Letter No
|
Date
|
Subject
|
2015/Sig/SEM Pt.I/Para 7.131.
|
13.01.2015
|
Increasing the speed of Passenger Train consisting of 13nos. BG high capacity AC EOG Double Decker Chair Car Coaches (Width 3050 mm) fitted with pneumatic suspension at the secondary stage on fiat bogies and 2 Nos. of BG LHB Generator Van hauled by signal WDP4B/WAP 5/WAP 4 class of Locomotive on Mumbai Central – Ahemdabad - Mumbai Central section of Western Railway from existing maximum 120 Kmph to130 Kmph (increase from 120Kmph to 130 Kmphn VR-BRC and 110 Kmph to 130 Kmph on BRC-ADI Section) on track maintained to C&M Vol.I standard.
|
2001/Sig/SGF/12(LED)Pt.
|
21.01.2015
|
Failure of Route Signal leading to unusual situation.
|
2012/Sig/E Non Gaz/1
|
09.03.2015
|
Safety of Personnel during maintenance and /or construction work.
|
2013/Sig/TPWS
|
17.03.2015
|
Execution of sanctioned TPWS works on Indian Railways.
|
2015/Train Punctuality/MR,s Action Plan
|
01.04.2015
|
Punctuality and asset failure.
|
2011/ Sig/EI/Policy
|
15.04.2015
|
Incorporation of condition or MoU with OEMs (RDSO approved sources) in technical eligibility criteria in tender award of works contract for Electronic Interlocking (EI)
|
2014/Sig/SF/Summer Precautions
|
15.04.2015
|
Summer and Pre Monsoon precautions.
|
2013/Sig/Vig/01(Part)
|
16.04.2015
|
System improvement regarding inspe ction of supply material by consignee.
|
2014/Sig/SF/Summer Precautions
|
18.05.2015
|
Monsoon precautions for signaling system.
|
2015/Sig/safety Performance/01
|
10.06.2015
|
Safety Drive for safe working of Block Instruments and Lever Locks..
|
2014/Sig/FDI
|
18.06.2015
|
Sectoral guidelines for Domestic/Foreign Direct Investment in Railways.
|
2013/Sig/Specifications
|
22.06.2015
|
Automatic Fire Detection and Suppression System.
|
2013/Sig/TPWS.
|
22.06.2015
|
Provision of Train Protection & Warning System (TPWS) based on ETCL-1 Technology.
|
2015/Sig/E Non Gaz/1
|
30.06.2015
|
Weekly Rest to Signal Staff.
|
2008/Sig/SGF/4/EI
|
26/30.6.15
|
Failure of EI at Purna due to lightning.
|
2015/Sig/Roll Diagram
|
03.07.2015
|
Details of Signalling as on 30.06.2014-Roll Diagrams & System Maps with proper indexing.
|
2015/Sig/IRSSE
|
15.07.2015
|
Proforma for bio data of S&T Officers in Zonal Railways.
|
2012/Sig/ATSS
|
02.09.2015
|
Technical System Application Application approval of Advanced Technology Signaling Systems.
|
2015/Sig/A/Fire/Pt.
|
09.09.2015
|
Safety drive -Fire Detection and Suppression System.
|
2008/Sig/G/4
|
17.09.2015
|
Regarding Locking of Advanced Starter Signal and Starter Signal.
|
2015/Sig/PLN/Blue Print
|
21.09.2015
|
Policy for Adoption of various signaling technologies on BG Network of Indian Railways
|
2015/Sig/84th SSC Meeting
|
05.11.2015
|
84th Signal Standards Committee Meeting.
|
2012/Sig/ATSS
|
26.11.2015
|
Signalling Installations at Major Junction Stations (> 100 routes).
|