Search Documents(Date Wise)   Search | Hindi | Increase Font size Increase Font size Increase Font size|
Indian Railway main logo
भारतीय रेल राष्ट्र की जीवन रेखा...
INDIAN RAILWAYS Lifeline to the Nation...
National Emblem of India
National Emblem of India
About Indian Railways
   Corporate Overview
      Railway Board Directorates
         Signal
            Circulars


 
Circulars

 

2019 and before

2013/Sig/G/2/RDSO

30.12.2019

Agenda Item for Maintenance Study Group Meeting (MSG).

2019/Sig/86th SSC

30.12.2019

Items foe discussion in 86th Signal Standard Committee(SSC).

2014/Sig/TPWS/160KMPH/Loose

26.12.2019

Minutes of meetingheld on 16.12.2019 in Railway Board inconnection with preparation of detailed Estimates for the works of raising of speed up to 160kmph on Delhi-Mumbai and Delhi –Kolkata routes

2019/Sig/17/37/CTC

30.12.2019

Minutes of meeting heldin Railway Board on 19.12.2019 to review performance of centralized Traffic Control (CTC) Systam Tundla.

2015/Sig/E/Non-Gaz/1

30.12.2019

Open House discussions with Field Spervisors, Maintainers and Helpers.

2015/Sig/WG/Standardise Layouts

26.12.2019

Standardisation of Station Yard Layouts and Signalling Documents.

2018/Sig/36-SD/1

18.12.2019

Uploading of SIP & Roll Diagram.

2008/Sig/SGF/4/EI/GEN

19.12.2019

Integrating train operations into Electronic Interlocking (EI).

2017/Sig/WP/RE works

18.12.2019

Approval for use Podanur type TLBI with UFSBI in 25KV RE area on D&E rout in Signal Line section.

2017/Sig Modernization

18.12.2019

Mapping of Aptitude of officers in the area Modern Signaling.

2012/Sig/M/DAC

10.12.2019

Video conference on 13.12.2019 at 15.00 Hrs.

2019/Sig/86th SSC

10.12.2019

Holding of 86th Signaling Standards Committee Meeting.

2017/Sig Modernization

10.12.2019

Pilot Project of Provision ETCS Level-2 on four Sections of Indian Railway.

2015/Sig/WG/Standardize Layouts

09.12.2019

Standardisation of Station Yard Layouts and Signalling Documents.

2019/Sig/17/37/CTC

09.12.2019

Review of performance of centralized Traffic Control (CTC) Tundla.

2018/Sig/18/6/Data logger/1

09.12.2019

Safety Alarm generation by Data logger.

2010/Sig/M/5/81st SSC-1125

04.12.2019

Addendum and Corrigendum Slip No 7 of Indian Railway Signal Engineering Manual PT-II.

2019/Sig/17/36/ETCS L-2

04.12.2019

Inter –Operability of TCAS and ETCS Level-2 ATP System.

2019/AM(Sig)/Insp. Note/2

03.12.2019

Recorded Note of AM(Sig) Railway Board’s inspection of Train Management System, Mumbai Division, Central Railway on 16.11.2019. 

2019/SIG/PCDO/Misc

29.11.2019

Type of Train Detection System.

2019/AM(Sig)/Insp Note/1

29.11.2019

Recorded Note on CBTC with AM (SIG),Railway Board during the discussion held on 16.11.2019 at MRVC.

2017/Sig/Modernization/Signalling

27.11.2019

Pilot Project of Provision of ETCS Level-2 on four Sections Indian Railway.

2018/Sig/36-SD/1

26.11.2019

Standardization of Signalling Drawings.

2012/Sig/PCDO/Misc

26.11.2019

Submission of BPAC position.

2018/Sig/36-SD/1

20.11.2019

Standardization of Typical circuits for Electronic Interlocking.

2018/Sig/36-SD/1

20.11.2019

Standardization of S&T Drawings.            

2017/Sig/Modernization/Signalling

22.11.2019

Points notes during Hon’ble MR’s interaction with Member of Railway Board on 06.11.2019

2016/Sig/P/Misc

19.11.2019

Supply of material pertaining to the Ministry of Railway for the Pre-Budget Economic Survey 2019-20.

2019/Sig/17/36/ETCS L-2

13.11.2019

Interoperability of TCAS and ETCS Level-2 ATP Systems.

2014/Sig/M/83rd SSC

11.11.2019

Block working built into Electronic Interlocking.            

2013Sig/SF/1/NI

11.11.2019

Speed of train during Non- Interlocking working.

2015/Sig/SF/1

07.11.2019

ONE Page Report (OPR)of Signalling and Interlocking Failures.

2008/Sig/SGF/4/EI/GEN/pt-1

04.11.2019

Automation in Signal Drawing-Self Relince in Electronic Interlocking.

2017/Sig/Modernization/Signaling

31.10.2019

Sanction of Signalling project deliberated in 34th GCM.

2016/Sig/DRG.OFFICE/1

31.10.2019

Approval of SIPs for Super Critical and Critical projects

2018/Sig/25/Conf./2

30.10.2019

PCSTEs’conference on 23&24 November 2019 at IRISET Secunderabad

2019/Sig/4/12/Est/2

25.10.2019

Revised Estimatefor the work of Bankura-Vishnupur-Repl.of signaling gears with electronic interlocking of S.E.Railway.(PBitem no SER 388/2019-20)

2012/Sig/PRIME/1

29.10.2019

Plan for Reliability Improvement and Maintennce Effectiveness Targets.

2016/Sig/Winter Precautions/1

28.10.2019

Winter and Fog precautions for Signaling Systems.

2018/Sig/7/6/RVNL/1

28.10.2019

Emprowering RVNL for Approval of Design documents of S&T installation in BZA-GDV-BVRM-NDD-NS-MTM Doubling,UR-MBNR and MMTS phase ii Dubling Project on South Central Railway.

2014/Sig/TPWS/160 KMPH/Loose

28.10.2019

Signalling Telecommunicotion works in connection with raising of speed to160 KMPH in Delhi Mumbai and Delhi-Kolkata Sections preparation of Detailed Estimate.

2019/Sig/17/37/CTC

25.10.2019

Review of performance of Ceentralized Traffic Control (CTC) Tundla in Board Meeting held on 03.10.2019

2017/Sig/Modernization Signalling

24.10.2019

Organizing Technical Workshop on Automatic Train Protection (ATP) System withspecial focus on ETCS Level-2.

2011/Sig/WP/15/2Pt

22.10.2019

Train Management System (TMS) Centralized Traffic Control (CTC) Operation &maintenance responsibility.

2019/Sig/26-A/ECoR/03

16.10.2019

Head on collisinn of Train No-18005 of (Howrah-Jagdalpur Samalleswarri Exp.) with 8-W OHE Tower Wagon on ECoR 190001 (Make ICF) at Km 160/9-10between Singapur Road A Cabin (SPRO)Keutguda (KTGA) station of Waltair Division of East Coast Railway at about 16.38 hours on 25.06.19.

2019/Sig/25-Conf./VC/PCSTE/2

16.10.2019

Carrying out a detailed inventory accountal of relays both in Open Line and Construction Units.

2015/Sig/SF/Punctuality

11.10.2019

Reliability Improvement Measures

2018/Sig/17/36/Modernisation

10.10.2019

Execution of works of  trials of Modern Train Control System approved and sanctioned in Supplementary WP 2018-19

2014/Sig/TPWS/160KMPH/Loose

09.10.2019

Signalling and Telecommunication works in connecation with raising of speed to 160 KMPH in Delhi- Mumbai and Delhi –Kolkata Section preparation of Detailed Estimates

2019/Sig/SGF/18/6/2/Data Logger (COA)

03.10.2019

Synchronization of timings of Data Logger (COA)

2016/Sig/Board Meeting

03.10.2019

Strategy action plan forachieving operation ratio of 95%90% in 2019-20

 

2012/Sig/WP/Misc/SOR 06.4.2015 Schedule of Rates (SOR) for S&T items.
2013/Sig/TPWS 17.03.2015 Execution of Sanction TPWS works on Indian Railways
2014/Sig/Auto Signaling/loose 01.12.2014 Raising up of train speed to160 kmph in select corridors.
2013/Infra/12/43 05.09.2014 Increase of speed of passenger trains to 160 kmph.
2013/Sig/SEM Pt-II/Misc. 12.06.2014 Irregularities in the works of trenching, Laing if of cables-System improvement.
2013/Sig/Safety Performance/01 03.6.2014 Safe operation of Trolleys and lorries.
2013/Sig/WP/MISC 08.7.2013 Signaling Estimate sent to Board for sanction.
2012/Sig/Safety performance/1 26.6.2013 Adoption of short cut method by signaling staff for taking “off” Signals.
2012/sig/SEM-II/Misc 13.6.2013 Shifting of Starter signal to the boundary of track circuit ahead to mitigate the risk.
STS/E/Gen/Cross Approval/Vol.1 29.4.2013 Modifications in cross approval policy.
2012/SIG/SGF/pt. 11.6.2013 Indigenizations of M/s Thales make AZLM MSDAC.
2211/SIG/WP/LC/IR/1 20.2.2013 Provision of safety Devices at Level Crossing Gates-Comprehensive Policy.
2012/Sig/Metro Rays/TA/MOR 12.12.2012 Formation of panel of approved Independent Safety Assessors (ISAs)
2011/Proj/MOU/31/1 16.11.2012 Certification of Metro Railways.
2000/Safety(A&R)/19/36 02.11.2012 Review of Station working Rules.
2012/Elect(G)/114/1 13.7.2012 Provision of Air Conditioning equipment of signaling installation.
2012/Sig/ATSS 03.5.2012 Technical System Application Approval of Advanced Technology Signaling Systems.
2012/Sig/SF/2(Policy) 09.4.2012 Non –Interlocking (NI) Working-Commissioning of RRIs at major junction Station.
2011/SIG/SF/1/Pt 23.2.2012 Burning of S&T Cables due to Fire-Preventive Measures
2011/Sig/SF/1 19.8.2011 Immediate Action Plan for Preventing Signal Indications Due to Lightning Effect.
STS/E/AC/Digital/Genl 27.7.2011 Standardization of systems-Block Proving by Axle Counter.
2009/safety(A&R)/19/24 27.7.2011 Indication and Aspect of Distant Signals-Gazette Notification dated 10.11.2010 amending GR 3.07-Clerification thereto.
2008/SIG/SGF/4/EI/Genl 5/8.7.2011 Policy on type of interlocking to be adopted at stations provided with centralized operation of points & Signals-Revision of estimate from Relay interlocking (PI) to Electronic Interlocking (EI).
2011/Coaching/7/1 23.6.2011 Detention of train due to movement of VIPs etc.
2010/Sig/SGF/EI(Ansaldo) 22.6.2011 Directive for System Improvement of Electronic Interlocking-Microlok-II
S&T/PL/1600/Pt. XI/2005 13/14.06.2011 Estimates for replacement of interlocking.
2000E(CG)13-15(S&T)(45) 19.5.2011 Yardsticks for creation of revenue charged gazette post for S&T Department on Indian Railways.
2011/LML/18/17. 30.3.2011 Long term leasing of Railways land-regarding Cabinet approval
2006/SIG/KFW/Rev./Loose2 22.2.2011 Modification of Signaling & Telecom System on CNB-GZB section.
20011/SIG/KFW/Rev./Part 24.1.2011 Modification of Signaling & Telecom System on CNB-GZB section.
2010/Sig/E/Non-GAZ/1 21.1.2011 Competency based training for promote JE/Signal under ranker’s quota 40%.
AB,14017/64/2008-Estt.(RR) 14.1.2011 Non-Functional up gradation for Officers of Organized group ’A’ Services in PB-3 and PB-4.

2010/SIG/LX/2

01.10.2010

Provision of safety devices at Level Crossing.

2002/Sig/A/Misc. 25.9.2009 Safety performance Signal Lighting & back- up Power Supply.
2008/Sig/G/5 15.01.2009 Battery life enhancement measures.

STS/E/AC/ABS

27.6.2008

Guidelines for Automatic Signaling using Multi Section Digital Axle Counter.

2005/RE/250/1 17.11.2006 Back- up Power Supply from Auxiliary transformer
2005/RE/250/1 17.11.2006 Back- up Power Supply for UTS from Diesel Generator (DG) Set in Non- RE sections.

2000/Sig/LX/2

07.4.2006

Electrical Operation of Lifting Barriers.

2005/Safety(A&R)/19/7

01.7.2005

Amendment in the order of performance of the means of communication for obtaining/granting line clear for train operation under Absolute Block System.

2005/SIG/G/8

24.5.2005

Working of Tokenless Block Instrument on Single line.

2005/Sig/LX/2

16.2.2005

Execution of sanctioned works of Continuous Track Circuiting with Automatic Block Signaling.

2000/SIG/LX/1/Pt.III

04.2.2005

Extended Field Trail of Train Actuated Warning Device (TAWD)

2005/SIG/WP/BPAC 03.2.2005 Block Proving by Axle Counter.

W.191/M/65/CN/W/GPD-GDR/AUTO

02.2.2005

Execution of sanctioned works of Continuous Track Circuiting in the Block section in Gummidipondi (GPD-Gudur (GDR) Section.

2004/Sig/G/7 16.12.2004 Joint Procedure order for undertaking digging work in the vicinity of underground signaling, Electrical and telecommunication cables.

2000/Safety(A&R)19/39

04.11.2003

Working instructions for manned Level Crossings.

96/SIG/G/PLN/4 06.10.2003 Provision of Block Proving by Axle Counter.

2000/SIG/LX/2

23.7.2003

Electrical Operation of Lifting Barriers.

2003/CE-1/LX/59

11.6.2003

Manning of unmanned Level Crossings.

2000/Sig/LX/2/Pt

05.5.2003

Safety Device at Level Crossing Gates.

STS/E/AC/Digital/CEL 30.4.2003 Use of Digital Axle Counter for Block Proving on single line with existing block instrument
82/RE/250/1 VOL/II 21/26.11.2002 Power Supply arrangements for signaling and Telecommunication Installation in 25 KV AC Area.

2001/CE-

1/LX/AC/01(Data)

25.9.2002

Classification of manned Level Crossing gates.

82/RE/250/1 13.9.2002 Power Supply arrangements for signaling and Telecommunication Installation in 25 KV AC Area.
SRS/E/PS/General 04.3.2002 Cable sizes between Auxiliary Transformer and Distribution panel

99/CE-I/LX/80

28/31.01.2000

Master Correction slip No 18/2/5 Corrigendum/Addendum Level Crossing/Bridge and ROBs/RUBs.

98/Sig/LX/2.

13/18.11.1998

Safety measure at Level Crossings.

96/CE-1/LX/AC/6

31.5.1996

Location of Level Crossings Within Station Limits.

83/W1/LX/16.

26.2.1983

Working at Level Crossings.

77/W3/SG/LX/2

1.11.1980

Safety Device at Level Crossings.test123

 

 




Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 23-05-2021  

 Site Map  |  Contact Us  |  RTI  |  Disclaimer  |  Terms & Conditions  |  Privacy Policy  Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.