File No.
|
Date
|
Subject
|
2009/CE-I/LX/17/Policy
|
24.12.2010
|
Special Allowance to Gatekeepers of Civil Engineering Level Crossings identified as difficult gates.
|
2010/CE-I/Estt./BRO
|
22.12.2010
|
Preparation of Abstract and Detailed /Revised Estimates of ROBs.
|
E(P&A)-2009/SP-1/CE-1
|
20.12.2010
|
Special Allowance to Gatekeepers of Civil Engineering Level Crossings identified as difficult gates
|
2008/CE-I/LX/Target 2010-11
|
09.12.2010
|
Creation of infrastructure for manning of unmanned level crossing v/s filling of vacancy of gateman
|
98/CE-I/Misc/(14)/BRO
|
01.11.2010
|
Charges applicable in case of construction of ROB/RUB fully funded by sponsoring agencies
|
2010/CE-I/Estt./12/BRO
|
22.10.2010
|
Check-List for Detailed / Revised Estimate requiring Board's Sanction.
|
2006/CE-I/LX/WP
|
08.10.2010
|
Initiative to improve Safety at Level Crossings
|
2010/CE-I/MMD
|
08.10.2010
|
MMD(Maximum Moving Dimensions) to be followed on feeder routes to Dedicated Freight Corridors (DFC).
|
2009/CE-I/BRO/50
|
10.2010
|
Construction of ROBs/RUBs - Execution by Single entity
|
2007/CE-I/BRO/3 (NREGA)
|
29.09.2010
|
Construction of Road Under Bridges through funds provided under National 55Rural Employemnt Guarantee Act/Scheme (NREGA/NREGS).
|
2007/CE-I/BRO/3 (NREGA)
|
15.09.2010
|
Construction of Road Under Bridges through funds provided under National Rural Employment Guarantee Act / Scheme (NREGA/NREGS).
|
2008/CE-I/Misc/2/RUB(Pt)
|
14.09.2010
|
Provision of Light Foot Over Bridge (FOB) or Limited Height Subway (LHS) along with Road Over Bridge (ROB) for use by light vehicular traffic and pedestrians.
|
2010/CE-I/WP/2011-12
|
13.09.2010
|
Checklist for scrutiny of PWP Proposals of PH-30 ROB/RUB Works.
|
2007/CE-I/BRO/3 (NREGA)
|
10.09.2010
|
Construction of Road Under Bridges through funds provided under National Rural Employment Guarantee Act / Scheme (NREGA/NREGS).
|
2010/CE-II/CS/1
|
12.07.2010
|
Advance Correction Slip No. 121 to the Indian Railways Permanent Way Manual
|
2010/CE-I/LX/196
|
17.06.2010
|
Revised Standard Drawing of Precast-Fiber-Reinforced RCC Blocks for Road Surface at Level Crossing
|
2008/CE-I/LX/Target 2010-11.
|
06.06.2010
|
Works relating to manning of unmanned level crossings.
|
2006/CE-I/LX/WP/Pt-I
|
01.06.2010
|
Provision of Leaf Gates on manned LC gates.
|
2006/CE-I/LX/WP
|
07.05.2010
|
Change of Normal Aspect of Non-interlocked (Engineering & Traffic) Gates from 'Closed to road traffic' to 'Open to road traffic'
|
2010/CE-I/Estt./1 (BRO)
|
07.05.2010
|
Preparation of Abstract and Detailed / Revised Estimate.
|
2010/CE-I/Estt./1(BRO)
|
07.05.2010
|
Preparation of Abstract and Detailed/Revised Estimate.
|
2008/CE-I/Misc/2/RUB/(Pt.)
|
30.03.2010
|
LC and ROB/RUB safety works: delegation & Budget Pronouncements.
|
2006/CE-I/Misc-2(RUBs)
|
30.03.2010
|
Expeditious construction of Limited / Normal Height Subways (LHS/RUB) on Railways
|
2008/CE-I/Misc/2/RUB(Pt)
|
23.03.2010
|
Provision of Light Foot Over Bridge (FOB) or Limited Height Subway (LHS) along with Road Over Bridge (ROB) for use by light vehicular traffic and pedestrians.
|
2008/CE-I/Estt/4/BRO (Const.)
|
05.03.2010
|
Construction of ROB in replacement of Level Crossings - Sharing of Cost with the State Government - revision in the total bridge width.
|
2006/CE-I/LX/WP
|
18.01.2010
|
Manning of 1000 nos. of unmanned level crossing gates by 01.12.2010
|
2008/CE-I/Misc/2/RUB(Pt)
|
12.01.2010
|
Provision of Light Over Bridge and Foot Over Bridge at Level Crossing gates for use by ling vehicular traffic and pedestrians
|
2008/CE-I/Misc/2/RUB(Pt)
|
12.01.2010
|
Provision of Light Foot Over Bridge (FOB) or Limited Height Subway (LHS) along with Road Over Bridge (ROB) for use by light vehicular traffic and pedestrians.
|