Letter No
|
Date
|
Subject
|
2010SIG/SGF/12(Data
Logger)
|
23.12.2010
|
Placement of Data Loggers.
|
2009/CE-1/LX/116
|
21.12.2010
|
Manning and Interlocking of unmanned Level Crossing gates in Automatic Territory.
|
2010/Sig/Semi-Automatic
|
14/16.12.2010
|
Converting one Automatic Signal between two stations to Semi Automatic Signal in Automatic Block Signaling (ABS) territory for enhancing Level of Safety during Fog and other exigencies.
|
98/Safety(A&R)/19/16
|
14.12.2010
|
Train operation during Fog Precautions-Clarification.
|
2009/Tele/1/Misc.
|
08.12.2010
|
Trail of OFC based Intrusion detection system.
|
2010/Sig/A/WCR(20.09.2010)
|
07.12.2010
|
Up gradation of station to standard II (R) interlocking from Standard- I (R) interlocking.
|
2009/Safety& Signal/26/2
|
26.11.2010
|
Generation of exception report regarding reversal of Points.
|
2010/Sig/Sem/8/Pt.
|
18.11.2010
|
Improvement on Maintenance Practices-Annual Maintenance Contract (AMC) with Original Equipment Manufacturer for S&T equipment.
|
2005/Sig./TPWS/1(DLI-AGC)/Vol.II
|
12.10.2010
|
TPWS projects on Railways.
|
2010/Sig/OBTPS
|
27.09.2010
|
On Board Train Protection System.
|
2010/SIG/A/WCR(1)
|
23.09.2010
|
Averted Collision at Thalera on WC Rly.on11.09.2010-Electromachenicail Interlocking-Signal/Point fault.
|
2010/SIG/SEM/8/Pt.
|
15.09.2010
|
Improvement in Maintenance Practices.
|
E(P&A)I-2010/RT-2
|
11.09.2010
|
Safety Related Retirement Scheme covering safety categories with Grade Pay of Rs.1800/-.
|
2008/RE/161/15 (S&T)
|
23/26.08.2010
|
Provision of Panel Interlocking.
|
98/Safety(A&R)/19/16
|
23.08.2010
|
Train operation during Fog- Precautions.
|
2010/Sig/Semi-Automatic.
|
18.08.2010
|
Converting one Automatic Signal between two stations to Semi Automatic Signal in Automatic Block Signaling (ABS) territory for enhancing Level of Safety during Fog & other exigencies.
|
2007/Sig/Non Gaz/1/Norms
|
16.08.2010
|
Norms/Yardsticks for non-gazetted categories of Signaling staff (Group C&D).
|
2009/Safety/(A&R)/26/4
|
11.08.2010
|
Blanking of Signals-Back up Power Suppl.
|
2001/LC/Misc.11
|
03.08.2010
|
Conduct of cases before the CAT/Courts in which the Chairman/Secretary, Railway Board has been impleaded as one of the respondents-Instructions to be followed in such cases.
|
2002/SIG/A/Misc/Accident.
|
28.07.2010
|
Unusual Incidence on North Central Railway on 27th July, 2010.
|
2003/Tele/TP/1
|
27/28.07.2010
|
Use of Quad Cable for Telecom & Signaling applications.
|
2010/Sig./SGF/12(Data Logger)
|
22.07.2010
|
Data Loggers for Signaling-Timely extraction of Report.
|
2008/Sig/SGF/4/EI/GEN
|
22.07.2010
|
Microlock-II Approval of version CC3.0.
|
2008/Sig/Estimate/Gen
|
03.06.2010
|
Preparation of Abstract Estimates.
|
2007/SIG/PROCURMENT.
|
15.02.2010
|
Procurement of IPS through Supply Contract.
|