26 |
No. 2017/CE-IV/RUB/88 |
Preventing water-logging at Subways/Road under Bridges (RUBs). |
13.12.2024 |
25 |
No. 2017/CE-IV/LX/Misc./244 (LCs) Pt. |
Procedure for processing of proposals in IRPSM and sanctioning of itemized works against Umbrella Works under Plan Head – 30 (Road Safety Works – ROB/RUB) for existing Umbrella & Onwards. |
12.11.2024 |
24 |
No. 2014/CE-IV/ROB/250 (Estt. Design) |
Type of foundation for Road Over Bridges |
12.11.2024 |
23 |
No. 2024/CE-IV/LX/TVU-Census |
TVU census of Level Crossings by AI based system. |
26.09.2024 |
22 |
No. 2017/CE-IV/LX/Misc./244 (LCs) Pt. |
Procedure for processing of proposals in IRPSM and sanctioning of itemized works against Umbrella Works under Plan-Head – 30 (Road Safetry Works-ROB/RUB) for existing Umbrella & onwards. |
06.09.2024 |
21 |
No. 2017/CE-IV/RUB/88 (RDSO) |
Preventing water-logging at Subways.0 |
02.09.2024 |
20 |
No. 2017/CE-IV/LC/Misc./244 (LCs) Pt. |
Policy for Road crossing works (ROB/RUB/LHS/FOBs/Subway) to eliminate Level Crossings and Trespassing areas under PH-30. |
19.08.2024 |
19 |
No. 2017/CE-IV/LX/Misc./244 (LCs) |
Approval of GAD for ROB/RUB/Non-LC locations. |
13.08.2024 |
18 |
No. 2017/CE-IV/LX/Misc./244 (LCs) pt. |
Joint-less box construction for LHS/RUB. |
19.07.2024 |
17 |
No. 2017/CE-IV/RUB/88 |
Preventing water-logging at Subways/Road Under Bridges (RUBs). |
01.07.2024 |
16 |
No. 2017/CE-IV/RUB/88 |
Preventing water-logging at Subways/Road Under Bridges (RUBs). |
11.06.2024 |
15 |
No. 2017/CE-IV/LX/Misc./244(LCs) Pt. |
Checking feasibility of providing Subway/RUB/ROB for elimination of LC Gates and Preparing Detailed Project Report. |
22.05.2024 |
14 |
No. 2024/CE-IV/Utility-Shifting/ROB-RUB (E.O. No.: 3459904) |
Shifting of utilities and fixed structures in Railway portion for the construction of Road Over Bridges (ROB) and Road Under Bridges (RUB)
|
14.05.2024 |
13 |
No. 2024/CE-
IV/Misc |
Use of standard RDSO RH Girders fit for 50 kmph speed during execution of LNS/Subway in Zonal Railways. |
02.05.2024 |
12 |
No. 2017/CE-IV/RUB/88 |
Construction of Road under Bridge (RUB)/Limited height Subway (LHS)
|
26.04.2024 |
11 |
No.2017/CE-IV/LX/Misc/244 (LCs) Pt.I |
Construction of Lesser cost ROB to eliminate level crossings on lower TVU roads
|
24.04.2024 |
10 |
No. 2017/CE-IV/RUB/88 |
Construction of Road under Bridge (RUB)/Limited height Subway (LHS) by innovative methods
|
16.04.2024 |
9 |
No. 2017/CE-IV/LX/Misc/244 (LCs) Pt |
Sanction of Subways at Trespass location and others
|
16.04.2024 |
8 |
No.2017/CE-IV/RUB/88 |
15-Days Special Inspection Drive for deficiencies in Subways over IR
|
09.04.2024 |
7 |
No.2017/7/CE-IV/88 |
Construction of Road Under Bridge (RUB)/Limited Height Subway (LHS) by Sliding
|
19.03.2024 |
6 |
2017/CE-IV/LX/Misc/244(LCs) Pt |
Execution of Road Safety Works in lieu of Level Crossings-Policy
|
11.03.2024 |
5 |
2015/CE-IV/ROB/78(Pt.)-I |
GAD (General Arrangement Drawing) for ROB/RUBs in RRCAS portal
|
08.03.2024 |
4 |
No. 2017/CE-IV/RUB/88 |
Trial of Precast construction for faster execution of ROBs/RUBs
|
29.02.2024 |
3 |
2017/CE-IV/RUB/88 |
Preventing water logging at Subways/RUBs
|
28.02.2024 |
2 |
2017/CE-IV/LX/Misc/244 (Pt.) |
Demand for widening of ROB/RUB by the Road owning Authority during rebuilding/replacement.
|
20.02.2024 |
1
|
2015/CE-IV/ROB/78(Pt.)-I
|
Sample GAD for ROB and RUB
|
11.01.2024
|