Letter No.
|
Date
|
Subject |
2015/CE-IV/ROB/78(Pt.)-I |
27.12.2023 |
Issues regarding Planning/Execution/Maintenance of ROB/RUB and construction of LHS. |
2017/CE-IV/LX/Misc/244(LCs)Pt. |
19.12.2023 |
Planning of elimination of LCs between Sonnagar-Gomoh section |
2017/CE-IV/LX/Misc/244 (Pt.) |
13.12.2023 |
Undertaking to be taken from State Govt. for cost sharing ROB/RUB works. |
2015/CE-IV/ROB/DFCCIL |
14.11.2023 |
Provision of additional subways (without LCs) in existing estimate of work of “Raising of speed to 160/200Kmph on existing NDLS-HWH Route incl. CNB-LKO-A mission to achieve a travel time of 12 hrs. |
2017/CE-IV/LX/Misc/244 (Pt)II. |
08.11.2023 |
Safety Audit of Grade Separator/ROBs-Provision of Safety Fencing over NH-Corridors |
2015/CE-IV/ROB/78 (Pt.)-I |
08.11.2023 |
Safety Audit of Grade Separator/ROBs-Provision of Safety Fencing over NH-Corridors. |
2017/CE-IV/RUB/88 |
30.10.2023 |
Regarding approval of General Arrangement Drawings, Structural Design & Drawing and Launching Scheme of NHAI/MoRTH etc. |
2017/CE-IV/RUB/88 |
04.10.2023 |
Policy for Road crossing works (ROB/RUB/LHS/FOBs/Subway) to eliminate Level Crossings (LSs) and Trespassing areas under PH-30. |
2023/CE-IV/LX/Misc/244 (LCs)pt |
22.09.2023 |
Sanction of itemized work under Umbrella in Plan Head-30. |
2015/CE-IV/ROB/78 (RORACS |
19.09.2023 |
Implementation of “Rail-Road Crossing GAD Approval System” for State Government & UTs. |
2023/CE-IV/LC/Misc/244(LCs)pt. |
11.09.2023 |
Sanction and Execution of Additional crossings. |
2023/CE-IV/Misc |
04.09.2023 |
Adoption of already approved drawings of thrust bed and RCC box by box Pushing technique. |
2017/CE-IV/RUB/88 |
04.09.2023 |
Proposals for construction of Subway at Trespassing locations. |
2017/7/CE-IV/88 |
01.09.2023 |
Construction of Road under Bridge (RUB)/Limited height Subway (LHS) by Box-pulling Method. |
2023/CE-IV/Misc./Estimates |
10.08.2023 |
Details to be provided along-with Detailed/Revised estimates. |
2023/CE-IV/Misc. |
10.08.2023 |
Precaution and Safety at ROB/RUB/Bridge work sites. |
97/CE-I/ROB/158(Policy) Pt. II |
28.06.2023 |
Precaution and safety Measures to be observed during & after execution of ROB/RUB/Bridge Works. |
DO No. 2015/CE-IV/ROB/78(Pt.) |
09.06.2023 |
Elimination of level crossing falling in yard. |
2015/CE-IV/ROB/78 (Pt.) |
01.06.2023 |
Preferred Span Configuration & Structural for ROBs by NHAI. |
2023/CE-IV/Misc./Background Note |
18.05.2023 |
Department related parliamentary standing committee (DrPSC) on transport, tourism and culture-meeting on 'construction of road-over bridges (ROBs) road-under-bridges (RUBs), service roads and review of road service guidelines etc. |
2023/CE-IV/Misc./Background Note |
12.05.2023 |
Department related parliamentary standing committee (DrPSC) on transport, tourism and culture-meeting on 'construction of road-over bridges (ROBs) road-under-bridges (RUBs), service roads and review of road service guidelines etc. |
2017/CE-IV/RUB/88 |
27.04.2023 |
Preventing water-logging at Subways/RUBs. |
2023/CE-IV/ROB-RUB/States/Kerela |
28.03.2023 |
Progress of Road over/ under bridges in Kerela State. |
2023/CE-IV/ROB-RUB/States/Orissa |
23.03.2023 |
Progress of Road over/Under bridges in Orissa State. |
2015/CE-IV/ROB/78 (pt) |
23.03.2023 |
Preferred span configuration &structural for ROBs ny NHAI. |
2023/CE-IV/ROB-RUB/102 |
22.03.2023 |
Progress of Road over/under bridges in Gujarat State. |
2016/CE-IV/ROB/192(Bihar) |
21.03.2023 |
Progress of road over/under bridges in Bihar State. |
2015/CE-IV/ROB-RUB/Misc/49 |
16.03.2023 |
Minutes of meeting held n 22.01.2023 in connection with issues figuring in the Group of infrastructure meeting scheduled on 24.01.2023 |
2023/CE-IV/Misc |
13.03.2023 |
Review of Cabinet Secretariat for pending unresoved issue in infrastructure projects in various States/UTs. |
2015/CE-IV/RUB/78(Setu Bandnan) |
06.03.2023 |
Construction of ROBs/RUBs on state roads CRIF scheme onder "SETU BANDHAN" programme signing of Tripartite MOU-standard operating procedure (SOP). |
2017/CE-IV/LX/Misc/244(LCs) Pt. |
02.03.2023 |
Policy for road crossing works (ROB/RUB/LHS?FOBs/Subway) to elimiate level crossings and Trespassing areas under PH-30. |
2023/CE-IV/ROB-RUB/170 |
01.03.2023 |
Acton points noted during Capacity Building Conference of CAO/Construction held on 04.02.2023 at IRICEN, Pune. |
2023/PH-30 & 32/Umbrella |
21.02.2023 |
Regarding processing of works on IRPSM (PH-30). |
2023/PH-30 &32/Umbrella-23-24 |
17.02.2023 |
Regarding distribution of umbrella cost of budget year 2023-24. |
2023/CE-II/TK/Fencingpolicy |
16.02.2023 |
Policy guidelines for providing safety fencing along the track. |
2015/CE-IV/ROB-RUB/Misc |
15.02.2023 |
Issues relaed to MoRTH/NHAI. |
2017/CE-IV/LX/Misc/244(LCs)Pt. |
14.02.2023 |
Amendment to Board's policy letter no. 2017/CE-IV/LX/Misc./244(LCs) Pt. dated 28.07.2022 (policy for level crossing (Broad Gauge) Elimination works). |
2015/CE-IV/RUB/78(Setu Bandnan) |
21.01.2023 |
Memorandum of understanding (MOU) for proposed implementation of RDBs/RUBs on state roads under CRIF scheme under "SETU BANDHAN" Programme-signing of Tripartite MOU-standard operating procedure (SOP). |
2017/CE-IV/LX/Misc./244(LCs)Pt. |
06.01.2023 |
ROB/RUB works in lieu of Level crossings. |