Search Documents(Date Wise)   Search | Hindi | Increase Font size Increase Font size Increase Font size|
Indian Railway main logo
भारतीय रेल राष्ट्र की जीवन रेखा...
INDIAN RAILWAYS Lifeline to the Nation...
National Emblem of India
National Emblem of India
MCNTM
IR UNIFIED SCHEDULE OF RATES & SPECIFICATIONS(P Way)
Joint Committee Report
CD
MGNREGA Related Matter
ODC
IRICEN & IRSE Probationers
IRBM
NID
test1
Technology Mission for Indian Railways
General Condition of Contract July 2014
Bridges Codes & Manual
Indian Railways Engineering Code
IR P. Way Manual
IR Works Manual
Advisory Group of Experts (AGE)
Malaviya_Chair
letters Public Carriage Passengers Rules,2000
Railway Opening for Public Carriage of Passengers Rules’2000
Policy_Circular_6
Policy_Circular_No_6
e-tendering in Works Contract
EPC_Single_Stage_Standard_Tender_Document
IRUSSOR
System Maps
Project Management
Schedule of Rates, Analysis of Rates and Specifications 2021
CONTRACT & ARBITRATION
ENGG.CODE
IR UNIFIED SCHEDULE OF RATES & SPECIFICATIONS
POLICY_MATTERS_OTHERS
Railway Sidings
ENGG.CODE
GCC
IRSOD_ACS_2004
IRPWM
IR WORKS MANUAL
Circulars-1998
परिपत्र- 1998
Testing
Schedule of Rates, Analysis of Rates and Specifications
SANCTION LETTERS
BANNING OF BUSINESS
OTHERS
Railway_sliding_hindi
Schedule_Rates_Analysis
CEDO_Guard_Files
Miscellaneous
Trackmen Related Matters
IR General Condition of Contracts
Works Programme, Works Contracts & Arbitration and Other related Circulars
bkup
IRSOD


 
CE-II Circulars

 

 

File No.

Subject

Date  of Issue

2023

2006/CE-II/MPW/1

Price of rails, sleepers and fittings etc. for preparation of estimates for Track Renewal works 2024-25. 20.07.2023
2023/CE-II/TK/Fencing Policy

Safety fencing along the track.

09.06.2023
2016/CE-II/Safety/Precaution

Monsoon precautions

05.06.2023
2023/CE-II/TK/Fencing Policy

Safety fencing along the track.

15.05.2023
2023/CE-II/PRT/Engg. Shield Award of Engg Shield (2022-23) to be given during Railway Week Annual Function 2023. 11.04.2023
2023/CE-II/TK/TKST Track Statistics as on 01.04.2023 05.04.2023
2023/CE-II/TK/FencingPolicy Safety fencing along the track. 14.03.2023
 2023/CE-II/Meeting/CTE's Conf. Annual Track Renewal Targets for 2023-24. 14.03.2023
2016/CE-II/Safety/Precaution Summer Precaution 01.03.2023
2023/CE-II/TK/Fencing Policy Policy guidelines for providing safety fencing along the track. 16.02.2023
2017/CE-II/TK/HS/130 Raising of sectional Speed to 130 Kmph on BG Routes over Indian Railways.  07.02.2023
2023/CE-II/TS/Sidings Track structure for existing loop lines and sidings for operation of higher axle loads. 18.01.2023
2022
2022/CE-II/Safety/SRM/GVSY Nationwide campaign for gradient verification of all station yards. 28.10.2022
2016/CE-II/Safety/Precaution Winter precautions to prevent rail/weld failure -Safety of track 14.10.2022
2021/CE-II/TSC/10th Extraordinary Provision of ballastless track at major important stations and stations identified under Major Upgradation/Redevelopment 29.09.2022
2019/CE-II/TS/25t Operation of 25t axle load on PSC (RT-2496) Sleepers upto 100 Kmph   22.08.2022
2022/CE-II/TK/Turnout/Renewal  Renewal of sleepers on Point and crossings.  05.08.2022
2022/CE-II/WP/TRP/23-24  Provision of PSC Sleepers in Through Rail Renewal (Primary) works. 04.08.2022
2006/CE-II/MPW/1 Price of rails sleepers and fittings etc. for preparation of estimates for Track Renewal works 2023-24. 08.07.2022
2022/CE-II/Board Meeting Faster execution of capacity enhancement/asset maintenance works. 16.06.2022
2022/CE-II/Board Meeting Faster execution of capacity enhancement/asset maintenance works.   10.06.2022

2022/CE-II/TK/M3000MT

Mission 3000 MT.   09.06.2022

 2016/CE-II/Safety/Precaution

Monsoon Precautions. 02.06.2022

2015/CE-II/TK/14

Safety Precautions at worksite 12.05.2022
No.2015/CE-II/TK/14  Safety of Railway Staff. 14.03.2022
2022/CE-II/PRT/Engg. Shield Award of Engg Shield (2021-22) to be given during Railway Week Annual Function 2022 10.02.2022
2021
2006/CE-II/MPW/1 Price of rails sleepers and fittings etc for preparation of estimates for Track renewal works 2022-23 15.12.2021
2016/CE-II/Safety Precaution Winter Precautions   08.10.2021
2015/CE-II/TK/14 Safety at Worksite 29.07.2021
2015/CE-II/TK/14 Safety at Worksite 22.07.2021
2021/CE-II/TSC/10TH  Extraordinary Revised norms of track maintenance and criteria of track renewal 16.07.2021
2016/CE-II/Safety Precaution Monsoon Precautions  24.05.2021
2013/CE-II/TK/Security Patrolling Disposal of unused P.Way material 01.04.2021
2016/CE-II/Safety Precaution Summer Precautions  01.03.2021
2018/CE-II/Meeting/Board Meeting  Incidents involving bursting of blocks 18.01.2021
2020
2019/CE-II/TK/ROI Inspection Schedule of Sr. DEN/DEN 23.12.2020
2006/CE-II/MPW/1 Price of rails sleepers and fittings etc for preparation of estimates for Track Renewal works 2021-22 21.12.2020
2019/CE-II/Safety/Precaution Winter precautions to prevent rail/weld failure-Safety of Track 07.10.2020
2018/CE-II/TK/WIAST Speed of entry in 1st Loop to be enhanced from 30 kmph to 50 kmph 24.08.2020
2018/CE-II/TK/S&T/AGL&DH Improving performance of Track-Avoiding requirement of Glued Joints and Drilling of holes in rails for S&T and Traction Installation (TI) fixtures. 20.08.2020
2009/CE-II/Accident/Policy Negotiability of BLC/BCLC Container wagons on loops 20.08.2020
2020/CE-II/TS/22.9 Operation of 22.9 ton axle load wagons at 75 kmph 20.08.2020
2017/CE-II/TK/HS/130 Raising of sectional speed to 130 kmph on the routes of Golden Quadrilateral and the diagonals routes 03.06.2020
2016/CE-II/Safety/Precaution Monsoon Precautions 28.05.2020
2020/CE-II/Mtg/CTEs/Conference Annual Track Revewal Target for 2020-21 23.04.2020
2017/CE-II/TK/HS/130 Rasing of Sectional Speed of sections having present speed less than 100 kmph. 12.03.2020
2016/CE-II/Safety/Precaution Summer Precautions 03.03.2020
2020/CE-II/PRT/Engg.Shield Award of Engg. Shield(2019-20) to be given during Railway Week Annual Function 2020 07.01.2020
2019
2017/CE-II/TK/Policy Provision of GPS Trackers to Keymen and Patrolmen. 17.12.2019
2019/CE-II/TK/160/NDLS-Howrah Raising of sectional speed to 130 kmph on the routes of Golden Quadrilateral and the diagonal routes. 17.12.2019
2006/CE-II/MPW/1 Price of rails, sleepers and fittings etc. for preparation of estmates for Track Renewal works 2020-21 10.12.2019
2016/CE-II/Safety/Precaution Winter precautions to prevent rail/weld failure - Safety of Track 27.09.2019
2019/CE-II/TS/25T Operation of 25 ton axle load over selected routes of IR and feeder routews of DFC 01.09.2019
2017/CE-II/Accd/Reporting by ZR Reporting of Accidents/Unusual incidents 25.07.2019
2017/CE-II/TK/Policy Obstructions in newly commissioned track 20.05.2019
2016/CE-II/Safety/Precaution Monsoon Precautions 03.05.2019
2016/CE-II/Safety/Precaution Summer Precautions 14.03.2019
2019/CE-II/PRT/Engg. Shield Award of Engg. Shield (2018-19 to be given during Railway Week Annual Function 25.02.2019
2018
2006/CE-II/MPW/1 Price of rails, sleepers and fitting etc. for preparation of estimates for Track Renewal works 2019-20. 30.11.2018
2013/CE-II/TS/DFC(Feeder Route) Progress of works relating to upgradation of Feeder routes of DFC 28.11.2018
2015/CE-II/TK/14 Safety precautions at Worksites. 06.11.2018
2018/CE-II/Meeting /1Pt. Construction of Ballastless Track on Run Through Main Lines at ‘A-1’ & ‘A’ category stations 31.10.2018
2018/CE-II/Safety/ Boundary wall Upkeep of station Yards 15.10.2018
2012/CE-II/TRACKMEN REPORT/Pt. Provision of VHF based approaching Train Warning System for Track Maintenance on Golden Quadrilateral & its Diagonals on Indian railways 12.10.2018
2012/CE-II/TK/TRACKMEN REPORT/Pt Provision of VHF based approaching Train Warning System for Track Maintenance on Golden Quadrilateral & its Diagonals on Indian railways 11.10.2018
2016/CE-II/Safety/Precaution Winter Precaution to prevent rail/weld Failure – Safety of Track 09.10.2018
2018/CE-II/TK/HS/GQ-160 Speed Policy Frame work for Indian Railways 08.10.2018
2017/CE-II/WP/18-19/RB Monitoring health of ballast bed with the help of Ground Penetration  Radar Technology for Through Ballast Renewal (TBR)and formation Rehabilitation on Indian Railways  
2018/CE-II/TK/WIAST Order of priority for raising speed on Main line turnouts to 50 kmph12.09.2019 11.09.2018
2010/CE-II/TK/PSR Increase in Speed Turnouts 7.08.2018
2016/CE-II/TS /2(CC+8+2) Operation of CC+8+2/CC+6+2 trains 24.08.2018
2017/CE-II/TK/POLICY Construction of Ballastless Track on Run Through Main Lines at ‘A-1’ & ‘A’ category stations 03.08.2018
2015/CE-II/TK/14 Safety at work sites.  25.07.2018
2017/CE-II/WP/18-19/SER Anomaly in particulars of sanction work item No.424 in Pink Book 2018-19 under Plan Head-31 of South Eastern Railway.  25.07.2018
2013/CE-II/TS/DFC(Feeder Route) Track renewal on DFC Feeder and 25t axle load routes.  20.07.2018
2018/CE-II/TS/2(CC+2+2t) Delegation of powers to Zonal Railways for approval of running of CC+8+2t trains. 19.07.2018
2018/CE-II/TS/25T Running of 25 Tonne axle load freight train on Indian Railway – Rail Stress Calculation.  21.06.2018
2016/CE-II/Safety/Precaution  Monson precaution  19.06.2018
2016/CE-II/TSC/1 Railway Board’s orders on Minutes of 9th Extra-ordinary meeting of Track Standard Committee held at IRICEN/Pune from 18.01.2018 and 19.01.2018. 14.06.2018
2018/CE-II/TS/1(Proposal) Running of Freight Trains with CC+8+2t loading 25.04.2018
2018/CE-II/Meeting/1Pt. Minutes of chief Track Engineer’s Conference held at New Delhi on 23rd March, 2018 24.04.2018
2018/CE-II/WP/18-19/GPWS/RB Pt.  Budget Outlay for providing ‘VHF based approaching Train Warning System for track maintainer’ on golden Quadrilateral & its diagonal on Indian Railways.  02.04.2018

No.2017/CE-II/Meeting/1

Annual Track Renewal Targets for 2018-19

27.03.2018

D.O.No.2017/CE-II/TK/HS/130

Raising maximum permissible speed of sections

21.03.2018

No.2017/CE-II/TS/2Pt.(Proposal)

Running of Freight Trains with CC+8+2t loading.

15.03.2018

No.2018/CE-II/TS/25T

Track Structure for Operation of 25T Axle Load Trains.

14.03.2018

No.2018/CE-II/TS/25T

Operation of 25T Axle Load Trains.

14.03.2018

No.2018/CE-II/PCDO/Assistance Required

Reporting Progress of Track Renewal items in PCDO

09.03.2018

`No.2017/CE-II/TK/Policy

Committee for dealing with the issues relating to “Ruining of high speed and semi high speed trains”

08.03.2018

No.2011/CE-II/Form/Spec

Guidelines for Construction of Formation on Indian Railways.

01.03.2018

No.2016/CE-II/Safety/Precaution

Summer Precautions

28.02.2018

No.2017/CE-II/TS/2(Proposal)

Running of Freight Trains with CC+8+2t loading

16.02.2018

No.2018/CE-II/PCDO/Assistance Required

Revision of Proforma of Performance Progress Report Annexure-1 of PCDO to ME

06.02.2018

D.O.No.2015/CE-II/TK/KRCL

Adoption of Konkan Railway System of Track Maintenance on Indian Railway.

09.01.2018

2017/CE-II/Meeting/2 Minutes of Principal Chief Engineers and Chief Administrative Officers’ (Construction) Conference held at New Delhi from 10th to 12th November, 2017.  22.12.2017
2017/CE-II/PRT/Perf/Review Execution of safety related works by the Civil Engineering Department.  14.12.2017

No.2017/CE-II/TK/HS/Trial-115

Oscillation trial stock for trials for speed upto 115 kmph

07.12.2017

2016/CE-II/TSC/1 86th meeting of Track Standards Committee held on 21st to 23rd December, 2016 at Guwahati.  06.12.2017
2017/CE-II/TK/Presentation  Minutes of Video Conference held by Chairman, Railway Board with General Managers on 27.11.2017 05.12.2017

No.2017/CE-II/TK/Presentation

Minutes of Video Conference held by Chairman, Railway Board with General Managers on 27.11.2017

05.12.2017

No.20111/CE-II/TK/LWR Instrumentation of rails. 04.12.2017

No.2017/CE-II/TK/Policy/Pt

Provision of GPS trackers to all patrolmen and outsourcing activity of patrolling  

17.11.2017

No.2017/CE-II/Safety/Boundary Wall

Beautification of tracks & cleaning of mud and trash along the tracks.

15.11.2017

No.2017/CE-II/Safety/Boundary Wall

Providing wire mesh along the boundary line of tracks to restrict throwing of garbage/plastic and bags

15.11.2017

No.2014/CE-II/Genl/DC/JCM

DC/JCM Item No.24/2011 – Provision of accommodation to Trackmen in Accident Relief Trains.

26.10.2017

No.2017/CE-II/PLG/1

Submission of proposals for Works Programme 2018-19 chargeable to RRSK

17.10.2017

No.2016/CE-II/Accident/Policy

Repairs to scissors crossovers, diamond crossings and washable aprons

13.09.2017

No./2016/CE-II/TK/1

Telemetry enablement and connecting with TMS for Continuous Rail Temperature (CRRT)Measurement Device.

12.09.2017

No.2016/CE-II/Safety/Precaution

Winter precautions to prevent rail/weld failure-Safety of Track.

06.09.2017

No.2017/CE-II/Mtg./Review of PBW

Reviewing the Progress of Project Monitoring of Pink Book works through E-Drishti.

01.08.2017

No.2017/CE-II/WP/TRP

Track Renewal Proposals (TRP) for Works Programme 2018-19

24.07.2017

No.2015/CE-II/TK/High Speed/Delhi-Mumbai-Ahmedabad 

Trial of electric locomotive fit to run at 200 kemps

21.07.2017

No.2015/CE-II/Meeting/4 Bd. Mtg.

Action Taken Report on Minutes of Board Meeting

14.07.2017

No.2017/CE-II/DT/1 Removal of Permanent Speed Restrictions on Delhi – Mumbai corridor. 28.06.2017
No.2008/CE-II/WP/31 Closure of Railway line from Dhanbad to Chandrapura due to fire and subsidence in Jharia & Raniganj Coal Field. 22.06.2017
No.2009/CE-II/TK/1(Policy) Track Maintenance issue 19.06.2017
No.2017/CE-II/Mtg/Review of PBW Reviewing the progress of project monitoring of pink book works through e-drishti. 15.06.2017
No.2016/CE-II/Safety/Precaution Monsoon Precautions and Patrolling. 18.05.2017
No.2016/CE-II/Safety/Precaution Monsoon Precautions. 16.05.2017
No.2009/CE-II/TK/1(Policy Measurement of Clean Track Ballast Cushion and Updation of details in Track Diagram 12.04.2017

No.2016/CE-II/Safety/Precaution

Summer Precautions

03.03.2017

D.O.No.2017/CE-II/Accd/Reporting by ZR

Reporting of Accidents.

03.03.2017

No.2006/CE-II/TS/1Pt.

Availability and working of Weighbridges

01.03.2017

No.2017/CE-II/PRT/Engg./Shield

Award of Engg. Shield (2016-17)to bve given during Railway Week Annual Function – 2017

07.02.2017

No.2009/CE-II/TK/1 (Policy)

Track laying standards

02.02.2017

No.2016/CE-II/Genl./PNM/Matter

Provision of protective Helmets with Miner’s Lights to patrolmen.

20.12.2016

No.2006/CE-II/MPW/1

Price of Rails, sleepers and fittings etc. for preparation of estimates for Track Renewal works 2017-18

20.12.2016

D.O. No.2016/CE-II/Accident/Policy/Pt.3

Safety – Increasing instances of Sudden Rail Fractures – Overdue track attention.

08.12.2016

D.O. No.2016/CE-II/Accident/Policy/Pt.3

Safety measures: inspection and maintenance of assets.

25.112016

No.2016/CE-II/Safety/Precaution

Winter Precautions to prevent rail/weld failure – Safety of track.

21.11.2016

No.2016/CE-II/TK/Mission Raftar

Upgradation of Delhi-Mumbai and Delhi-Howrah Routes.

17.112017

No.2016/CE-II/Genl./Misc

Distribution of RETS publication to Field personnels.

03.112016

D.O.No.2016/CE-II/Accident/Policy

Special Safety Drive for USFD Testing of wheel burnt/scabbed rails Regarding Right Powering of Trains.

30.09.2016

No.2010/CE-II/TK/4/PSR

Increase in Sectional Speed and Speed on Turnouts

20.09.2016

No.2016/CE-II/Accident/Policy/Pt.3

Directions of Hon’ble Minister Railways

09.09.2016

No.2016/CE-II/Accident/Policy

Special Drive for USFD Testing of Wheel burnt/scabbed rail locations.

31.08.2016

No.2016/CE-II/Genl./Misc

Objective evaluation of SSEs/P.Way by Zonal Railways

23.08.2016

No.2016/CE-II/TS/2 (C+8+2)

Running of Freight Trains with CC+8+2t loading

10.08.2016

No.2016/CE-II/Accident/Policy

Special Drive for inspection and attention to yards and vulnerable locations.

01.07.2016

No.2009/CE-II/TK/1(Policy)

Recording of Track Parameters by TRC/OMS and monitoring of Track.

30.06.2016

No.2009/CE-II/TK/1(Policy)

Provision of 1mtr. long fish plate at fish plated joints on concrete sleepers.

29.06.2016

No.2014/CE-II/Genl/PNM

Tools and Equipments of P.Way Gang

17.06.2016

No.2007/EDC(P)/Insp. Note

Inspection of Centralized Training institute

07.06.2016

No.2013/CE-II/TS/DFC(Feeder Routes)

Specifications of PSC sleepers on 25t routes

27.05.2016

No.2016/CE-II/Safety Precaution

Monsoon Precautions.

09.05.2016

No.2014/CE-II/Genl/PNM

Equipments of Keyman (Para 169 of IRPWM)

02.05.2016

No.2011/CE-II/Accident/ Policy

Directed maintenance of major yards.

04.04.2016


 




Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 08-08-2023  

Admin Login |  Site Map  |  Contact Us  |  RTI  |  Disclaimer  |  Terms & Conditions  |  Privacy Policy  Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.