2023/S&T/Dev/RDSO.Corres- Part(1) |
22.07.25 |
Designation of RDSO as the Nodal Agency for Standardization and Optimization of Parameters for OEM- Specific braking Algorithms in Kavach System |
2023/S&T/Dev/Kavach Corres |
21.07.25 |
Process of initial survey for Kavach System Design Inputs |
2023/Sig/17/Cable laying |
12.07.25 |
Signal failure due to frequent cable cut/ damages along the track |
2015/Sig/E/Non-Gaz/1/Pt.4 |
25.06.25 |
Provision of Raincoat and Overcoat to Supervisors of S&T Department. |
2020/Sig/21/Safety Performance |
30.05.2025 |
Ensuring Safety of Signalling System |
2012/SIG/M/7/Gen(DAC)/Pt. |
09.05.25 |
Installation of Glued Joint. |
2020/SIG/31/Misc/24/Precautions |
21.03.2025 |
Summer & Monsoon Precautions for Signalling System |
2022/Sig/17-SigEquip/DAC |
11.03.2025 |
Technical System Application Approval (TSAA) of Digital Axle Counter system installations before commissioning |
2023/SIG/17/Cable Laying |
06.03.2025 |
Ensuring timely Meggering of Signalling Cables |
2010/SIG/WG/SP&E
|
28.01.2025
|
Earthing, Bonding, Surge & Lightning Protection System for S&T Installation.
|
2020/SIG/9/1/RDSO/CBRR
|
24.01.2025
|
Provision of Signals on Gantry.
|
2024/S&T/Dev/Maintenance Policy
|
17.01.2025
|
Streamlining of Maintenance activity for assets created under Kavach Project.
|
2018/SIG/7/6-RVNL/1
|
15.01.2025
|
Empowering RVNL for approval of logic & Interface circuits.
|
2023/SIG/A-26/1/A/ECoR
|
09.01.2025
|
Rear collision of Train no. 08504 (VSP-RGDA Passenger) with Train no. 08532 (VSK-PAS Passenger) between Kantakapalli and Alamananda of Waltair Division of East Coard Railway on 23.01.2023
|
2021/SIG/PRIME/1
|
02.01.2025
|
Earthing and Surge protection systems for Signalling Installations.
|