Letter No
|
Date
|
Subject
|
2004/SIG/G/7
|
13.12.2005
|
Extension of Engineering works along the railway Track.
|
2005/SIG/SF/2
|
30.11.2005
|
Adoption of Direct Maintenance for reduction in Signal Failures.
|
92/Sig/SGF/5-Pt.
|
22.11.2005
|
Continuous Track Circuiting using Audio Frequency Track Circuiting (AFTC) in electrified area.
|
2005/SIG/SEM/5 |
18.11.2005 |
Procedure Order for Handing Over/Taking Over of Newly Created Signalling Assets. |
2005/Sig/PLG/3/Pt.
|
02.11..2005
|
Policy for Adoption of various signaling technologies on BG Network of Indian Railways.
|
2005/Sig/SGF/4/EI
|
14.10.2005
|
Induction of new technologies for Electronic Interlocking.
|
2005/SIG/SEM/8
|
04.10.2005
|
Improvement in Maintenance Practices.
|
2005/SIG/CA-III/26
|
18.08.2005
|
Procurement of IPS through supply contract.
|
2005/SIG/SGF/12/Data-Logger
|
25.06.2005
|
The mater pertaining to provision of Data Loggers.
|
2005/Sig/SGF/4/EI
|
01.06.2005
|
Improvement in Electronic Interlocking (SSI) Equipment- Micro Lock-II.
|
2004/CE-II/ CS/I
|
17.05.2005
|
Advance Correction Slip No 98 to the Indian Railways Permanent Way Manual-1986
|
2005/W-I/RVNL/5
|
12.05.2005
|
Timely and smooth execution of RVNL project.
|
94/E&R/1700/9(Pt.)
|
27.04.2005
|
Norms for non-gazette Categories of signaling staff.
|
92/Sig/SGE/5-Pt.
|
20.04.2005
|
Continuous Track Circuiting using Audio Frequency Track Circuiting (AFTC) in electrified sections.
|
2005/Sig/LX/2
|
16.02.2005
|
Execution of sanctioned works of Continuous track Circuiting with automatic Block Signaling.
|