File No.
|
Subject
|
Date of Issue
|
2025 |
No.2023/CE-II/Safety/Instruction |
Ensuring effectiveness of rail-sleeper fittings through proper monitoring of Toe Load of ERCs. |
21.08.2025 |
No.2023/CE-II/Meeting/CTEs Conf. |
Manual execution of TSR & Deep Screening. |
19.08.2025 |
2025/CE-II/TK/TACell |
Establishment of Track Analytics Cell |
31.07.2025 |
2025/CE-II/WP/TRP/26-27 |
Track Renewal Proposals (TRP) for Works Programme 2026-27 |
30.07.2025 |
2019/CE-II/WP/PBC |
Revival of deleted works of LAW Book under PH-31 |
28.07.2025 |
2024/CE-II/Safety |
Working of Motor/Moped Trolley |
07.07.2025 |
2006/CE-II/MPW/1 |
Price of rails for preparation of estimates for Track Renewal Works 2026-27 |
25.06.2025 |
2023/CE-II/Safety/Instruction |
Instructions for maintenance of track on Ghat Sections and Sections having curve sharper than 5° on gradient steeper than 1 in 100. |
14.06.2025 |
2022/CE-II/TK/Turnout/Renewal |
Preparation of ESP on Digital Platform. |
14.05.2025 |
2025/CE-II/Meeting/CTE's Conf. |
Inclusion of progress of ISD (Increase in Sleeper Density) works in TSR(S). |
06.06.2025 |
2023/CE-II/Safety/Instruction |
Inspection of LWR/CWR Track Structures on Bridges |
30.05.2025 |
2023/CE-II/Safety/Instruction |
Lifting of track during maintenance work. |
29.05.2025 |
2016/CE-II/Safety/Precaution |
Monsoon precautions |
05.05.2025 |
No.2023/CE-II/TK/FencingPolicy |
Policy guidelines for providing safety fencing along the track |
23.04.2025 |
2025/CE-II/Meeting/CTE's Conf. |
Annual Track Renewal Targets for 2025-26. |
04.04.2025 |
2015/CE-II/TK/14 |
Safety Precautions at Worksites. |
26.03.2025 |
|
Movement of container Flat Wagon (BLC) and loaded EUR rakes on second and subsequent loops.
|
24.03.2025 |
2009/CE-II/Accident/Policy |
Movement of container Flat Wagon (BLC) and loaded EUR rakes on second and subsequent loops.
|
18.03.2025 |
2016/CE-II/Safety/Precaution |
Summer Precautions |
04.03.2025
|
2023/CE-II/Safety/Instruction |
Toe Load measurement |
10.02.2025 |
2023/CE-II/Safety/Instruction |
Precautions to be observed while working in LWR/CWR territory |
03.01.2025 |
2024 |
2023/CE-II/Safety/Instruction |
Annual Ballast Planning |
19.12.2024 |
2023/CE-II/Safety/Instruction |
Important Aspects regarding Ballast DMT Unloading. |
19.12.2024 |
2015/CE-II/TK/14 |
Yard Drainage Plan |
11.12.2024 |
2024/CE-II/Genl/Misc |
Periodical meetings of SrDEN/Cs & ADENs. |
29.11.2024 |
2016/CE-II/TS/2/CC+8+2t |
Operation of CC+8+2t (22.9t) loaded trains |
13.11.2024 |
2024/CE-II/WP/Umbrella/Yard |
Proposal for "Yard improvement and upgradation over Indian Railway |
08.11.2024 |
2024/CE-II/CRS/12810 |
CRS's recommendations in Preliminary Report on side collision of train no. 12810 (HWH-CSMT Mail) with Goods train no. N/JBCT in CKP Division of SECR on 30.07.2024.
.
|
18.10.2024 |
2024/CE-II/TK/Track Tolerance
|
Up-gradation of Track Maintenance Standards of Goods Loop Lines |
30.10.2024 |
2024/CE-II/TK/Track Tolerance
|
Up-gradation of Track Maintenance Standards of Passenger Loop Lines |
28.10.2024 |
2013/CE-II/TK/Security Patrolling |
Removal of unused/released P.Way materials |
17.10.2024 |
2016/CE-II/Safety/Precaution |
Winter precautions to prevent rail/weld failure-Safety of Track. |
15.10.2024 |
2019/CE-II/WP/Policy-UMB |
Procedure for processing of proposals in IRPSM and sanctioning of itemized works against Umbrella Works under Plan Head – 31 (Track Renewals) for WP 2024-25. |
09.09.2024 |
2019/CE-II/WP/Policy-UMB |
Procedure for processing of proposals in IRPSM and sanctioning of itemised works against Umbrela Works under Plan Head - 31(Track Renewals) for WP 2025-26 & onwards. |
17.08.2024 |
2019/CE-II/TS/25t |
Operation of 25t axle load over selected routes of IR |
23.07.2024 |
.2015/CE-II/TK/14 |
Maintenance of troublesome turnouts and other location |
11.07.2024 |
No.2006/CE-II/MPW/1 |
Price of rails, sleepers and fittings etc. for preparation of estimates for Track Renewal works 2025-26. |
04.07.2024 |
2024/CE-II/Safety |
Display of Single PSR Board |
20.06.24 |
2015/CE-II/TK/14 |
Improvement of Yards. |
06.06.24 |
2016/CE-II/Safety/Precaution |
Monsoon Precautions |
28.05.24 |
2023/CE-II/TK/Inspection |
Inspection of turnouts and other special structure of track |
03.05.24 |
2013/CE-II/TK/Security Patrolling |
Disposal of unused/released P.Way materials |
03.05.24 |
2024/CE-II/Genl./Misc. |
Issue of uniform and other accessories to Trackmen Keymen Mates and Patrolmen |
02.05.24 |
2023/CE-II/TK/Fencing Policy |
Safety Fencing Works Along the Track -Reg. |
06.05.2024 |
2016/CE-II/Safety/Precaution |
Monsoon precautions |
28.05.2024 |
2024/CE-II/Genl/Misc. |
Issue of uniform and other accessories to Trackmen Keymen Mates and Patrolmen |
02.05.2024 |
No.2024/CE-II/Meeting/CTE's Conf |
Annual Track Renewal Targets for 2024-25 |
21.03.2024 |
No.2016/CE-II/Safety/Precaution |
Summer Precaution |
29.02.2024 |
2023/CE-II/TK/Fencing Policy |
Details of proposed subways in relation with safety fencing along the track |
15.02.2024 |
|
2023 |
|
|
Safety precautions at Worksites |
21.09.23 |
2016/CE-II/Safety Precaution |
Winter precautions to prevent rail-weld failure - Safety of Track
|
21.09.23 |
2022/CE-1I/Board Meeting |
Provision of Engineering Time Allowance(ETA) for Faster execution of capacity enhancement/asset maintenance work |
11.08.23 |
2023/CE-II/TK/Inspection |
Overdue inspection and compliance thereof |
10.08.23 |
2016/CE-II/Safety Precaution |
Maintenance of track |
10.08.23 |
2006/CE-II/MPW/1
|
Price of rails, sleepers and fittings etc. for preparation of estimates for Track Renewal works 2024-25. |
20.07.2023 |
2023/CE-II/TK/Fencing Policy |
Safety fencing along the track.
|
09.06.2023 |
2016/CE-II/Safety/Precaution |
Monsoon precautions
|
05.06.2023 |
2023/CE-II/TK/Fencing Policy |
Safety fencing along the track.
|
15.05.2023 |
2023/CE-II/PRT/Engg. Shield |
Award of Engg Shield (2022-23) to be given during Railway Week Annual Function 2023. |
11.04.2023 |
2023/CE-II/TK/TKST |
Track Statistics as on 01.04.2023 |
05.04.2023 |
2023/CE-II/TK/FencingPolicy |
Safety fencing along the track. |
14.03.2023 |
2023/CE-II/Meeting/CTE's Conf. |
Annual Track Renewal Targets for 2023-24. |
14.03.2023 |
2016/CE-II/Safety/Precaution |
Summer Precaution |
01.03.2023 |
2023/CE-II/TK/Fencing Policy |
Policy guidelines for providing safety fencing along the track. |
16.02.2023 |
2017/CE-II/TK/HS/130 |
Raising of sectional Speed to 130 Kmph on BG Routes over Indian Railways. |
07.02.2023 |
2023/CE-II/TS/Sidings |
Track structure for existing loop lines and sidings for operation of higher axle loads. |
18.01.2023 |
2022 |
2022/CE-II/Safety/SRM/GVSY |
Nationwide campaign for gradient verification of all station yards. |
28.10.2022 |
2016/CE-II/Safety/Precaution |
Winter precautions to prevent rail/weld failure -Safety of track |
14.10.2022 |
2021/CE-II/TSC/10th Extraordinary |
Provision of ballastless track at major important stations and stations identified under Major Upgradation/Redevelopment |
29.09.2022 |
2019/CE-II/TS/25t |
Operation of 25t axle load on PSC (RT-2496) Sleepers upto 100 Kmph |
22.08.2022 |
2022/CE-II/TK/Turnout/Renewal |
Renewal of sleepers on Point and crossings. |
05.08.2022 |
2022/CE-II/WP/TRP/23-24 |
Provision of PSC Sleepers in Through Rail Renewal (Primary) works. |
04.08.2022 |
2006/CE-II/MPW/1 |
Price of rails sleepers and fittings etc. for preparation of estimates for Track Renewal works 2023-24. |
08.07.2022 |
2022/CE-II/Board Meeting |
Faster execution of capacity enhancement/asset maintenance works. |
16.06.2022 |
2022/CE-II/Board Meeting |
Faster execution of capacity enhancement/asset maintenance works. |
10.06.2022 |
2022/CE-II/TK/M3000MT
|
Mission 3000 MT. |
09.06.2022 |
2016/CE-II/Safety/Precaution
|
Monsoon Precautions. |
02.06.2022 |
2015/CE-II/TK/14
|
Safety Precautions at worksite |
12.05.2022 |
No.2015/CE-II/TK/14 |
Safety of Railway Staff. |
14.03.2022 |
2022/CE-II/PRT/Engg. Shield |
Award of Engg Shield (2021-22) to be given during Railway Week Annual Function 2022 |
10.02.2022 |
2021 |
2006/CE-II/MPW/1 |
Price of rails sleepers and fittings etc for preparation of estimates for Track renewal works 2022-23 |
15.12.2021 |
2016/CE-II/Safety Precaution |
Winter Precautions |
08.10.2021 |
2015/CE-II/TK/14 |
Safety at Worksite |
29.07.2021 |
2015/CE-II/TK/14 |
Safety at Worksite |
22.07.2021 |
2021/CE-II/TSC/10TH Extraordinary |
Revised norms of track maintenance and criteria of track renewal |
16.07.2021 |
2016/CE-II/Safety Precaution |
Monsoon Precautions |
24.05.2021 |
2013/CE-II/TK/Security Patrolling |
Disposal of unused P.Way material |
01.04.2021 |
2016/CE-II/Safety Precaution |
Summer Precautions |
01.03.2021 |
2018/CE-II/Meeting/Board Meeting |
Incidents involving bursting of blocks |
18.01.2021 |
2020 |
2019/CE-II/TK/ROI |
Inspection Schedule of Sr. DEN/DEN |
23.12.2020 |
2006/CE-II/MPW/1 |
Price of rails sleepers and fittings etc for preparation of estimates for Track Renewal works 2021-22 |
21.12.2020 |
2019/CE-II/Safety/Precaution |
Winter precautions to prevent rail/weld failure-Safety of Track |
07.10.2020 |
2019/CE-II/TS/25T |
Operation of 25 ton axle load over selected routes of IR and feeder routes of DFC |
01.09.2020 |
2019/CE-II/TSC/88/Puri |
Track Structure for operation of CC+8+2t Loaded trains. |
28.08.2020 |
2018/CE-II/TK/WIAST |
Speed of entry in 1st Loop to be enhanced from 30 kmph to 50 kmph |
24.08.2020 |
2018/CE-II/TK/S&T/AGL&DH |
Improving performance of Track-Avoiding requirement of Glued Joints and Drilling of holes in rails for S&T and Traction Installation (TI) fixtures. |
20.08.2020 |
2009/CE-II/Accident/Policy |
Negotiability of BLC/BCLC Container wagons on loops |
20.08.2020 |
2020/CE-II/TS/22.9 |
Operation of 22.9 ton axle load wagons at 75 kmph |
20.08.2020 |
2017/CE-II/TK/HS/130 |
Raising of sectional speed to 130 kmph on the routes of Golden Quadrilateral and the diagonals routes |
03.06.2020 |
2016/CE-II/Safety/Precaution |
Monsoon Precautions |
28.05.2020 |
2020/CE-II/Mtg/CTEs/Conference |
Annual Track Revewal Target for 2020-21 |
23.04.2020 |
2017/CE-II/TK/HS/130 |
Rasing of Sectional Speed of sections having present speed less than 100 kmph. |
12.03.2020 |
2016/CE-II/Safety/Precaution |
Summer Precautions |
03.03.2020 |
2020/CE-II/PRT/Engg.Shield |
Award of Engg. Shield(2019-20) to be given during Railway Week Annual Function 2020 |
07.01.2020 |
2019 |
2017/CE-II/TK/Policy |
Provision of GPS Trackers to Keymen and Patrolmen. |
17.12.2019 |
2019/CE-II/TK/160/NDLS-Howrah |
Raising of sectional speed to 130 kmph on the routes of Golden Quadrilateral and the diagonal routes. |
17.12.2019 |
2006/CE-II/MPW/1 |
Price of rails, sleepers and fittings etc. for preparation of estmates for Track Renewal works 2020-21 |
10.12.2019 |
2016/CE-II/Safety/Precaution |
Winter precautions to prevent rail/weld failure - Safety of Track |
27.09.2019 |
2017/CE-II/Accd/Reporting by ZR |
Reporting of Accidents/Unusual incidents |
25.07.2019 |
2017/CE-II/TK/Policy |
Obstructions in newly commissioned track |
20.05.2019 |
2016/CE-II/Safety/Precaution |
Monsoon Precautions |
03.05.2019 |
2016/CE-II/Safety/Precaution |
Summer Precautions |
14.03.2019 |
2019/CE-II/PRT/Engg. Shield |
Award of Engg. Shield (2018-19 to be given during Railway Week Annual Function |
25.02.2019 |
2018 |
2006/CE-II/MPW/1 |
Price of rails, sleepers and fitting etc. for preparation of estimates for Track Renewal works 2019-20. |
30.11.2018 |
2013/CE-II/TS/DFC(Feeder Route) |
Progress of works relating to upgradation of Feeder routes of DFC |
28.11.2018 |
2015/CE-II/TK/14 |
Safety precautions at Worksites. |
06.11.2018 |
2018/CE-II/Meeting /1Pt. |
Construction of Ballastless Track on Run Through Main Lines at ‘A-1’ & ‘A’ category stations |
31.10.2018 |
2018/CE-II/Safety/ Boundary wall |
Upkeep of station Yards |
15.10.2018 |
2012/CE-II/TRACKMEN REPORT/Pt. |
Provision of VHF based approaching Train Warning System for Track Maintenance on Golden Quadrilateral & its Diagonals on Indian railways |
12.10.2018 |
2012/CE-II/TK/TRACKMEN REPORT/Pt |
Provision of VHF based approaching Train Warning System for Track Maintenance on Golden Quadrilateral & its Diagonals on Indian railways |
11.10.2018 |
2016/CE-II/Safety/Precaution |
Winter Precaution to prevent rail/weld Failure – Safety of Track |
09.10.2018 |
2018/CE-II/TK/HS/GQ-160 |
Speed Policy Frame work for Indian Railways |
08.10.2018 |
2017/CE-II/WP/18-19/RB |
Monitoring health of ballast bed with the help of Ground Penetration Radar Technology for Through Ballast Renewal (TBR)and formation Rehabilitation on Indian Railways |
|
2018/CE-II/TK/WIAST |
Order of priority for raising speed on Main line turnouts to 50 kmph12.09.2019 |
11.09.2018 |
2010/CE-II/TK/PSR |
Increase in Speed Turnouts |
7.08.2018 |
2016/CE-II/TS /2(CC+8+2) |
Operation of CC+8+2/CC+6+2 trains |
24.08.2018 |
2017/CE-II/TK/POLICY |
Construction of Ballastless Track on Run Through Main Lines at ‘A-1’ & ‘A’ category stations |
03.08.2018 |
2015/CE-II/TK/14 |
Safety at work sites. |
25.07.2018 |
2017/CE-II/WP/18-19/SER |
Anomaly in particulars of sanction work item No.424 in Pink Book 2018-19 under Plan Head-31 of South Eastern Railway. |
25.07.2018 |
2013/CE-II/TS/DFC(Feeder Route) |
Track renewal on DFC Feeder and 25t axle load routes. |
20.07.2018 |
2018/CE-II/TS/2(CC+2+2t) |
Delegation of powers to Zonal Railways for approval of running of CC+8+2t trains. |
19.07.2018 |
2018/CE-II/TS/25T |
Running of 25 Tonne axle load freight train on Indian Railway – Rail Stress Calculation. |
21.06.2018 |
2016/CE-II/Safety/Precaution |
Monson precaution |
19.06.2018 |
2016/CE-II/TSC/1 |
Railway Board’s orders on Minutes of 9th Extra-ordinary meeting of Track Standard Committee held at IRICEN/Pune from 18.01.2018 and 19.01.2018. |
14.06.2018 |
2018/CE-II/TS/1(Proposal) |
Running of Freight Trains with CC+8+2t loading |
25.04.2018 |
2018/CE-II/Meeting/1Pt. |
Minutes of chief Track Engineer’s Conference held at New Delhi on 23rd March, 2018 |
24.04.2018 |
2018/CE-II/WP/18-19/GPWS/RB Pt. |
Budget Outlay for providing ‘VHF based approaching Train Warning System for track maintainer’ on golden Quadrilateral & its diagonal on Indian Railways. |
02.04.2018 |
No.2017/CE-II/Meeting/1
|
Annual Track Renewal Targets for 2018-19
|
27.03.2018
|
D.O.No.2017/CE-II/TK/HS/130
|
Raising maximum permissible speed of sections
|
21.03.2018
|
No.2017/CE-II/TS/2Pt.(Proposal)
|
Running of Freight Trains with CC+8+2t loading.
|
15.03.2018
|
No.2018/CE-II/TS/25T
|
Track Structure for Operation of 25T Axle Load Trains.
|
14.03.2018
|
No.2018/CE-II/TS/25T
|
Operation of 25T Axle Load Trains.
|
14.03.2018
|
No.2018/CE-II/PCDO/Assistance Required
|
Reporting Progress of Track Renewal items in PCDO
|
09.03.2018
|
`No.2017/CE-II/TK/Policy
|
Committee for dealing with the issues relating to “Ruining of high speed and semi high speed trains”
|
08.03.2018
|
No.2011/CE-II/Form/Spec
|
Guidelines for Construction of Formation on Indian Railways.
|
01.03.2018
|
No.2016/CE-II/Safety/Precaution
|
Summer Precautions
|
28.02.2018
|
No.2017/CE-II/TS/2(Proposal)
|
Running of Freight Trains with CC+8+2t loading
|
16.02.2018
|
No.2018/CE-II/PCDO/Assistance Required
|
Revision of Proforma of Performance Progress Report Annexure-1 of PCDO to ME
|
06.02.2018
|
D.O.No.2015/CE-II/TK/KRCL
|
Adoption of Konkan Railway System of Track Maintenance on Indian Railway.
|
09.01.2018
|