2019/MC/137/3pt
|
Hon’ble MR inspection of train No 12060 NZM-Kota janshatabdi exp from NZM- SNHJ on 02.11.2019
|
31.12.2019
|
2007/MC/137/8
|
Cases of roller bearing failures in coaching stock
|
20.12.2019
|
99/MC/165/22 vol iii
|
Marking TRESSPASSERS SHALL BE PROSECUTED in portion of train rake specified for divyangjan.
|
11.12.2019
|
2007/MC/137/16 Vol xi
|
Reduction in weight of LHB coaches.
|
03.12.2019
|
2007/MC/137/8
|
Cases of breakage of primary secondary coil springs and failures of secondary air springs with FIBA in LHB coaches.
|
28.11.2019
|
2019/MC/142/4
|
Requirement of fire safety works under bulk RSP
|
21.11.2019
|
2012/MC/165/3
|
Quality audit of coaching depots and workshop
|
18.11.2019
|
2017/MC/141/2 pt
|
Celebration of the constitution on 26th November 2019 and subsequent activities
|
13.11.2019
|
2019/MC/651/1
|
Non-availability of coaches in CMM
|
08.11.2019
|
2007/MC/137/2 vol (i)
|
19th carriage maintenance group meeting 2019
|
08.11.2019
|
2017/MC/137/1 pt II
|
Parliamentary assurance relating to lok sabha starred Q.No 199 dtd 15.03.17 regarding CCTV cameras in coaches.
|
07.11.2019
|
2017/MC/142/4 pt IV
|
Centralized tender for refurbishment of 4000 ICF type coaches.
|
28.10.2019
|
2001/MC/141/1
|
Provision of funds for ACWP & QWA for 2019-20 Revised estimate and BE for 2020-21
|
26.09.2019
|
96/MC/165/22 vol. ii
|
Provision of pop riveted type Braille signage in all type of coaches.
|
25.09.2019
|
2017/MC/138/2
|
Action taken report for punctuality loss cases recorded in the period from 01.04.19 up to 31.08.19
|
23.09.2019
|
2017/MC/141/2 pt
|
Celebration of 150 years of Mahatma
|
23.09.2019
|
2007/MC/137/2
|
Video conference with creses of zonal railways on 19.09.2019 at 1500 hrs in relation to progress of bio toilet fitment on IR coaches.
|
18.09.2019
|
2019/MC/142/4
|
Provision of funds of MC items under bulk order RSP coaches for year
|
17.09.2019
|
2017/MC/142/4 pt
|
Cushioning material for seats and berths for IR coaches.
|
16.09.2019
|
2019/MC/142/4
|
Reversibility of LHB power cars and distribution of RSP work of transition coupling in coaches.
|
12.09.2019
|
2019/MC/142/4
|
Requirement of transition coupling in coaches.
|
12.09.2019
|
2017/MC/141/2 pt
|
Display of national flag on the exterior wall of coaches.
|
12.09.2019
|
96/MC/165/22 vol ii pt
|
Accessible India conpaign
|
11.09.2019
|
2010/MC/137/8
|
Inspection note of Member rolling stock
|
04.09.2019
|
2019/MC/142/4
|
Distribution of funds for RSP works reg. Project utkrisht.
|
29.08.2019
|
2018/MC/142/4
|
Distribution of work of provision of fully assembled wheel set for LHB coaches with cartridge bearings and brake discs 500 nos @ Rs. 5 lacs
|
28.08.2018
|
2017/MC/137/15
|
Furnishing position regarding refurbishment of coaches and project utkrisht.
|
26.08.2019
|
2012/MC/165/3
|
Quality audit of coaching depots and workshops
|
19.08.2019
|
2016/MC/137/2 pt I
|
Vistadome coaches.
|
16.08.2019
|
2017/MC/137/15
|
Upgradation of 500 rakes project utkrisht
|
14.08.2018
|
2019/MC/142/2
|
Excess/Shortage position of LHB coaches
|
14.08.2019
|
2000/MC/141/8 vol.i
|
Fitment of vacuum toilets
|
13.08.2019
|
2019/MC/142/4
|
Distribution of work of split type air brake discs 1600 nos
|
06.08.2019
|
2019/MC/142/4
|
Distribution of work of provision of underslung water tank for 500 LHB coaches.,
|
06.08.2019
|
2019/MC/142/4
|
Distribution of RSP work of retrofitment of soft side buffers with polymer element in 2000 ICF type coaches.
|
06.08.2019
|
2019/MC/142/4
|
Distribution of work of upgradation of coach toilets of 2500 AC coaches.
|
06.08.2019
|
2019/MC/142/4
|
Distribution of work of provision of fully assembled wheel set for LHB coaches with cartridge bearing and brake discs. 500 nos
|
06.08.2019
|
96/MC/165/22 vol ii pt
|
Accessible India campaign
|
06.08.2019
|
98/MC/137/8 vol
|
Advertisement on the exterior surface of EMU/MEMU/DEMU rakes
|
01.08.2019
|
2019/MC/142/4
|
Requirement of RSP work of provision of CBC with balanced draft gear in coaches fitted with CBC with single pack or floating plate draft gear.
|
31.07.2019
|
2018/MC/142/4
|
Distribution of work of provision of fully assembled wheel set for LHB coaches with cartridge bearing and brake discs-500
|
26.07.2019
|
2000/MC/141/8
|
Fitment of SS lavatory pan
|
25.07.2019
|
2007/MC/137/16 vol xiv
|
Corrigendum committee to review schedule of LHB coaches
|
24.07.2019
|
95/MC/141/1
|
Quality of POH of ICF coaches from workshops
|
24.07.2019
|
2001/MC/137/1 vol V
|
Target in respect of Venturi type ventilation system in ICF & LHB coaches
|
23.07.2019
|
2007/MC/137/16 vol xiv
|
Committee to review schedule of LHB coaches.
|
23.07.2019
|
2019/MC/237/2 vol i
|
Video conference with CRSEs
|
22.07.2019
|
2019/MC/Misc
|
Updation of datas for video conferencing of CRB on 18.07.2019
|
17.07.2019
|
2016/MC/137/2 pt 1
|
Vistadome coaches.
|
12.07.2019
|
2015/MC/137/1 vol ii
|
Conditions of lHB Chair cars
|
05.07.2019
|
96/MC/141/77
|
Watering of coaches during summer rush
|
02.07.2019
|
2017/MC/141/2 pt
|
150th Birth anniversary celebration of Mahatma Gandhi
|
28.06.2019
|
2007/MC/137/2 vol i
|
Meeting through video conference of CWEs and CRSEs of Zonal Railways,
|
17.06.2019
|
2014/MC/141/2
|
CMM functionalities
|
14.06.2019
|
2019/MC/138/1
|
Uploading of PCDO data on MCDO portal.
|
13.06.2019
|
2018/MC/143/2
|
Foul smell from Bio-toilets/toilet ventilation
|
23.05.2019
|
2019/MC/142/4
|
Status of completion and requirement of funds for RSP works in 19-20
|
15.05.2019
|
2018/MC/142/4
|
Distribution of RSP work of LHB bogies with air spring in secondary suspension for conversion of non-air spring
|
09.05.2019
|
2001/MC/137/1 vol V pt.1
|
Provision of venture type toilet ventilation system in LHB
|
08.05.2019
|
2017/MC/141/8 pt
|
Status of project swarn
|
30.04.2019
|
2017/MC/137/15
|
Status of project utkrisht
|
30.04.2019
|
2017/MC/142/4 pt IV
|
Recommendation of committee on refurbishment of ICF coaches
|
22.04.2019
|
2007/MC/202/2
|
Change in name of Chennai central railway station
|
08.04.2019
|
2001/MC/137/1 Vol(x)
|
Special drive for maintenance of pantry cars and safety thereof.
|
05.04.2019
|
2007/MC/137/4
|
Design & infra issues in Train Set-18 rake under development at ICF
|
03.04.2019
|
2019/MC/142/4
|
Status of work for provision of Fire & smoke detection system in AC coaches and Fire detection & suppression system in power card & pantry cars
|
02.04.2019
|
2001/MC/137/1 vol.(x)
|
Maintenance of Non-AC pantry care having flame cooking and safety therein
|
02.04.2019
|
2018/MC/142/4
|
Distribution of RSP work of 900 LHB bogies with air spring in secondary suspension for conversion of non -air
|
01.04.2019
|
2018/MC/651/1
|
Inter Railway transfer of 164 coaches
|
26.03.2019
|
MM/Gaz/2019(1)
|
Railway board letter No ERB-1/2019/23/15 dated 19.03.2019
|
22.03.2019
|
2018/MC/142/4
|
Distribution of RSP work of provision of baraille signages in coaches.
|
19.03.2019
|
2007/MC/137/16 vol.XI
|
Provisional para No. 38 ragarding production and maintenance of LHB coaches in Indian Railway for inclusion in C&AG’s report for year ending 2018
|
07.03.2019
|
95/MC/141/1 pt
|
Pattern of maintenance of tejas train on Indian Railway.
|
07.03.2019
|
1996/MC/141/77 part
|
Distribution of Umbrella work under plan head 53 regarding setting up of quick watering arrangement
|
05.03.2019
|
2004/MC/137/8 pt ii
|
Maintenance practices phonic wheel earthing device & CTRB
|
22.02.2019
|
2016/MC/137/2 pt
|
Conversion of ICF/GS coaches into deen dayalu coaches during MLR
|
22.02.2019
|
98/MC/137/8 vol.I
|
Vinyl film for IR coaches
|
13.02.2019
|
2017/MC/137/15
|
Coverage of Suvidha express trains under project utkrisht.
|
06.02.2019
|
2018/MC/142/4
|
Provision of funds against bulk order RSP for 2018-19 Final modification.
|
06.02.2019
|
2018/MC/142/4
|
Expediting RSP works reg. Fire Safety
|
04.02.2019
|
97/MC/137/1 vol (Xii)
|
Replacement of muff design CBC of M/s FTRTIL with integral shank design CBC
|
04.02.2019
|
2019/MC/137/2 Vol ii
|
Standard marking on LHB coaches without on board mini pantry equipment
|
31.01.2019
|
2006/MC/137/20 vol (X) & (XII)
|
Quality of Rubber Profile for FRP window guide.
|
14.01.2019
|
2006/MC/141/28
|
Dispatch of overdue IOH/POH and without bio-toilet coaches for kumbh mela 2019
|
10.01.2019
|
2018/MC/142/4 pt II
|
Proposal for Re-appropriation of funds of RSP works.
|
09.01.2019
|
99/MC/141/21/ pt.2
|
Provision of Health faucet in IT coaches
|
08.01.2019
|
2017/MC/137/16 pt
|
Life of brake blocks of coaches
|
05.01.2019
|
2018/EnHM/08/02
|
150th birth anniversary of Mahatma Gandhi – Action plan of railways
|
23.04.2018
|
2018/MC/142/4
|
Distribution of RSP work of provision of fire extinguishers with anti theft arrangement in 15000 non ac coaches @ Rs 15000
|
13.03.2018
|
2015/MC/137/1
|
Schedule of technical requirement for refurbishing model rake coaches.
|
19.12.2017
|
2017/MC/58/2
|
Providing dustbins in bio-toilets
|
18.12.2017
|
2000/MC/141/8
|
Bio-toilet coaches-flushign & ventilation
|
18.10.2017
|