2017/CE-IV/LX/100(Committee)
|
25.07.2018
|
Elimination of Unmanned level crossings
|
2016/CE-III/BR/BLT
|
23.07.2018
|
Ballastless track of washable aprons on Indian Railway
|
2015/CE-IV/ROB/DFCCIL(Pt.)
|
18.07.2018
|
Provision of future tracks during construction of Rail Flyovers (RFO) on DFC route
|
2017/CE-IV/Misc/RFO
|
18.07.2018
|
Provision of type of Bridge superstructure over Railway tracks in case of Rail Fly Over (RFO).
|
2009/CE-I/BRO/50/Pt.
|
12.07.2018
|
Const. of ROB/RUB in lieu of level crossings on cost sharing basis- levy of departmental charges
|
2006/CE-IV/Misc-2/(RUBs)
|
03.07.2018
|
Maintenance of Subways/RUBs in lieu of LCs
|
2018/CE-IV/Washable Apron/01
|
26.06.2018
|
Ballastless track of washable aprons on Indian Railway
|
2017/CE-IV/LX/100(Committee)
|
26.06.2018
|
Elimination of Unmanned level crossings
|
2016/CE-IV/Estt./01/(ROB)
|
30.05.2018
|
Huge variation in the cost of ROBs as compared to sanctioned cost
|
2017/CE-IV/LX/100(Committee)
|
29.05.2018
|
Elimination of Unmanned level crossings
|
2017/CE-IV/LX/Misc/244(LC)
|
18.05.2018
|
Permitting new level crossings in Railway system
|
2017/CE-IV/LX/100(Committee)
|
27.04.2018
|
Elimination of Unmanned level crossings on BG
|
2017/CE-IV/LX/100(Committee)
|
18.10.2017
|
Elimination of Unmanned level crossings on BG
|
2017/CE-IV/RUB/88
|
04.10.2017
|
Important issues related to construction of RUB/Subways including drainage.
|
2017/CE-IV/ROB/164(Policy)
|
28.07.2017
|
Width of ROB to be constructed on cost sharing basis
|
No. 2017/CE-IV/ROB/213(MoU MH)
|
19.12.2017
|
MOU between MR, MoRTH and Government of Maharashtra
|