Search Documents(Date Wise)   Search | Hindi | Increase Font size Increase Font size Increase Font size|
Indian Railway main logo
भारतीय रेल राष्ट्र की जीवन रेखा...
INDIAN RAILWAYS Lifeline to the Nation...
National Emblem of India
National Emblem of India
About Indian Railways
   Corporate Overview
      Railway Board Directorates
         Signal
            Policy Letters & Circulars
               Yearwise
                  2017


 
2017

Letter No.

Date

Subject

2013/Sig/A/A&R 13.12.2017 Accidents due to negligence of S&T Staff.
2015/SIG/SF/1 04.12.2017 Increase in Signal incidences.

2017/SIG/WP/Misc.

28.11.17

Modernization of Signaling and Telecommunication systems on golden Quadrilateral and Diagonals.

2013/Sig/Specification

14.11.17

Provision of Fire Suppression System

2016/Sig./Drg. Off./1

09.11.17

Approval of Signal and Interlocking Plan (SIP).

2017/CE-I/CT/7/GST

27.10.17

Impact of GST Existing Works Contracts. .

2012/Sig/E Non Gaz/1.

17.10.17

Deputation of SSEs (S&T) along with post from Zonal Railways to RDSO.

2012/Sig/TLBI

16.10.17

Removal of existing Single Line Token Block Instrument over Chhinwawara- Parasia section of Central Railway.

2011/Sig/M/DC-JCM

09.10.17

Non-implementation of norms for non-gazetted categories of signalling Staff (Group ‘C”&’D).

2016/Sig/SIG/WP/WR/1

04.10.17

Reporting of progress of the BPAC works in MCDO

2017/Sig/PCDO/Misc.

12.09.17

MTTR, MTBF & FRPCPY of SSDAC &, MSDAC & HASSDAC.

2012/SIG/M/82nd SSC.

07.09.17

Direct feeding of LED lit Signals in 25KV AC Traction area.

STS/L/SSI/General

10.03.217

Implementation of Recommendations contained in the report to bring “Self-Reliance on Electronic Interlocking (EI) in Indian Railway”.

2008/Sig/SGF/4/EI/GEN/Pt.1

16.08.16

Implementation of Recommendations contained in the report to bring “Self-Reliance on Electronic Interlocking (EI) in Indian Railway”.

 

2017/SIG/WP/Misc.

31.08.2017

Inclusion of proposals for works in PWP 2018-19.

2016/SIG/WS.

31.08.2017

Provision of ERP system for 6 Signal Production Units (SPUs) located at Byculla, Podnur, Mettuguda, Ghaziabad, Gorakhpur and Howrah.

2015/Sig/Vision/2030.

30.08.2017

              Information relating to setting of specific goals of signal and Telecommunication to be achieved by 2022.

2017/Sig/WP/Double Dist.

29.08.2017

Provision of second Distant Signal on ‘B’ Route.

2017/Sig/WP/RE Works.

29.08.2017

Replacement / Modification in Signalling to suit RE.

2017/Sig/WP/Double Dist.

22.08.2017

Provision of second Distant Signal on ‘B’ Route.

2016/SIG/WP/Works Review/1.

21.08.2017

Augmentation/Creation of Training facilities for S&T personnel.

2004/Sig/W/5/1.

18.08.2017

Track Circuiting between FM to FM (berthing Portion) on Main Line.

2014/Sig/W/5.

14.08.2017

Minutes of the CWM’s Meeting held on 14th May, 2017.

2013/Sig/IRSET.

09.08.2017

Review of Electronic Interlocking (EI) Application Data Design for achievement uniformity across approval vendors.

2015/Sig/Budget/Task Force.

03.08.2017

Report of the Task force on Safety Reg.

2017/Sig/3/Misc/GST.

31.07.2017

Implementation of introduction of Goods & Service Tax (GST) on the ongoing contracts.

2014/Sig/W/5.

31.07.2017

Minutes of Special Board Meeting held on 11.07.2017.

2014/Sig/High Speed.

31.07.2017

Running of ‘Tajas’ trains on Konkan Railway Routes.

2016/SIG/Smart India Hackathan.

24.07.2017

Problem Statements pertaining to Ministry of Railways for the Smart India Hackathan-2018.

2016/Sig/WS.

24.07.2017

Development of SSDAC system by Signalling Production Unit, Byculla.

2010/Sig/SGF/2/Data Logger/1.

20/21.07.2017

Data Logger Networking.

2017/Sig/3/Audit.

12.07.2017

Audit Profile of Signal Directorate and also of Telecom Directorate.

2015/sig/WG/Standardize layout.

12.07.2017

Standardize of station Yard Layouts and Signalling Documents.

2014/Signal/PMO.  

07.07.2017

Inclusion of proposal of TPWS works (ETCS L-I) for Trunk routes in works programme 2018-19.

2012/Sig/PRIME/1 22.06.2017 Information regarding total populations to be done in PRIME Vs completed.
2007/SIG/Non-Gaz/1/Norm. 19.06.2017 Long duration Signalling Failures in Railways.
2015/Sig/Air Conditioning 16.06.2017 Provision of Air Conditioning for Signalling installation.
2016/SIG/Board’s Meeting 14.06.2017 Board’s Safety Review Video Conference with GMs of Zonal Railways and CMD/KRCL.
2016/Sig/WS 07.06.2017 CSTEs and CWMs / Officers In-charge meeting of Signal Production Units (SPU)/Workshops.
2017/AM (Sig)/KRCL/1 02.06.2017 S&T Incidents affecting punctuality of Trains.
2017/Sig/3/ Genl/1 01.06.2017 Execution of Engineering Works along the Railway Tracks.
2010/Si/SGF/12 (Data Logger)/1 29/30.05.2017 Minutes of meeting Data Logger Networking.
2010/Si/SGF/12 (Data Logger)/1 29/30.05.2017 Data Logger Networking.
2010/SIG/SGF/Point-Machine 29.05.2017 Demand and Scale plan of Point Machine, manufactured by Podanur Workshop, Southern Railway
2016/Sig/WS 23.05.2017 Establishment of Signalling & Power cables Manufacturing facility at S&T Workshop, Mattuguda.
2008/Sig/SGF/4/EI/GEN 19.05.2017 Non 0bservation of General and Subsidiary Rules while Undertaking yard remodeling.
2015/Sig/SF/Monsoon Precautions 17.05.2017 Monsoon Precautions for Signalling Systems.
2016/SIG/Audit Para 5.14/Short Accountal of Sig. Relays-ECoR 06.05.2017 Action taken note of provisional para 26 (Converted in Audit Para 5.14) of the year 2016 regarding “Short Accountal of Signalling Relays resulting in loss of Rs. 20.68 lakh”
2013/Sig/TCAS/Status 12.05.2017 Field trial for development of TCAS: E70 & CCB type brake interfaced Locos (WAP-5) at speeds up to 160 KMPH.
2004/Sig/W/5 12.05.2017 Complete Track Circuiting in Station Yards.
2014/Sig/Std.Comm/Rly. 12.05.2017 Standing Committee on finance on Demand for grants 2016-17 recommendations on widening tax base to reach a reasonable tax –GDP ratio.
2017/Sig/2/Double Distant Aspect. 05.05.2017 Display of Top Yellow in case of blanking of Bottom Yellow (Caution Aspect) for Inner distant signal in double distant signal.
2017/Sig/NR/1 04.05.2017 Completion of Indian Railways Book and Annual Reports & Accounts for 2016-17.
2015/Sig/Air Conditioning 01.05.2017 Provision of Air Conditioning for Signal Installations.
2013/Sig/Safety/1 (CRS) 24.04.2017 Replacement of old Signal Gears.
2006/SIG/Roll Diagram 13.04.2017 Inclusion of details of various assets in System Map.
2014/Sig/PMO 12.04.2017 Workshop on Adaption & Sustainability of Modern Technologies in Railway Signalling-Foucs on Skill Development & make in India.
2016/Sig./Works Review 11.04.2017 Execution of Works for under Plan head 33.
2017/Sig/WP/IR/RF/& IDS 03.04.2017 Execution of Works for Trial of Rail fracture & Intrusion detection system on N.C Railway & NF Railway.
2015/Sig/Vision 2030 29.03.2017 Safety Plan- Indian Railway’s Short Term and Long Term Safety Plan.
2012/Sig/PRIME/1 14.03.2017 Revised Targets for year 2017-18 of Plan for Reliability Improvement and Maintenance Effectiveness (PRIME) annexure in PCDO.
2014/Sig/SGF/SF/ Summer Precautions 10.03.2017 Summer Precautions.
2013/SIG/WP/Targets 28.02.2017 Signalling Works sanction and Tentative targets for year 2017-18.
2012/Sig/Safety Performance/1(Pt) 13.02.2017 Safety in train operation.
2016/SIG/WP/Work Review/1 10.02.2017 Review of progress of works and finalization of targets.
2007/Sig/SGF/Misc/1/Relays 08.02.2017 Replacement of Shelf type Relays with plug-in type Relays.
2017/Sig/1/Pt.CTT 06.02.2017 Modifications to the Point Operation and Detection Circuits.
2013/Sig/Specifications 04.02.2017 Provision of Point machine with clamp Lock at Thick web Switches.
2003/Sig/SEM/3 (Pt) 02.02.2017 Increasing of speed of passenger trains to 200Kmph.
2017/Sig/2/A/ ECoR 20.01.2017 CRS Recommendations Reg. Rear end collision on 29.09.2016 of Train no. 78408 Bhubneswar- Bhadrak DMU Passenger with Brake Van of Goods train No. E/DKE/BCN at km 410/12-14 between Baranga (BRAG) and Cuttack (CTC) station of East Cost Railway, Bhubaneswar
2016/Sig/Safety/Perf/Safety Rev.(2-27.10.16) 05.01.2017 Special safety review and Safety audit of Zonal Railways-deficiencies observed during the Audit.

 

 

 

 

 




Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 13-03-2023  

Admin Login |  Site Map  |  Contact Us  |  RTI  |  Disclaimer  |  Terms & Conditions  |  Privacy Policy  Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.