2017/SIG/WP/Misc.
|
31.08.2017
|
Inclusion of proposals for works in PWP 2018-19.
|
2016/SIG/WS.
|
31.08.2017
|
Provision of ERP system for 6 Signal Production Units (SPUs) located at Byculla, Podnur, Mettuguda, Ghaziabad, Gorakhpur and Howrah.
|
2015/Sig/Vision/2030.
|
30.08.2017
|
Information relating to setting of specific goals of signal and Telecommunication to be achieved by 2022.
|
2017/Sig/WP/Double Dist.
|
29.08.2017
|
Provision of second Distant Signal on ‘B’ Route.
|
2017/Sig/WP/RE Works.
|
29.08.2017
|
Replacement / Modification in Signalling to suit RE.
|
2017/Sig/WP/Double Dist.
|
22.08.2017
|
Provision of second Distant Signal on ‘B’ Route.
|
2016/SIG/WP/Works Review/1.
|
21.08.2017
|
Augmentation/Creation of Training facilities for S&T personnel.
|
2004/Sig/W/5/1.
|
18.08.2017
|
Track Circuiting between FM to FM (berthing Portion) on Main Line.
|
2014/Sig/W/5.
|
14.08.2017
|
Minutes of the CWM’s Meeting held on 14th May, 2017.
|
2013/Sig/IRSET.
|
09.08.2017
|
Review of Electronic Interlocking (EI) Application Data Design for achievement uniformity across approval vendors.
|
2015/Sig/Budget/Task Force.
|
03.08.2017
|
Report of the Task force on Safety Reg.
|
2017/Sig/3/Misc/GST.
|
31.07.2017
|
Implementation of introduction of Goods & Service Tax (GST) on the ongoing contracts.
|
2014/Sig/W/5.
|
31.07.2017
|
Minutes of Special Board Meeting held on 11.07.2017.
|
2014/Sig/High Speed.
|
31.07.2017
|
Running of ‘Tajas’ trains on Konkan Railway Routes.
|
2016/SIG/Smart India Hackathan.
|
24.07.2017
|
Problem Statements pertaining to Ministry of Railways for the Smart India Hackathan-2018.
|
2016/Sig/WS.
|
24.07.2017
|
Development of SSDAC system by Signalling Production Unit, Byculla.
|
2010/Sig/SGF/2/Data Logger/1.
|
20/21.07.2017
|
Data Logger Networking.
|
2017/Sig/3/Audit.
|
12.07.2017
|
Audit Profile of Signal Directorate and also of Telecom Directorate.
|
2015/sig/WG/Standardize layout.
|
12.07.2017
|
Standardize of station Yard Layouts and Signalling Documents.
|
2014/Signal/PMO.
|
07.07.2017
|
Inclusion of proposal of TPWS works (ETCS L-I) for Trunk routes in works programme 2018-19.
|
2012/Sig/PRIME/1 |
22.06.2017 |
Information regarding total populations to be done in PRIME Vs completed. |
2007/SIG/Non-Gaz/1/Norm. |
19.06.2017 |
Long duration Signalling Failures in Railways. |
2015/Sig/Air Conditioning |
16.06.2017 |
Provision of Air Conditioning for Signalling installation. |
2016/SIG/Board’s Meeting |
14.06.2017 |
Board’s Safety Review Video Conference with GMs of Zonal Railways and CMD/KRCL. |
2016/Sig/WS |
07.06.2017 |
CSTEs and CWMs / Officers In-charge meeting of Signal Production Units (SPU)/Workshops. |
2017/AM (Sig)/KRCL/1 |
02.06.2017 |
S&T Incidents affecting punctuality of Trains. |
2017/Sig/3/ Genl/1 |
01.06.2017 |
Execution of Engineering Works along the Railway Tracks. |
2010/Si/SGF/12 (Data Logger)/1 |
29/30.05.2017 |
Minutes of meeting Data Logger Networking. |
2010/Si/SGF/12 (Data Logger)/1 |
29/30.05.2017 |
Data Logger Networking. |
2010/SIG/SGF/Point-Machine |
29.05.2017 |
Demand and Scale plan of Point Machine, manufactured by Podanur Workshop, Southern Railway |
2016/Sig/WS |
23.05.2017 |
Establishment of Signalling & Power cables Manufacturing facility at S&T Workshop, Mattuguda. |
2008/Sig/SGF/4/EI/GEN |
19.05.2017 |
Non 0bservation of General and Subsidiary Rules while Undertaking yard remodeling. |
2015/Sig/SF/Monsoon Precautions |
17.05.2017 |
Monsoon Precautions for Signalling Systems. |
2016/SIG/Audit Para 5.14/Short Accountal of Sig. Relays-ECoR |
06.05.2017 |
Action taken note of provisional para 26 (Converted in Audit Para 5.14) of the year 2016 regarding “Short Accountal of Signalling Relays resulting in loss of Rs. 20.68 lakh” |
2013/Sig/TCAS/Status |
12.05.2017 |
Field trial for development of TCAS: E70 & CCB type brake interfaced Locos (WAP-5) at speeds up to 160 KMPH. |
2004/Sig/W/5 |
12.05.2017 |
Complete Track Circuiting in Station Yards. |
2014/Sig/Std.Comm/Rly. |
12.05.2017 |
Standing Committee on finance on Demand for grants 2016-17 recommendations on widening tax base to reach a reasonable tax –GDP ratio. |
2017/Sig/2/Double Distant Aspect. |
05.05.2017 |
Display of Top Yellow in case of blanking of Bottom Yellow (Caution Aspect) for Inner distant signal in double distant signal. |
2017/Sig/NR/1 |
04.05.2017 |
Completion of Indian Railways Book and Annual Reports & Accounts for 2016-17. |
2015/Sig/Air Conditioning |
01.05.2017 |
Provision of Air Conditioning for Signal Installations. |
2013/Sig/Safety/1 (CRS) |
24.04.2017 |
Replacement of old Signal Gears. |
2006/SIG/Roll Diagram |
13.04.2017 |
Inclusion of details of various assets in System Map. |
2014/Sig/PMO |
12.04.2017 |
Workshop on Adaption & Sustainability of Modern Technologies in Railway Signalling-Foucs on Skill Development & make in India. |
2016/Sig./Works Review |
11.04.2017 |
Execution of Works for under Plan head 33. |
2017/Sig/WP/IR/RF/& IDS |
03.04.2017 |
Execution of Works for Trial of Rail fracture & Intrusion detection system on N.C Railway & NF Railway. |
2015/Sig/Vision 2030 |
29.03.2017 |
Safety Plan- Indian Railway’s Short Term and Long Term Safety Plan. |
2012/Sig/PRIME/1 |
14.03.2017 |
Revised Targets for year 2017-18 of Plan for Reliability Improvement and Maintenance Effectiveness (PRIME) annexure in PCDO. |
2014/Sig/SGF/SF/ Summer Precautions |
10.03.2017 |
Summer Precautions. |
2013/SIG/WP/Targets |
28.02.2017 |
Signalling Works sanction and Tentative targets for year 2017-18. |
2012/Sig/Safety Performance/1(Pt) |
13.02.2017 |
Safety in train operation. |
2016/SIG/WP/Work Review/1 |
10.02.2017 |
Review of progress of works and finalization of targets. |
2007/Sig/SGF/Misc/1/Relays |
08.02.2017 |
Replacement of Shelf type Relays with plug-in type Relays. |
2017/Sig/1/Pt.CTT |
06.02.2017 |
Modifications to the Point Operation and Detection Circuits. |
2013/Sig/Specifications |
04.02.2017 |
Provision of Point machine with clamp Lock at Thick web Switches. |
2003/Sig/SEM/3 (Pt) |
02.02.2017 |
Increasing of speed of passenger trains to 200Kmph. |
2017/Sig/2/A/ ECoR |
20.01.2017 |
CRS Recommendations Reg. Rear end collision on 29.09.2016 of Train no. 78408 Bhubneswar- Bhadrak DMU Passenger with Brake Van of Goods train No. E/DKE/BCN at km 410/12-14 between Baranga (BRAG) and Cuttack (CTC) station of East Cost Railway, Bhubaneswar |
2016/Sig/Safety/Perf/Safety Rev.(2-27.10.16) |
05.01.2017 |
Special safety review and Safety audit of Zonal Railways-deficiencies observed during the Audit.
|