File No. |
Subject |
Date |
2021/M(C)/143/1_Inspection-III |
Inspection of Off POH Coaches |
11.09.23 |
2021/M(C)/143/1_Inspection-II |
Inspection of off-POH rake of ECR |
11.09.23 |
2021/M(C)/143/1_Inspection-I |
Inspection of ICF rake of WR |
11.09.23 |
No.2017/M(C)/138/2
|
Investigation of high value OMRS alert and Brake Binding cases of coaches |
04.09.23 |
2023/M(C)/142/4 Pt.VI
|
Work for up gradation of Fire Suppression System as per revised RDSO Spec No. RDSO/2013/CG-06 (Rev.2) with Amndt.'l or latest |
24.08.23 |
No.2014/M(C)/141/2_CMM |
Clarification regarding Prefix 'X' before coach number
|
24.08.23 |
No. 2009/Dev. Cell/lCCl/l Vol.Xll |
Trolley Mounted sewage evacuation machine for Bio-toilets
|
23.08.23 |
2017/M(C)/137/4 TrainSet |
Training on Vande-Bharat Trainsets
|
23.08.23 |
201 9/M(C)/137/5 Pt.5 |
Review of items for Vendor Directory
|
14.08.23 |
2020/M(C)/142/4 pt VI |
Work of replacement of existing HASps with aspiration type sampling points in Lavatory area of AC coaches
|
14.08.23 |
2020/MC/i37/16 GS Pt. |
Production plan of manufacturing EOG LWS AC coaches
|
10.08.23 |
2014/M(C)/141/ 2_CMM |
implementation of feature to only allow WISE to accept coaches into shop through shop booking through CMM
|
09.08.23 |
2014/M(C)/141/2 _CMM |
Minutes of meeting of video conference held on 07 Aug 2023 with GM CMMS CRIS and CRSE CR
|
08.08.23 |
2023/M(C)/142/2 |
Allotment of LHB Coaches for rake PP 2023-2024
|
09.08.23 |
2023/M(C)/142/2 |
Allotment of LHB Coaches for rake PP 2023-2024
|
07.08.23 |
2023/M(C)/142/2 |
Allotment of LHB Coaches for rake formation completion
|
02.08.23 |
2014/M(C)/141/2 |
Holding of Coaches over CMMS
|
01.08.23 |
2020/M(C)/651/1 pt. |
lnter-Railway transfer of coaches
|
31.07.23 |
2007/M(C)/137/16 Vol-VII |
Pantograph entanglement in train no. 12285
|
31.07.23 |
2021/M(C)/58/1/Mtg.&Conf |
Minutes of Meeting regarding various safety issues on 12.07.2023
|
27.07.23 |
2022/M(C)/137/11 |
RA (inspection carriage with Air Brake) for ECR SPJ Division
|
26.07.23 |
2023/M(C)/142/4pt VI |
Allotment for the work of Up gradation of Manual Fire suppression system into Automatic system in 500 Power Pantry Cars under Pink Book item No. 1253 (23-24)
|
24.07.23 |
76/M(C)/137/31Vol-V |
Minutes of Meeting regarding fitment of smoke detection and alarm system in AC coaches.
|
21.07.23 |
2021/M(C)/142/4(5) |
RSP Allotment of Modification in the Air Brake pipe line and associated fittings for 5000 coaches @ Rs 30000 per coach
|
21.07.23 |
2021/M(C)/142/4 (6) |
RSP work of Retro-Fitment of revised wiring with modified junction boxes and connectors
|
21.07.23 |
2023/M(C)/142/4 pt V |
Allotment against the RSP work for provision of SS Metal trough below RMPU in place of FRP Trough in 1000 coaches sanctioned under RSP item No. 1254 (23-24)
|
20.07.23 |
2017/M(C)/138/2 |
Requirement of GS SLR SLRD Coaches (lCF) in good fettle for running special trains
|
19.07.23 |
78/M(C)/202/9 Mil rail |
Issue regarding military coaches
|
13.07.23 |
2017/M(C)/138/2 Pt.1 |
Investigation of issue related to sudden dropping and recreation of BP Pressure in LHB rakes
|
12.07.23 |
2021/M(C)/58/1/Mtg.&Conf |
Video Conference regarding various Safety issues.
|
11.07.23 |
2007/M(C)/137/16 Power Car-II |
Cleaning of Dog Box in trains
|
10.07.23 |
2023/M(C)/142/4 Pt VI |
Provision of Fire detection and Suppression System in Power Cars and Pantry cars and FDSS in AC coaches
|
10.07.23 |
2007/M(C)/137/16 Power Car |
Provision of Dog Box in Power cars
|
07.07.23 |
2020/M(C)/650/2 |
Maintenance of NMG NMGH NMGHS rakes
|
06.07.23 |
2011/M(C)/137/4 Wheels |
Guidelines for maintenance of Ms KLW make Wheel Disc for LHB coaches
|
06.07.23 |
76/M(C)/137/31 Vol V |
Provision of Fire safety items in Railway Coaches
|
03.07.23 |
2011/M(C)/137/4 wheels |
Wheel disc crack in LHB Coaches
|
03.07.23 |
2021/M(C)/141/2 Pt.2 |
Cleanliness of bio-toilets
|
28.06.23 |
2021/M(C)/137/4 Conical |
Provision of metal bonded conical spring as primary suspension
|
26.06.23 |
2022/M (C)/142/2 |
Allotment of LRAAC Coaches.
|
26.06.23 |
2020/M(C)/142/4 Pt.IX |
Up gradation of Toilets in LHB Coaches
|
13.06.23 |
2019/M(C)/137/5 pt.-3 |
Strengthening of ICF bogie Frame
|
09.06.23 |
2023/M(C)/142/4ptVI |
RSP Allotment of Fire detection and suppression system in Power Cars and Pantry Cars
|
08.06.23 |
2020/M(C)/142/4 pt VI |
Provision of Automatic Fire & Smoke Detection System
|
08.06.23 |
2020/M(C)/141/2 Pt |
Maintenance of Ms KBIPL make air brake system and its components for ICF, LHB coaches
|
31.05.23 |
2017/M(C)/137/4 TrainSet |
Inspection notes of Train-set Depot Shakurbasti on 21-04-2023
|
29.05.23 |
2021/M(C)/141/2 Pt.-2 |
Maintenance of Bio-Toilets
|
26.05.23 |
2023/EDME/Chg/Inspection Note/2 |
Points noted during inspection of EDME/Coaching of DDN C&W depot on 11.05.2023 dated18.05.2023
|
18.05.23 |
2021/M(C)/142/4(17) |
Distribution of RSP work of Conversion of ICF coaches into NMGHS coaches (PB No. 1249_23-24)
|
12.05.23 |
No.2020/M(C)/202/4
|
Canvas Oil painting by Foot and Mouth Artists in coaches.
|
10.05.2023 |
2023/M(C)/142/1Pt1 |
Design, Development, Manufacturing and supply of New Bogie for 5000 LHB coaches (10,000 Bogie) @30 lakhs per bogie (PB. No. 1245/23-24)
|
02.05.2023 |
2019/M(C)/137/6
|
Use of Fire Barrier cloth for Seat and berths.
|
27.04.2023 |
2020/M(C)/651/1 Pt |
Inter Railway transfer of coaches
|
24.04.2023 |
2021/M(C)/142/4 Part ll
|
Anti Graffiti Coating on Coaches |
21.04.2023 |
2019/M(C)/142/ 4 pt XVlll
|
RSP work of "Retro-fitment of Centre Buffer Couplers (CBC) along with balanced draft gears and replacement of Headstock and provision of modular toilet in ICF design coaches during MLR & POH" (P.8. ltem No. 618121-22 (1254117-18)).
|
12.04.2023 |
78/M(C)/202/9 Mil Rail
|
Issues with Military Coaches and Langars |
12.04.2023 |
2023/M(C)/142/2 |
Allotment of LHB coaches for PP 2023-24 |
05.04.2023 |
2021/M(C)/142/4 Part. ll
|
Anti Graffiti Coating on Coaches |
05.04.2023 |
20221/M(C)/142/2
|
Allotment of LWACCW and LWFAC coaches |
31.03.2023 |
2022/M(C)/141/2-lCF Phasing out
|
Operation of ICF Coaches |
31.03.2023 |
2020/M(C)/165/22
|
Braille Stickers to MCF specification MMDTS 22001, Rev _Nil
|
06.01.2023 |
2019/M(C)/137/6
|
Cushioning material for seat and berths for coaches for Indian Railways.
|
17.01.2023 |
2020/M(C)/650/2
|
Conversion of ICF coaches into NMGHS coaches (with modified Ball transfer Units) with locking arrangements.
|
18.01.2023 |
2021/M(C)/142/4(15)
|
Committee for Performance of pressurized flushing system
|
20.01.2023 |
2021/M(C)/141/2 Pt2
|
Performance of Bio-Vacuum Toilets of LHB coaches.
|
25.01 .2023 |
2007/M(C)/137/16PowerCar-1
|
Retro-fitment of LWLRRM Power cars with provision of Dog Box
|
25.01.2023 |
97/M(C)/1 37/1 Vol-XlV
|
Technical modifications/guidelines issued in last 05 Years (2017-20221 tor AAR 'H' type head tight lock Centre Buffer Coupler with balanced draft gear.
|
25.01.2023 |
2021/M(C)/141/2 Pt2
|
Committee for maintenance issues related to Bio Vacuum toilets.
|
01.02.2023 |
2021/M(C)/141/2 Pt2
|
Up-gradation of Bio-Vacuum toilets of LHB coaches
|
01.02.2023 |
2022/M(C)/137/2
|
Specifications for three phase propulsion equipment and control
|
03.02.2023 |
2022M(C)/Bharat Gaurav
|
Minutes of meeting held on 27.01.2023 regarding review of issues
|
07.02.2023 |
2022/M(C)/142/2
|
Allotment of LHB coaches for Bharat Gaurav trains
|
07.02.2023 |
2022/M(C)/142/2- Part (2)
|
Fairy Queen Coaches
|
07.02.2023 |
2023/M(C)/141/1
|
Maintenance of Passenger Rolling stock on lR.
|
08.02.2023 |
2020/M(C)/202/VP
|
Manufacturing of LVPH (Rear Opening) coaches.
|
08.02.2023 |
2014/M(C)/141/ 2_cMM
|
Provision to capture daily ineffective report for NMG/NMGH/NMGHS over CMMS dashboard
|
08.02.2023 |
2022/M(C)/Bharat Gaurav
|
Major modifications in LHB Bharat Gaurav train rake
|
16.02.2023 |
2020/M(C)/650/2
|
Attachment of NMGHS Coach with a freight train over DFC routes
|
17.02.2023 |