Search Documents(Date Wise)   Search | Hindi | Increase Font size Increase Font size Increase Font size|
Indian Railway main logo
भारतीय रेल राष्ट्र की जीवन रेखा...
INDIAN RAILWAYS Lifeline to the Nation...
National Emblem of India
National Emblem of India
About Indian Railways
   Corporate Overview
      Railway Board Directorates
         Signal
            Policy Letters & Circulars
               Yearwise
                  2010


 
2010

              Letter No

Date

Subject

2010SIG/SGF/12(Data

Logger)

23.12.2010

Placement of Data Loggers.

2009/CE-1/LX/116

21.12.2010

Manning and Interlocking of unmanned Level Crossing gates in Automatic Territory.

2010/Sig/Semi-Automatic

14/16.12.2010

Converting one Automatic Signal between two stations to Semi Automatic Signal in Automatic Block Signaling (ABS) territory for enhancing Level of Safety during Fog and other exigencies.

98/Safety(A&R)/19/16

14.12.2010

Train operation during Fog Precautions-Clarification.

2009/Tele/1/Misc.

08.12.2010

Trail of OFC based Intrusion detection system.

2010/Sig/A/WCR(20.09.2010)

07.12.2010

Up gradation of station to standard II (R) interlocking from Standard- I (R) interlocking.

2009/Safety& Signal/26/2

26.11.2010

Generation of exception report regarding reversal of Points.

2010/Sig/Sem/8/Pt.

18.11.2010

Improvement on Maintenance Practices-Annual Maintenance Contract (AMC) with Original Equipment Manufacturer for S&T equipment.

2005/Sig./TPWS/1(DLI-AGC)/Vol.II

12.10.2010

TPWS projects on Railways.

2010/Sig/OBTPS

27.09.2010

On Board Train Protection System.

2010/SIG/A/WCR(1)

23.09.2010

Averted Collision at Thalera on WC Rly.on11.09.2010-Electromachenicail Interlocking-Signal/Point fault.

2010/SIG/SEM/8/Pt.

15.09.2010

Improvement in Maintenance Practices.

E(P&A)I-2010/RT-2

11.09.2010

Safety Related Retirement Scheme covering safety categories with Grade Pay of Rs.1800/-.

2008/RE/161/15 (S&T)

23/26.08.2010

Provision of Panel Interlocking.

98/Safety(A&R)/19/16

23.08.2010

Train operation during Fog- Precautions.

2010/Sig/Semi-Automatic.

18.08.2010

Converting one Automatic Signal between two stations to Semi Automatic Signal in Automatic Block Signaling (ABS) territory for enhancing Level of Safety during Fog & other exigencies.

2007/Sig/Non Gaz/1/Norms

16.08.2010

Norms/Yardsticks for non-gazetted categories of Signaling staff (Group C&D).

2009/Safety/(A&R)/26/4

11.08.2010

Blanking of Signals-Back up Power Suppl.

2001/LC/Misc.11

03.08.2010

Conduct of cases before the CAT/Courts in which the Chairman/Secretary, Railway Board has been impleaded as one of the respondents-Instructions to be followed in such cases.

2002/SIG/A/Misc/Accident.

28.07.2010

Unusual Incidence on North Central Railway on 27th July, 2010.

2003/Tele/TP/1

27/28.07.2010

Use of Quad Cable for Telecom & Signaling applications.

2010/Sig./SGF/12(Data Logger)

22.07.2010

Data Loggers for Signaling-Timely extraction of Report.

2008/Sig/SGF/4/EI/GEN

22.07.2010

Microlock-II Approval of version CC3.0.

2008/Sig/Estimate/Gen

03.06.2010

Preparation of Abstract Estimates. 

2007/SIG/PROCURMENT.

15.02.2010

Procurement of IPS through Supply Contract.

 




Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 13-03-2023  

Admin Login |  Site Map  |  Contact Us  |  RTI  |  Disclaimer  |  Terms & Conditions  |  Privacy Policy  Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.