Search Documents(Date Wise)   Search | Hindi | Increase Font size Increase Font size Increase Font size|
Indian Railway main logo
भारतीय रेल राष्ट्र की जीवन रेखा...
INDIAN RAILWAYS Lifeline to the Nation...
National Emblem of India
National Emblem of India
About Indian Railways
   Corporate Overview
      Railway Board Directorates
         Signal
            Policy Letters & Circulars
               Yearwise
                  2015


 
2015

 

Letter No

Date

Subject

2015/Sig/SEM Pt.I/Para 7.131.

13.01.2015

Increasing the speed of Passenger Train consisting of 13nos. BG high capacity AC EOG Double Decker Chair Car Coaches (Width 3050 mm) fitted with pneumatic suspension at the secondary stage on fiat bogies and 2 Nos. of BG LHB Generator Van hauled by signal WDP4B/WAP 5/WAP 4 class of Locomotive on Mumbai Central – Ahemdabad - Mumbai Central section of Western Railway from existing maximum 120 Kmph to130 Kmph (increase from 120Kmph to 130 Kmphn VR-BRC and 110 Kmph to 130 Kmph on BRC-ADI Section) on track maintained to C&M Vol.I standard.

2001/Sig/SGF/12(LED)Pt.

21.01.2015

Failure of Route Signal leading to unusual situation.

2012/Sig/E Non Gaz/1

09.03.2015

Safety of Personnel during maintenance and /or construction work.

2013/Sig/TPWS

17.03.2015

Execution of sanctioned TPWS works on Indian Railways.

2015/Train Punctuality/MR,s Action Plan

01.04.2015

Punctuality and asset failure.

2011/ Sig/EI/Policy

15.04.2015

Incorporation of condition or MoU with OEMs (RDSO approved sources) in technical eligibility criteria in tender award of  works contract for Electronic Interlocking (EI)

2014/Sig/SF/Summer Precautions

15.04.2015

Summer and Pre Monsoon precautions.

2013/Sig/Vig/01(Part)

16.04.2015

System improvement regarding inspe   ction of supply material by consignee.

2014/Sig/SF/Summer Precautions

18.05.2015

 Monsoon precautions for signaling system.

2015/Sig/safety Performance/01

10.06.2015

Safety Drive for safe working of Block Instruments and Lever Locks..

2014/Sig/FDI

18.06.2015

Sectoral guidelines for Domestic/Foreign Direct Investment in Railways.

2013/Sig/Specifications

22.06.2015

Automatic Fire Detection and Suppression System.

2013/Sig/TPWS.

22.06.2015

Provision of Train Protection & Warning System (TPWS) based on ETCL-1 Technology.

2015/Sig/E Non Gaz/1

30.06.2015

Weekly Rest to Signal Staff.

2008/Sig/SGF/4/EI

26/30.6.15

Failure of EI at Purna due to lightning.

2015/Sig/Roll Diagram

03.07.2015

Details of Signalling as on 30.06.2014-Roll Diagrams & System Maps with proper indexing.

2015/Sig/IRSSE

15.07.2015

Proforma for bio data of S&T Officers in Zonal Railways.

2012/Sig/ATSS

02.09.2015

Technical System Application Application approval of Advanced Technology Signaling Systems.

2015/Sig/A/Fire/Pt.

09.09.2015

Safety drive -Fire Detection and Suppression System.

2008/Sig/G/4

17.09.2015

Regarding Locking of Advanced Starter Signal and Starter Signal.

2015/Sig/PLN/Blue Print

21.09.2015

Policy for Adoption of various signaling technologies on BG Network of Indian Railways

2015/Sig/84th SSC Meeting

05.11.2015

84th Signal Standards Committee Meeting.

2012/Sig/ATSS

26.11.2015

Signalling Installations at Major Junction Stations (> 100 routes).


 

Letter No

Date

Subject

2015/Sig/SEM Pt.I/Para 7.131.

13.01.2015

Increasing the speed of Passenger Train consisting of 13nos. BG high capacity AC EOG Double Decker Chair Car Coaches (Width 3050 mm) fitted with pneumatic suspension at the secondary stage on fiat bogies and 2 Nos. of BG LHB Generator Van hauled by signal WDP4B/WAP 5/WAP 4 class of Locomotive on Mumbai Central – Ahemdabad - Mumbai Central section of Western Railway from existing maximum 120 Kmph to130 Kmph (increase from 120Kmph to 130 Kmphn VR-BRC and 110 Kmph to 130 Kmph on BRC-ADI Section) on track maintained to C&M Vol.I standard.

2001/Sig/SGF/12(LED)Pt.

21.01.2015

Failure of Route Signal leading to unusual situation.

2012/Sig/E Non Gaz/1

09.03.2015

Safety of Personnel during maintenance and /or construction work.

2013/Sig/TPWS

17.03.2015

Execution of sanctioned TPWS works on Indian Railways.

2015/Train Punctuality/MR,s Action Plan

01.04.2015

Punctuality and asset failure.

2011/ Sig/EI/Policy

15.04.2015

Incorporation of condition or MoU with OEMs (RDSO approved sources) in technical eligibility criteria in tender award of  works contract for Electronic Interlocking (EI)

2014/Sig/SF/Summer Precautions

15.04.2015

Summer and Pre Monsoon precautions.

2013/Sig/Vig/01(Part)

16.04.2015

System improvement regarding inspe   ction of supply material by consignee.

2014/Sig/SF/Summer Precautions

18.05.2015

 Monsoon precautions for signaling system.

2015/Sig/safety Performance/01

10.06.2015

Safety Drive for safe working of Block Instruments and Lever Locks..

2014/Sig/FDI

18.06.2015

Sectoral guidelines for Domestic/Foreign Direct Investment in Railways.

2013/Sig/Specifications

22.06.2015

Automatic Fire Detection and Suppression System.

2013/Sig/TPWS.

22.06.2015

Provision of Train Protection & Warning System (TPWS) based on ETCL-1 Technology.

2015/Sig/E Non Gaz/1

30.06.2015

Weekly Rest to Signal Staff.

2008/Sig/SGF/4/EI

26/30.6.15

Failure of EI at Purna due to lightning.

2015/Sig/Roll Diagram

03.07.2015

Details of Signalling as on 30.06.2014-Roll Diagrams & System Maps with proper indexing.

2015/Sig/IRSSE

15.07.2015

Proforma for bio data of S&T Officers in Zonal Railways.

2012/Sig/ATSS

02.09.2015

Technical System Application Application approval of Advanced Technology Signaling Systems.

2015/Sig/A/Fire/Pt.

09.09.2015

Safety drive -Fire Detection and Suppression System.

2008/Sig/G/4

17.09.2015

Regarding Locking of Advanced Starter Signal and Starter Signal.

2015/Sig/PLN/Blue Print

21.09.2015

Policy for Adoption of various signaling technologies on BG Network of Indian Railways

2015/Sig/84th SSC Meeting

05.11.2015

84th Signal Standards Committee Meeting.

2012/Sig/ATSS

26.11.2015

Signalling Installations at Major Junction Stations (> 100 routes).

30.11.2015 <span lang="EN-US" style="font-size:10.0pt;line-height: 115%;font-family:" verdana","sans-serif";mso-fareast-font-family:"times="" new="" roman";="" mso-fareast-theme-font:minor-fareast;mso-bidi-font-family:"times="" mso-ansi-language:en-us;mso-fareast-language:en-us;mso-bidi-language:hi"="">Policy for Adoption of various signaling technologies on BG Network of Indian Railways.

 




Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 13-03-2023  

Admin Login |  Site Map  |  Contact Us  |  RTI  |  Disclaimer  |  Terms & Conditions  |  Privacy Policy  Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.