Screen Reader Access Search Documents(Date Wise)   Search | Hindi | Increase Font size Increase Font size Increase Font size|
Indian Railway main logo
भारतीय रेल राष्ट्र की जीवन रेखा...
INDIAN RAILWAYS Lifeline to the Nation...
National Emblem of India
National Emblem of India
About Indian Railways
   Corporate Overview
      Railway Board Directorates
         Track
            Track-III Policy Letters


 
Track-III Policy Letters

Track Machine Dte.

 

List of Instructions issued to zonal railways during the last five years.

Letter No.

Dated

Subject

Address to whom

2021/Track-III/TK12

23.07.2025

Correction Slip No.7 to Indian Railway Track Machine Manual (IRTMM- 2019).

All Zonal Railway

2021/Track-III/TK12

16.06.2025

Correction Slip No.6 to Indian Railway Track Machine Manual (IRTMM- 2019).

All Zonal Railway

2017/Track-III/TK/6Pt.II

19.02.2025

Installation of RFID Tags on Indian Railway in Connection with Track Recording.

Principal Chief Engineers

All Zonal Railways.

2004/Track-III/TK/14 Vol.II

15.01.2025

Trial of Provision of KAVACH in RBMV (Self-Propelled Track Machine).

Principal Chief Engineers

NR and NCR

2024/Track-III/TK/6

07.01.2025

Allotment of locomotives to each Zonal Railway to exclusively work with MDUs (Muck Disposal Unit).

General Managers,

AII Zonal Railways.

2024/Track-III/TK/2

22.01.2025

Minutes of the Board Meeting held in Ministry of Railways on 04-09-2024 Item A1 – regarding Review of Safety.

Principal Chief Engineers

All Zonal Railways.

2004/Track-III/TK/14 Vol.II

11.12.2024

Provision of Dead Man’s Handle (DMH)/ Vigilance Control Device (VCD) in track machines on IR.

Principal Chief Engineers,

All Indian Railways.

2024/Track-III/TK/2

22.11.2024

Thermal scanning of electrical circuits in coaches.

Principal Chief Engineers,

All Indian Railways.

2021/Track-III/TK/12 14.11.2024 Correction Slip No.5 to Indian Railway Track Machine Manual (IRTMM-2019).  

2019/Track-III/TK/13

14.11.2024

Provision of Proximity Sensors in the track machines to prevent dashing of machine.

PED/Infra-1/RDSO

2020/Track-III/TK/13

11.11.2024

Precautions to be taken while availing the traffic block

for the work of track machines

PCE/NER

2017/Track-III/TK/6 Pt.II

06.11.2024

Working of BCM machines:- Lifting of track by BCMs

Principal Chief Engineers,

All Indian Railways.

2023/Track-III/TK/11

25.10.2024

Model Tender document for Operation & Maintenance (O&M) of IR owned track machines.

General Manager,

All Indian Railways

2010/Track-III/TK/15

22.10.2024

Creation of manpower for Track Machines.

Principal Chief Engineer,

NFR

2024/Track-III/TK/2

15.10.2024

Minutes of the Board Meeting held in Ministry of Railways on 04-09-2024 Item A1 – regarding Review of Safety.

Principal Chief Engineers

All Zonal Railways.

2024/Track-III/TK/6

14.10.2024

Utilisation of various important features provided in MPT machines.

Principal Chief Engineers

All Zonal Railways

2017/Track-III/TK/6 Pt.II

11.10.2024

Speedy implementation of Track Machine Management System (TMMS) module on the Railways.

Principal Chief Engineer

All Zonal Railways

2024/Track-III/TK/2

17.09.2024

Minutes of the Board Meeting held in Ministry of Railways on 04-09-2024 Item A1 – regarding Review of Safety.

Principal Chief Engineers

All Zonal Railways.

2021/Track-III/TK/6

02.08.2024

One Month Intensive Safety Drive.

Principal Chief Engineers

All Zonal Railways.

       
2016/Track-III/TK/4 22.07.2024 Rehabilitation of BCM and making them fir for working on platform lines.  
2023/Track-III/RSP/2024-25/Pt.1 02.07.2024 Modification /Technical Upgradation of existing M/s Plasser make HOT-3X, HOT-CSM & BCM machines under Mid-lif Rehabilitation (MLR) to improve performance of the existing old machines.  
2019/Track-III/TK/Misc. 20.06.2024 Broad guidelines of the Operation and Maintenance (O&M) of Track Machines by Contractor’s manpower.  
2023/Track-III/TK/11 03.06.2024 Outsourcing of Operation & Maintenance of Track Machine for a period of two years in East Central railway.  
2019/Track-III/TK/Misc 30.05.2024 Replacement of engines on Track Machine other them the originally fitted engines  
2010/Track-III/TK/15 Vol.II Pt.3 18.03.2024 Outsourcing of staff required for operation & maintenance of track machines beyond sanctioned posts in Track Machine organization.  
2020/Track-III/TK/26 06.03.2024 Grouping of Points & Crossing Machines (T-28 machines).  
2020/Track-III/TK/24 06.03.2024 Reviewing the frequency of Track Recording Run by TRCs as specified in Para 506 of IRPWM-2020.  
No.2021/Track-III/TK/12 Date 02.02.2024 Correction Slip No.4 to Indian Railway Track Machine Manual (IRTMM-2019).  
2023/Track-III/TK/9 23.01.2024 One man Expert Committee to draw Road Map improvement of Track Inspection and maintenance on Indian Railways.  

No. 2017/Track-lII/Tk/6 Pt.ll

22.12.23

Implementation of Track Machine Management System (TMMS) application

Principal Chief Engineer North Central Railway

No. 2020/Track-lll/TK/20

15.12.23

Entry of PoH of the machines in TMs Module

Principal Chief Engineer, All zonal Railways

No. 2020/Track-lll/TK/20

29.11.23

 Reduction of time duration during IOH / POH of track machines.

Principal Chief Engineer, All zonal Railways

No.2019/TRACK-III/TK/16

23.11.23

Damage of TRCS due to infringement within MMD Envelop of track

Principal Chief Engineer, All zonal Railways

2023 Track-III/TK/11

10.11.23

Service Contract for Deep Screening by contractor's Ballast Cleaning Machine (BCM) and allied machines and Contractor's manpower and Service Contract for track renewal by Contractor's Track Relaying Train (TRT) and allied machines and Contractor's manpower - regarding the submission of EMD through Bank Guarantee.

Principal Chief Engineer, All zonal Railways

No. 2019/Track-III/TK/ 30

31.10.23

 Off Track Tamper (Engine Mounted Version) as per RDSO Specification- TM/SM/OTl l32l-regarding carrying out trials

Principal Chief Engineer, All zonal Railways

No.2022 Track-lll/TK/Misc./2

26.10.23

Design mode tamping of track.

Principal Chief Engineer, All zonal Railways

No. 2019 Track-III/TK/16

26.10.23

 Wiping out arrears of overdue track recording by optimum utilization of Track Recording Cars (TRCs).

Principal Chief Engineer, All zonal Railways

No.2020/ TRACK-III/TK/13

10.10.23

lmproved block availability for effective utilization of track machine

Principal Chief Engineer, All zonal Railways

No.2023/Track-III/TK/9

22.09.23

One-man Expert Committee of Shri Anil Kumar Lahoti, Ex-Chairman & CEO, Railway Board to draw a road map for improvement of Track lnspection and Maintenance of lndian Railways.

Principal Chief Engineer, All zonal Railways

No.2O2OlTrack-III/ MC/6 Imple

15.09.23

Identification of routes, base station, Identification and creation of siding facilities and other arrangements for Rail Grinding Machines

Principal Chief Engineer, All zonal Railways

No.2021/Track-III/TK/12 Date 13.09.2023 Correction Slip No.3 to Indian Railway Track Machine Manual (IRTMM-2019).  

NO.2017/TRACK-III/TK/5Pt.II

06.09.23

 Refurbishing of old ICF Coaches to work as Mobile-Stores-

Principal Chief Engineer, All zonal Railways

No.2017/TRACK-III/TK/2

01.09.23

Minutes of Performance Review Meeting through Video Conference with Principal Chief Engineers/All Zonal Railways held on 30.08.2023

Principal Chief Engineer, All zonal Railways

No. 2019/Track-III/CS/1

14.11.23

Installation of RFID Tags on Indian Railway track in conntction with Track

Recording.

The General Managers

All Zonal Railway

2017/track-III/TK/6 Pt.

19.07.2023

Launching of CSM module of TMMS on all Zonal Railways

Principal Chief Engineer,

All Indian Railways

2017/Track-III/TK/13

14.07.2023

Contract for track renewal by TRT machines on complete outsourcing.

Principal Chief Engineer,

All Indian Railways

2020/Track-III/TK/2

13.07.2023

Rolling Block Plan (RBP)

General Managers

All Indian Railways

2020/Track-III/TK/2

05.07.2023

Rolling Block Plan

General Managers

All Indian Railways

2018/Track-III/TK/26

26.06.2023

Identification and creation of siding facilities for working of track machines in the construction of new Railway tracks

Principal Chief Engineer &

CAO/Cs,

All Indian Railways

2017/Track-III/TK/5 Pt. II

26.06.2023

Refurbishing of old ICF coaches to work as Mobile Store-cum-workshop-cum-Rest Van track machines

General Managers

All Indian Railways

2021/Track-III/TK/6

24.06.2023

Reporting of unusual like bursting of blocks, break down of machines & accidents involving track machines

Principal Chief Engineer,

All Indian Railways

2020/Track-III/MC/6 Imple

21.06.2023

Identification of routes, base station, identification and creation of siding facilities and other arrangements for Rail Grinding Machines

Principal Chief Engineer,

All Indian Railways

2017/Track-III/TK/13

19.06.2023

Contract for Deep Screening by contractor’s Ballast Cleaning Machine (BCM) & allied machines and contractor’s manpower

Principal Chief Engineer,

All Indian Railways

2017/Track-III/TK/13

19.06.2023

Contract for track renewal by TRT machines on complete outsourcing

Principal Chief Engineer,

All Indian Railways

2017/Track-III/TK/13

29.05.2023

Long term service contracts of track renewal/ maintenance

General Managers

All Indian Railways

2020/Track-III/TK/2

27.05.2023

Development of application on COA for implementing of Rolling Block Programme

Managing Director,

CRIS, New Delhi

2018/Track-III/TK/26

26.05.2023

Identification and creation of siding facilities for working of heady duty Track Machines

 Principal Chief Engineer,

All Indian Railways

2017/Track-III/TK/13

26.05.2023

Long term service contracts of track renewal/ maintenance

General Managers

All Indian Railways

2020/Track-III/TK/2

25.05.2023

Development of application on COA for implementing of Rolling Block Programme

General Manager,

NWR & ECoR

2010/Track-III/TK/11 Pt. I

18.05.2023

Policy on approval of Specifications for on-track machines, small track machines, monitoring systems, spare parts etc.

Director General,

RDsO

No.2021/Track-III/TK/12 Date 17.05.2023 Correction Slip No.2 to Indian Railway Track Machine Manual (IRTMM-2019).  

2017/Track-III/TK/13

13.05.2023

Contract for Deep Screening by contractor’s Ballast Cleaning Machine (BCM) & allied machines and contractor’s manpower

Principal Chief Engineer,

All Indian Railways

94/Track-III/TK/29 Vol.III

04.05.2023

Supply of Safety shoes, Uniform and protective gears to the staff of Track Machine Organization of Indian Railways.

Chief Engineer/ Track Machines,

All Zonal Railways

2018/Track-III/TK/26

25.04.2023

Identification and creation of siding facilities for working of heavy duty track machines

Principal Chief Engineer,

All Indian Railways

2019/Track-III/TK/16

20.04.2023

Compliance to provisions given in IRPWM for UML peaks detected during Track recording by TRCs

Principal Chief Engineer,

All Indian Railways

2021/Track-III/TK/6

19.04.2023

Safe Working of Track Machines

Principal Chief Engineer,

All Indian Railways

2020/Track-III/TK/6

31.03.2023

Planning & Preparation of Rolling Stock Programme for Track maintenance

PCE & CAO(Construction)

All Zonal Railway

2020/Track-III/MC/6 Imple

29.03.2023

Re construction of Steering Group for implementation of Rail Grinding, Switch Rail Grinding over Indian Railway Network

PCE,

Western Railway

2019/Track-III/TK/6

01.03.2023

Deployment of Track Machines for Construction projects on Indian Railways.

General Managers

All Indian Railways

2021/Track-III/TK/6

01.03.2023

Safe Working of Track Machines

Principal Chief Engineer,

All Indian Railways

2021/Track-III/TK/6

09.02.2023

Tamping of turnouts by Points & Crossing Tamping (PCT) Machines

Principal Chief Engineer,

All Indian Railways

2017/Track-III/Tk/13

28.01.2023

Works contract for Track maintenance & renewal by Track machines

Principal Chief Engineer,

NWR, , WR & NFR

2021/Track-III/TK/14

07.09.2022

Streamlining of Budgeting and Financial Management in Track Machine Organization (TMO) in Indian Railways..

General Managers

All Indian Railways

2020/Track-III/TK/20

20.07.2022

POH of track machines by Railway ZTMDs

Principal Chief Engineer,

All Indian Railways

2010/Track-III/TK-11 Pt. I

20.06.2022

Policy on approval of Technical Specifications

PED/ Infra-I

RDSO

2017/Track-III/TK-6/Pt. II

13.06.2022

Regarding Traffic Block for track machines working

Principal Chief Engineer,

All Indian Railways

2022/Track-II/22/7/1

09.02.2022

Comprehensive review of RDSO’s controlled items

PED/ RDSO

No.2021/Track-III/TK/12 Date 19.08.2021 Correction Slip No.1 to Indian Railway Track Machine Manual (IRTMM-2019).  

2015/Track-III/TK/2

28.01.2021

Accident of gantry working with TRT

Chief Engineer/ Track Machines,

All Zonal Railways

2015/Track-III/TK/2

26.11.2020

Inspection of Wheel & Axle of Track Machines

Chief Engineer/ Track Machines,

All Zonal Railways &

CWM/CPOH,

PRYJ, RYP, VTA, KPA

99/Track-III/MC/6 – Imple Vol. II

15.09.2020

Identification of Routes and Rail Grinding Machine in your Railway `

Principal Chief Engineer,

All Indian Railways

2011/Track-III/TK/4

05.08.2020

Implementation of Complete Mechanization by 2024

Principal Chief Engineer,

All Indian Railways

91/Track-III/TK/2 Vol. IV

04.08.2020

Examination for On line Training on Track Machine conducted by IRTMTC

Chief Engineer/ Track Machines,

All Zonal Railways

2017/Track-III/TK/13

21.07.2020

Outsourcing of Mechanized Deep Screening with Contractor’s own Machines and staff

Principal Chief Engineer,

All Indian Railways

99/Track-III/MC/6 – Imple Vol. II

02.06.2020

Nomination of base station, arrangement of amenities/ facilities and pre- attention work in relation to Rail Grinding Machines (RGM, SRGM, RIV) `

Principal Chief Engineer,

All Indian Railways

91/Track-III/TK/2 Vol. IV

22.05.2020

Promotional and Refresher Courses of Track Machine Staff and Technicians

 

Chief Engineer/ Track Machines,

All Zonal Railways

99/Track-III/MC/6 – Imple Vol. II

21.05.2020

Identification and creation of siding facilities for working of heavy duty RGM under procurement. `

Principal Chief Engineer,

All Indian Railways

2018/Track-III/TK/6

24.09.2019

Conversion factor to compensate the progress of BCM machines using for deep screening with Geogrid laying on the formation

Chief Engineer/ Track Machines,

All Indian Railways

2019/Track-III.TK-13

25.06.2019

Divisionalised system of working of Track Machine Organization

Principal Chief Engineer,

All Indian Railways

2010/Track-III/TK/11 Pt.I

09.05.2019

Policy on approval of Specifications for on Track machines, Small Track Machines, monitoring system etc. and approval of vendor registration – reg.

ED/TM

RDSO

2018/Track-III/TK/26

31.10.2018

Provision for Track Machine Stabling for Track Renewal Works

General Managers

All Indian Railways

2007/Track-III/TK/24/Vol. 3

26.10.2018

Provisions for Track Machine Stabling and Maintenance Sidings

General Managers,

All Indian Railways

2011/Track-III/TK/4

05.09.2018

Deep Screening of loop lines with BCMs

Principal Chief Engineer,

All Indian Railways

2010/Track-III/TK/11/Pt.I

26.06.2018

Policy on approval of Specifications for on-track machines, Small Track Machines, monitoring system etc. and approval of vendor registration – reg

Director General,

RDSO

2017/Track-III/TK/Misc/ Pt.,

27.03.2018

Planning of traffic blocks on Coal Routes - reg

General Managers,

All Indian Railways

2017/Track-III/TK/13

26.12.2017

Outsourcing of mechanized deep-screening of track

Principal Chief Engineer,

WCR

                     ------        ----- Tentative Planning for Procurement of Track Machine in Next 2-3 Years by Indian Railways.           ----
2015/Track-III/TK/15 01.09.2017 Fixed-time (Corridors) Traffic blocks for maintenance of assets. General Managers/All Indian Railways

2015/Track-III/TK/15

31.08.2017

Fixed Time (Corridors) traffic blocks for maintenance of assets

General Managers,

All Indian Railways

2010/Track-III/TK/Policy

24.04.2017

Posting of officers in Track Machines Organization

Principal Chief Engineer,

All Indian Railways

2015/Track-III/TK/5/Pt.I 29.12.2016 Fixed-Time Integrated Corridor Blocks for maintenance of assets. General Managers/All Indian Railways

2011/Track-III/TK/4

12.05.2016

Adoption of width of deep slab for working of Ballast Cleaning Machines (BCMs) through Ballasted deck brides

Chief Engineer/ Track Machines,

NR, WCR, & ED(TMM/ RDSO

2010/Track-III/TK/Policy

29.04.2016

CE/TM Seminar at IRICEN and posting of officers in Track Machines Organization

Principal Chief Engineer,

All Indian Railways

2010/Track-III/TK/Policy

13.04.2016

Posting of officers in Track Machines Organization

Principal Chief Engineer,

All Indian Railways

2011/Track-III/TK/4

01.02.2016

Permission for Manual Deep Screening

Principal Chief Engineer,

All Zonal Railways

2014/Track-III/TK/3

24.11.2015

Machine-wise “Masters” required for calibration of parameters

All Indian Railways

2000/Track-III/TK/18 Vol.II

24.11.2015

Squeezing time of tamping

All Indian Railways

2014/Track-III/TK/5

02.11.2015

Minutes of Meeting of Chief Engineers of Track Machines held on 06.10.2015 in Board

All Indian Railways

2015/Track-III/TK/2

26.10.2015

Safety at work sites – Integrated blocks/Group working of Track Machines

All Indian Railways

2015/Track-III/TK/5

24.09.2015

Group working of Track Machines

Principal Chief Engineer,

All Indian Railways

2015/Track-III/TK/2

18.09.2015

Safe working of Track Machines

All Indian Railways

2014/Track-III/TK/3

14.08.2015

Board’s orders on Track Machines Items  on minutes of CE/TMC’s seminar held at IRICEN Pune on 21st & 22nd August 2014

All Indian Railways, RDSO

2011/Track-III/TK/5

10.08.2015

Instructions on electrically operated final drive/work drive ZF Gear Box

All Indian Railways

2007/Tracvk-III/TK/10 Vol.II

20.07.2015

Maintenance of Logbook of Track Machines

All Indian Railways

2015/Track-III/TK/Misc.

09.07.2015

Innovations on Zonal Railways – May 2015

All Indian Railways

2007/Track-III/TK/21 Vol.II

12.06.2015

Minutes of PCEs conference held in Railway Board on 22.04.2015

All Indian Railways

91/Track-III/TK/41 Vol.5

06.04.2015

Reporting of accidents involving Track Machines

All Indian Railways

2011/Track-III/TK/4

19.01.2015

Section-wise Road/Line-wise nominal periodicity of tamping of Track

All Indian Railways

2004/Track-III/TK/13 Vol.II dt.

14.01.2015

Correction Slip No. 5 to Indian Railways Small Track Machines Manual – July, 2005

All Indian Railways

2007/M (C )/141/1

10.01.2015

Periodical overhauling periodicity of Camp Coaches attached to Track Machines

All Indian Railways

2004/Track-III/TK/13 Vol.II 21.11.2014 Correction Slip No.4 to Indian Railway Small Track Machine Manual-July, 2005. All Indian Railways

2011/Track-III/TK/4

14.11.2014

Nominal periodicity of tamping of track

Principal Chief Engineer,

All Indian Railways

2011/Track-III/TK/4

25.09.2014

Section wise Road/ Linewise nominal periodicity of tamping of tracks

Principal Chief Engineer,

All Indian Railways

No.2008/Track-III/TK/8 Vol.III

25.02.2014

Nomination of Sr. Professor Track-I IRICEN as member of Standing Committee on Small Track Machines due to change of designation.

Chief Track Engineer Central Railway & Sr. Professor Track-I, IRICEN, Pune.

No.2000/Track-III/TK/18 Vol.-II

21.02.2014

Correction Slip No. 17 to Indian Railways Track Machine Manual-2000.

All Concerned

No.2007/Track-III/ TK/10 Vol. II

28.01.2014

Condemnation of old unserviceable track machines.

PCEs/CR, NCR, NER, NR, NWR, SCR, SER, SR

No.2007/Track-III/TK/12 Vol.-III

01.01.2014

Track Recording as per frequency stipulated in IR P.Way Manual.

Director General,RDSO

No.2007/Track-III/ TK/24 Vol. II

21.11.2013

Overhauling of unscheduled Track Machines at CPOH/ALD/NCR & CPOH/RYP/SCR.

All CEs(TMC)/IR

No.2008/Track-III/ TK/8 Vol. III

31.07.2013

Procurement of Light Weight Motorized Trolley for day to day Track Maintenance Operation

Managing Director, IRCON International Ltd., Managing Director RVNL

No.2011/E(LL)2011/HER/7

10.07.2013

Principle of averaging –payment of overtime allowance of Track Machine Staff.

All GMs/IR

No.2001/Track-III/MC/7 Vol.II

20.06.2013

Operation and Maintenance of Mobile Bridge Inspection Units.

PCE/CR, Mumbai, PCE/NR, New Delhi

No. 2007/Track-III/TK/10 Vol. II Pt.

08.04.2013

Track Machines entered as “Stabled for Condemnation” in TMS.

All PCEs/IR

D.O.No.2012/Track-III/ TK/6 Vol. II

08.04.2013

Monitoring; and improving Track Machines effectively worked.

All PCEs/IR

No.2007/Track-III/TK/11 Vol.II Pt.

05.11.2012

Conversion of Coaches into Camping Coaches for Track Machine Staff

GM/WR, Mumbai

2004/Track-III/TK/13 Vol.II 23.10.2012 Correction Slip No.3 to Indian Railway Small Track Machine Manual-July, 2005. All Indian Railways

D.O.No.2010/Track-III/ TK/15

12.07.2012

Creation of post and recruitment of staff for mechanized track maintenance.

All GMs/IR except SECR

No.2011/Track-III/ TK/04

10.07.2012

Obstructions like boulders, rail posts & foundation etc. found in track during deep screening by BCM.

Managing Director, RVNL, All CAOs/Con./IR & All PCEs/IR

2008/Track-III/Tk/8 Vol II

03.07.2012

Use of Off-Track Tampers for spot attention

All PCEs/IR

2004/Track-III/TK/13 Vol.II 13.06.2012 Correction Slip No.2 to Indian Railway Small Track Machine Manual-July, 2005. All Indian Railways
2004/Track-III/TK/13 Vol.II 12.04.2012 Correction Slip No.1 to Indian Railway Small Track Machine Manual-July, 2005. All Indian Railways

No.2007/Track-III/ TK/24 Vol.II

14.03.2012

Provision for track Machine Sidings in Projects for New Lines, Doubling, Gauge Conversion & Yard Remodeling.

All GMs/IR

D.O.No.2011/Track-III/ TK/4

21.02.2012

Mechanization in track renewals and laying of turnouts.

All PCEs/IR

D.O.No.2010/Track-III/ TK/06

09.02.2012

Planning of traffic blocks for maintenance of Infrastructure.

All GMs/IR

D.O.No.2011/Track-III/ TK/08

30.01.2012

Creation of organization and infrastructure for track machines sanctioned under RSP.

All PCEs/IR

No.2007/Track-III/ TK-12/Vol.2

27.01.2012

Improvement  in TGI Values of Agra Division of NCR

All PCEs/IR

No.2008/Track-III/ TK/08 Vol-II

09.01.2012

Small Track Machines under trial.

All PCEs/IR

No. 2007/Track-III/TK/11 Vol. II

02.11.2011

Condition of camping coaches and rest rooms for Track Machine.

All GMs/IR

No.2007/Track-III/ TK/20 Pt.-NFIR-4

23.09.2011

Priority for filling up vacancies of Track Machine staff.

All GMs/IR

No.2010-11/Track-III/ App. Act/01

23.09.2011

Training for Apprentices under the Apprentices Act 1961.

All PCEs/IR

2011/Track-III/TK/8

01.09.2011

Creation of organization and infrastructure for track machine sanctioned under RSP.

All PCEs/IR

D.O.No.2010/Track-III/ TK/06

05.08.2011

Planning of traffic blocks for maintenance of infrastructure.

All GMs/IR

No. 2007/Track-III/TK/24 Vol.II

14.06.2011

Infrastructure for operation and maintenance of track machines.

All GMs/IR

No. 2007/Track-III/TK/24 Vol.II

10.06.2011

Track Machine Sidings

All GMs/IR

No.2011/Track-III/ TK/08

13.05.2011

Allotment of Track Machines sanctioned under RSP.

All PCEs/IR

D.O.No.2011/Track-III/ TK/4

10.03.2011

Mechanization in laying and maintenance of turnouts.

All PCEs/IR

D.O. No.91/Track-III/TK/6 Vol. V

23.02.2011

Mechanization of Track Renewals.

All PCEs/IR

No.91/Track-III/ TK/6 Vol.V

23.02.2011

Mechanization of linking of track.

All CAO( C)s/IR

No.88/Track-III/ 18 Vol.V Pt. I

21.02.2011

Pilot project on implementation of MMU.

PCE/NCR, SECR, SWR

D.O. No. 91/Track-III/TK/6/VOl. V

28.01.2011

Planning and utilization of Shoulder Ballast Cleaning Machines

All PCEs/IR

No.2010/Track-III/ TK/01

17.01.2011

Mechanization of first two rounds of lining, leveling and packing of newly laid track at construction sites.

GM (Cons.), NFR & All CAO(C)/IR

No.96/Track-III/ TK/28

07.12.2010

Proposal for Enhancement of power of PHOD for entering into AMC for repair and maintenance of Track Machines & revision of ceiling for emergency repair of Track Machine.

Chief Engineer(TP), NFR, Maligaon, Guwahati

No.2007/Track-III/ TK/15

06.12.2010

Stipulated block hours for various types of track machines.

All GMs/IR

No.98/Track-III/ TK/5 Pt.

11.11.2010

Undertaking mechanized construction/repair works for private sidings.

All GMs/IR

2010-Track-III/TK/6

11.10.2010

Working of Tie Tamping Machines in Design Mode

All PCEs/IR

No.91/Track-III/ TK/41 Vol.V.Pt.

11.10.2010

Reporting of accidents involving Track Machines.

All PCEs/IR

No.2007/Track-III/ MC/Misc. II

30.07.2010

Warranty issues and release of Performance Guarantee Bond (PBG) under Railway Boards contracts for supply of Track Machines & Capital Spares.

All PCEs/IR

No.2010/CE-I(Spl)/GNS/8

26.05.2010

Surrender of vacancies of Trackmen for creation of post of Track Machine Staff.

All PCEs/IR

No.2007/Track-III/ TK/14

27.04.2010

Progress of implementation of inter zonal transfer of track machines.

All PCEs/IR except ECR, NFR, WR WCR

No. 2009/Track-III/MC/Misc.

19.02.2010

Training of Track Machine Staff at M/s Plasser India Pvt. Ltd, Faridabadagainst supply of new machines.

All PCEs/IR

No.91/Track-III/ TK/6/Vol.V

17.02.2010

Mechanization of Track Maintenance and Renewal.

All PCEs/IR

No.2010/Track-III/ TK/Policy

10.02.2010

Transfer of officers deputed abroad for training under various contracts for procurement of Track Machines.

All PCEs/IR

No.2007/Track-III/ TK/15 pt.

23.12.2009

Assured mega blocks for maintenance of assets in multiple line sections.

All GMs/IR

No.88/Track-III/TK/80

15.10.2009

Exemption from the provisions of railways Act,1989 in respect of the staff operating Track Machines-Three Weeks Roster.

All PCEs/IR

No.98/Track-II/TK/18

17.08.2009

Track-Machines-Measure to improve the utilization

All PCEs/IR

No.RS(POL)/58/0501/2/2008/RGM

20.05.2009

Fueling arrangement for 2 nos of heavy duty Rail Grinding Machine(RGMs) under procurement.

All GMs/IR

No.99/Track-III/MC/6 Imple

12.05.2009

Identification and provision of track machine siding facilities.

All PCEs/CAOs (Con.)/IR

No.99/Track-III/MC/6 Vol.V

08.05.2009

Traffic Block and other operating issues in connection with operation of Rail Grinding Machine on Indian railways.

All GMs/IR

99/Track-III/MC/6 Vol. IV

13.02.2009

Identification and creation of siding facilities for working of heavy duty RGM under procurement.

The Principal Chief Engineer,

SER, ECoR, SR, SCR, SWR

2004/Track-III/TK/19 21.06.2006 Policy on working of Track machine organisation on Zonal Railways  

 




Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 25-07-2025  

Admin Login |  Site Map  |  Contact Us  |  RTI  |  Disclaimer  |  Terms & Conditions  |  Privacy Policy  Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.