Letter No.
|
Subject
|
Dated
|
2007/M(C)/137/3
|
Implementation of uniform maintenance practices for all coaching stock
|
26.12.2018
|
2015/M(C)/137/1
|
provision of certain passenger interface items during coach maintenance
|
20.12.2018
|
2006/M(C)/141/25
|
Maintenance of coaching stock during Kumbh Mela 2019
|
19.12.2018
|
2002/M(C)/137/8
|
Utilisation of HOG facilities in trains
|
14.12.2018
|
97/ M(C)/137/1
|
Monitoring of jerks in CBC fitted coaches
|
12.12.2018
|
76/M(C)/137/31
|
Fire and smoke detection system
|
11.12.2018
|
2015/M(C)/137/1
|
Improvement in 1AC coaches to Swarn Standard
|
07.12.2018
|
2017/M(C)/137/4
|
Maintenance schedules of train sets
|
27.11.2018
|
2018/M(C)/143/1
|
Failures of LHB _ICF coach springs
|
22.11.2018
|
95/M(C)/141/1
|
Maintenance of trains
|
29.10.2018
|
87/ M(C)/137/22
|
Painting scheme of ICF design coaches
|
08.10.2018
|
2009/M(C)/141/6
|
Accident in 12215 DEE-Bandra at Ajmer on 26.03.2018
|
28.09.2018
|
2007/M(C)/137/16
|
Infotainment System in coaches
|
26.09.2018
|
87/ M(C)/202/10
|
Seat Numbers in 1st AC Coaches
|
26.09.2018
|
2017/M(C)/137/1
|
Provision of CCTV Camera in Coaches
|
19.09.2018
|
98/M(C)/137/8
|
Commercial Publicity Advertisement on exterior of MUTP Mumbai suburban section
|
13.09.2018
|
95/M(C)/141/1
|
Adequate Enroute examination Points
|
04.09.2018
|
91/M(C)/650/1
|
Maintenance pattern for NMG rakes
|
27.08.2018
|
2017/M(C)/137/16
|
Trial Specification RDSO_CG-18001 for (PAPIS) and LED destination board
|
31.07.2018
|
2014/M(C)/141/2
|
Numbering of coaching stock
|
20.07.2018
|
2017/M(C)/142/4
|
Redistribution of and reduction in scope of RSP work reg. Refurbishment of 6,000 ICF type coaches (P. B. Item No. 1241/17-18)
|
06.06.2018
|
2018/M(C)/143/2(Meeting)
|
Minutes of Video Conference of MRS with PCMEs of Zonal Railways held on 29.05.2018
|
05.06.2018
|
2007/ M(C) /137/16 Vol (xii)
|
Wheel Disc Failure in LHB Coaches
|
31.05.2018
|
2017/M(C)/142/4
|
Redistribution of ZRs for RSP works reg. LHB FIAT Bogies
|
25.05.2018
|
87/ M(C) /202/10 Vol (iv)
|
Transportation code for Deccan Odyssey luxury tourist train running on Central Railway
|
23.05.2018
|
2006/M(C)/137/20
|
Use of GFRE sheets in coaches
|
23.05.2018
|
97/M(C)/137/1 Vol.(xii)
|
Provision of CBC with transition coupling in LHB power cars.
|
23.05.2018
|
2007/ M(C) /137/16 Vol (xii)
|
Cases of failure of control arm of LHB coaches
|
22.05.2018
|
87/ M(C) /202/10 Vol (iii)
|
Approval of layout of NMR coaches SCZ-87 provided with modified seats similar to Double Decker rake type seats
|
15.05.2018
|
2017/M(C)/137/15
|
upgradation of trains project utkrisht
|
15.05.2018
|
2018/M(C)/142/4
|
Replacement of wheels with diameter less than 855 mm
|
11.05.2018
|
87/ M(C) /202/10 Vol (iv)
|
Allotment of Transportation codes for variant coaches CRIS
|
10.05.2018
|
2011/M(M&P)/1063/51
|
Painting Scheme for EMU Coaches
|
07.05.2018
|
2007/ M(C) /137/16 Vol (xii)
|
Cracks / Breakage of solid forged wheel disc of FIAT lR Bogie (LHB)
|
04.05.2018
|
87/ M(C) /202/10 Vol (iv)
|
Transportation code for Work Site Tamper (WST) VPR-02M supplied by We Matex JSC, Russia
|
28.04.2018
|
87/ M(C) /202/10 Vol (iv)
|
Transportation code for Utility Track Vehicle (UTV) supplied by We SAN Engineering & Locomotive , Bengalore
|
27.04.2018
|
2016/M(C)/137/2 vol.(i)
|
Provision of bio-vacuum toilet in Humsafar Coaches
|
27.04.2018
|
2017/M(C)/137/10
|
New design of rolling stock on Indian Railways
|
25.04.2018
|
2007/ M(C) /137/7 Vol (i)
|
Transportation code for LHB Non- AC (EOG) Second Class Chair Car with air spring at secondary suspension of LHB coach fitted with FIAT Bogie
|
24.04.2018
|
2001/ M(C)/137/1 vol (iii)
|
Transportation code for BG Self Generating AC-3Tier sleeper lCF designed coach fitted with Bio-Toilet & CBC and upgraded suspension system
|
24.04.2018
|
2001/ M(C)/137/1 vol (iii)
|
Transportation code for BG Self Generating Second Class Cum Luggage & Brake Van lCF design coach fitted Bio -T0ilet & CBC
having upgraded suspension system
|
23.04.2018
|
2018/M(C)/141/1
|
De-listing of Snack table & Magazine bag from passenger amenity items
|
20.04.2018
|
2007/M(C)/137/16 Vol xi
|
infotainment system in coaches
|
20.04.2018
|
2007/M(C)/137/16 V0l.(xli)
|
Setting up ‘Centre of Excellence’ for LHB air brake system at Jagadhri Workshop
|
19.04.2018
|
87/ M(C) /202/10 Vol (iv)
|
Allotment of transportation code for Utility Track Vehicle manufactured and supplied by M/s Trident Auto Components Pvt .Ltd. Kanpur
|
18.04.2018
|
87/ M(C) /202/10 Vol (iv)
|
Allotment of transportation code for High Output Tamping & Stabilizing machine model 09-3X Dynamic supplied by M/s Plasser India.
|
18.04.2018
|
87/ M(C) /202/10 Vol (iv)
|
Allotment of transportation code for Multi Purpose Tamping Machine Unimat Compact / M, manufactured by M/s Plasser India
|
18.04.2018
|
95/M(C)/l4.1/l
|
Rakes with Zero Missing Fittings
|
17.04.2018
|
2010/M(C)/137/5
|
Rail Milk Tank Vans (RMTs)
|
12.04.2018
|
2003/M(C)/141/19
|
Shifting of Primary Maintenance of 2501/12502 New Delhi-Guwahati Poorottar Sampark Kranti Express, 15601/15602 New Delhi-Silchar Poorottar Sampark Kranti Express and 14055/14056 Delhi-Dibrugarh Brahmputra Mail
|
10.04.2018
|
95/M(C)/137/42
|
Railway Board’s sanction for running express trains with LHB coaches at 130 kmph
|
10.04.2018
|
2007/M(C)/137/16 Vol. (xii)
|
Problem of Wheel Shelling on LHB Coaches
|
05.04.2018
|
2016/M(C)/137/15
|
Upgradation of trains - project utkrisht
|
03.04.2018
|
96/M(C)/165/22 Vol (ii)
|
Replacement of the term ”physically handicapped with Persons with Disabilities(Divyangjan) in train coaches
|
27.03.2018
|
2007/M(C)/13716 vol (Xi)
|
FIAT Bogies for Zonal Railways
|
20.03.2018
|
2017/M(C)/142/4
|
Retrofitment of CBC on ICF design coaches
|
16.03.2018
|
2018/M(C)/142/4
|
Distribution of RSP work of Provision of double acting AC compartment swing doors @ Rs. 70000 on 3,000 AC coaches
|
13.03.2018
|
2018/M(C)/142/4
|
Distribution of RSP work of. Provision of Fire detection and suppression system for 400 Power Cars @ Rs 7 lakhs
|
13.03.2018
|
2018/M(C)/142/4
|
Distribution of RSP work of Provision of Fire detection and suppression system for 400 Pantry Cars @ Rs 6.5 lakhs
|
13.03.2018
|
2018/M(C)/142/4
|
Distribution of RSP work of. Provision of Fire Extinguishers with anti theft arrangement in 15,000 non-AC coaches (2 nos coach) @ Rs.15000
|
13.03.2018
|
2018/M(C)/142/4
|
Distribution of RSP work of Retrofitment of crash buffers along with anti-climber in 500 ICF design coaches @ Rs. 5 lacs per coach
|
13.03.2018
|
2018/M(C)/142/4
|
Distribution of RSP work of Provision of Integrated Brallie signages in 40,000 coaches @ Rs.20000
|
13.03.2018
|
2016/M(C)/137/2 vol.(ii)
|
Running of Tejas on Central Railway
|
14.03.2018
|
2003/M(C)/141/19
|
Shifting of Primary Maintenance of Kanchenjunga Express to Sealdah
|
07.03.2018
|
2006/M(C)/202/2
|
Provision of adequate space in Garib Rath coaches to facilitate inclusion of Bed Roll charges in fare
|
26.02.2018
|
2006/M (C) /137/13
|
Cast wheels for LHB and EMU motor coaches
|
26.02.2018
|
2007/M(C)/137/16
|
Ventilation system in lCF-Design coaches
|
23.02.2018
|
2017 M(C)/137/3
|
Provision of Bypass coupler in the SLRs Power cars
|
15.02.2018
|
2007/M(C)/137/ vol.(ii)
|
Transportation code for MEMU coaches having 3- phase IGBT based propulsion system and SS car body
|
15.02.2018
|
2014 M(C)/141/2
|
Data entry in CMM
|
12.02.2018
|
2016 M(C)/137/2
|
Provision of back mounted infotainment system in coaches
|
07.02.2018
|
2017 M(C)/142/4
|
Intimation of Pink Book Item No. of RSP works sanctioned under supplementary Demand for Grants 2017-18 under Demand No.80
|
06.02.2018
|
2017 M(C)/142/4
|
Distribution of work of Fully assembled wheel-set for LHB coaches with cartridge bearings and brake discs (500 nos.) @ Rs. 3.35 lacs per wheel set, sanctioned under supplementary Demand for Grants 2017-18 under Demand No.80.
|
31.01.2018
|
2016/M(C)/137/2 V01 (ii)
|
Curtains in Humsafar coaches
|
31.01.2018
|
2017/M(C)/142/4
|
Development of model rakes with enhanced amenities and aesthetics by refurbishment of all ICF coaches
|
18.01.2018
|
2016/M(C)/137/2 V01 (ii)
|
Provision of Automatic plug type doors (4 nos. per coach) in Humsafar and Uday train coaches
|
15.01.2018
|
2002 M(C)/137/3 V01 (ii)
|
Approval & transportation code of MEMU stock having 3-phase IGBT based propulsion system and SS Car body
|
12.01.2018
|
2017/M(C)/141/8
|
Committees for evaluation of Project Swarn
|
10.01.2018
|
2004/M(C)/137/8
|
Provision of camera at rolling in points
|
01.01.2018
|