fitment of smoke detection and alarm system in AC coaches.

21.07.23
2021/M(C)/142/4(5)

RSP Allotment of Modification in the Air Brake pipe line and associated fittings for 5000 coaches @ Rs 30000 per coach

21.07.23
2021/M(C)/142/4 (6)

RSP work of Retro-Fitment of revised wiring with modified junction boxes and connectors

21.07.23
2023/M(C)/142/4 pt V

Allotment against the RSP work for provision of SS Metal trough below RMPU in place of FRP Trough in 1000 coaches sanctioned under RSP item No. 1254 (23-24)

20.07.23
2017/M(C)/138/2

Requirement of GS SLR SLRD Coaches (lCF) in good fettle for running special trains

19.07.23
78/M(C)/202/9 Mil rail

Issue regarding military coaches

13.07.23
2017/M(C)/138/2 Pt.1

Investigation of issue related to sudden dropping and recreation of BP Pressure in LHB rakes  

12.07.23
2021/M(C)/58/1/Mtg.&Conf

Video Conference regarding various Safety issues.

11.07.23
2007/M(C)/137/16 Power Car-II

Cleaning of Dog Box in trains

10.07.23
2023/M(C)/142/4 Pt VI

Provision of Fire detection and Suppression System in Power Cars and Pantry cars and FDSS in AC coaches

10.07.23
2007/M(C)/137/16 Power Car

Provision of Dog Box in Power cars

07.07.23
2020/M(C)/650/2

Maintenance of NMG NMGH NMGHS rakes

06.07.23
2011/M(C)/137/4 Wheels

Guidelines for maintenance of Ms KLW make Wheel Disc for LHB coaches

06.07.23
76/M(C)/137/31 Vol V

Provision of Fire safety items in Railway Coaches

03.07.23
2011/M(C)/137/4 wheels

Wheel disc crack in LHB Coaches

03.07.23
2021/M(C)/141/2 Pt.2

Cleanliness of bio-toilets

28.06.23
2021/M(C)/137/4 Conical

Provision of metal bonded conical spring as primary suspension

26.06.23
2022/M (C)/142/2

Allotment of LRAAC Coaches.

26.06.23
2020/M(C)/142/4 Pt.IX

Up gradation of Toilets in LHB Coaches

13.06.23
2019/M(C)/137/5 pt.-3

Strengthening of ICF bogie Frame

09.06.23
2023/M(C)/142/4ptVI

RSP Allotment of Fire detection and suppression system in Power Cars and Pantry Cars

08.06.23
2020/M(C)/142/4 pt VI

Provision of Automatic Fire & Smoke Detection System

08.06.23
2020/M(C)/141/2 Pt

Maintenance of Ms KBIPL make air brake system and its components for ICF, LHB coaches

31.05.23
2017/M(C)/137/4 TrainSet

Inspection notes of Train-set Depot Shakurbasti on 21-04-2023  

29.05.23
2021/M(C)/141/2 Pt.-2

Maintenance of Bio-Toilets

26.05.23
2023/EDME/Chg/Inspection Note/2

Points noted during inspection of EDME/Coaching of DDN C&W depot on 11.05.2023 dated18.05.2023

18.05.23
2021/M(C)/142/4(17)

Distribution of RSP work of Conversion of ICF coaches into NMGHS coaches (PB No. 1249_23-24)

12.05.23

No.2020/M(C)/202/4

Canvas Oil painting by Foot and Mouth Artists in coaches.

10.05.2023
2023/M(C)/142/1Pt1

Design, Development, Manufacturing and supply of New Bogie for 5000 LHB coaches (10,000 Bogie) @30 lakhs per bogie (PB. No. 1245/23-24)

02.05.2023

2019/M(C)/137/6

Use of Fire Barrier cloth for Seat and berths. 

27.04.2023
2020/M(C)/651/1 Pt

Inter Railway transfer of coaches

24.04.2023

2021/M(C)/142/4 Part ll

Anti Graffiti Coating on Coaches 21.04.2023

2019/M(C)/142/ 4 pt XVlll

RSP work of "Retro-fitment of Centre Buffer Couplers (CBC) along with balanced draft gears and replacement of Headstock and provision of modular toilet in ICF design coaches during MLR & POH" (P.8. ltem No. 618121-22 (1254117-18)).

12.04.2023

78/M(C)/202/9 Mil Rail

Issues with Military Coaches and Langars 12.04.2023
2023/M(C)/142/2 Allotment of LHB coaches for PP 2023-24 05.04.2023

2021/M(C)/142/4 Part. ll

Anti Graffiti Coating on Coaches 05.04.2023

20221/M(C)/142/2

Allotment of LWACCW and LWFAC coaches 31.03.2023

2022/M(C)/141/2-lCF Phasing out

Operation of ICF Coaches 31.03.2023

2020/M(C)/165/22

 

Braille Stickers to MCF specification MMDTS 22001, Rev _Nil

06.01.2023

2019/M(C)/137/6

 

Cushioning material for seat and berths for coaches for Indian Railways.

17.01.2023

2020/M(C)/650/2

 

Conversion of ICF coaches into NMGHS coaches (with modified Ball transfer Units) with locking arrangements.

18.01.2023

2021/M(C)/142/4(15)

 

Committee for Performance of pressurized flushing system

20.01.2023

2021/M(C)/141/2 Pt2

 

Performance of Bio-Vacuum Toilets of LHB coaches.

25.01 .2023

2007/M(C)/137/16PowerCar-1 

Retro-fitment of LWLRRM Power cars with provision of Dog Box

25.01.2023

97/M(C)/1 37/1 Vol-XlV

 

Technical modifications/guidelines issued in last 05 Years (2017-20221 tor AAR 'H' type head tight lock Centre Buffer Coupler with balanced draft gear.

25.01.2023

2021/M(C)/141/2 Pt2

 

Committee for maintenance issues related to Bio Vacuum toilets.

01.02.2023

2021/M(C)/141/2 Pt2 

Up-gradation of Bio-Vacuum toilets of LHB coaches

01.02.2023

2022/M(C)/137/2

 

Specifications for three phase propulsion equipment and control

03.02.2023

2022M(C)/Bharat Gaurav

 

Minutes of meeting held on 27.01.2023 regarding review of issues

07.02.2023

2022/M(C)/142/2

 

Allotment of LHB coaches for Bharat Gaurav trains

07.02.2023

2022/M(C)/142/2- Part (2)

 

Fairy Queen Coaches

07.02.2023

2023/M(C)/141/1

 

Maintenance of Passenger Rolling stock on lR.

08.02.2023

2020/M(C)/202/VP

 

Manufacturing of LVPH (Rear Opening) coaches.

08.02.2023

2014/M(C)/141/ 2_cMM

 

Provision to capture daily ineffective report for NMG/NMGH/NMGHS over CMMS dashboard

08.02.2023

2022/M(C)/Bharat Gaurav

 

Major modifications in LHB Bharat Gaurav train rake

16.02.2023

2020/M(C)/650/2

 

Attachment of NMGHS Coach with a freight train over DFC routes

17.02.2023

 

 




Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 14-09-2023  

Admin Login |  Site Map  |  Contact Us  |  RTI  |  Disclaimer  |  Terms & Conditions  |  Privacy Policy  Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.