Rate Ins. No.
|
Letter No. |
Subject
|
Issued Date |
Ref. |
Supersedes |
Superseded by |
Validity |
|
|
|
|
|
|
|
From |
to |
RC-72 |
No. TCR/2217/2002/1 |
Transportation of Rail Coaches owned by
Delhi Metro Rail Corporation Ltd.(DMRC) from BEML (Baiyyappanahalli)
Bangalore to Badli(NR) : Special lump-sum haulage charges. |
31.12.2009 |
- |
- |
- |
01.01.2010 |
31.12.2010 |
Addendum-4 |
TCR/1078/2007/3 |
Classification of Iron Ore. |
24.12.2009 |
RC-36/09 |
|
|
01.01.2010 |
31.01.2010 |
RC-71 |
No. TCR/1078/2008/1 |
Operation of Merry-Go-Round (MGR) System by
Railways |
15.12.2009 |
- |
|
|
30.12.2009 |
29.12.2014 |
Corrigendum-4 of RC-39 |
No.TC-I/2009/104/1 |
Guidelines for E-payment System |
04.12.2009 |
RC-39/08 |
|
|
15.12.2009 |
TFA |
RC-70 |
TCR/1055/99/1 |
Revision of siding charges for containers at
Tuticorin Port Trust |
09.12.2009 |
- |
|
|
Date of publication in the official gazette |
TFA |
RC-69
Corrigendum dated 30.03.2010 |
TC-I/2009/201/2 |
Wharfage & Demurrage rule in respect of
Parcel/ Luggage Traffic |
09.12.2009 |
- |
|
|
01.01.2010
15.04.2010 |
TFA
TFA |
RC-68 |
No.TCR/2201/2004/1 |
Revision of miscellaneous charges. |
08.12.2009 |
- |
|
|
01.01.2010 |
31.12.2010 |
RC-67 |
No.2007/TC-I/302/1 Pt.H |
Haulage Charge recoverable for movement of
containers in privately owned wagons. |
07.12.2009 |
- |
|
|
01.01.2010 |
TFA |
RC-66
Corrigendum dated 30.06.2010 |
TC-I/94/101/2 |
Cancellation of Indents when restriction is
imposed without any time limit. |
01.12.2009 |
- |
|
|
15.12.2009
15.07.2010 |
TFA
TFA |
RC-65 |
TCR/1078/2008/8 |
Adjustment in Freight Rates effective from
Ist April, 2008- Railway Budget 2008- |
30.11.2009 |
- |
|
|
15.12.2009 |
TFA
|
RC-64 |
TCR/1147/2009/3 |
Transportation of drinking water and fodder
to notified drought affected Districts of various states : Free of
charge |
30.11.2009 |
- |
|
|
01.12.2009 |
31.01.2010 |
Addendum-3 of RC-36 |
TCR/1078/2007/3 |
Classfication of Iron ore |
24.11.2009 |
RC-36 of 2009 |
|
|
01.12.2009 |
31.12.2009 |
Corrigendum-3 of RC-39 |
TC-I/2004/104/1 Pt.1 |
Guidelines for E-payment system |
12.11.2009 |
RC-39 of 2008 |
|
|
12.11.2009 |
TFA |
RC-63 |
TC-I/2006/109/3 |
Computation of Detention Changes and Engine
Haulage Charges |
11.11.2009 |
- |
|
|
11.11.2009 |
TFA |
RC-62
Corrigendum-15
Corrig-14
Corrig-13 to RC-62 of 2009
Corrigendum-12
Corrigendum-11
Corrigendum-10 dt.09.08.2010
Corrigendum-9 to RC-62 of 2009
Corrigendum-8
Corrigendum-7
Corrigendum-6
Corrigendum 5 dated 10.05.2010
Corrigendum-4 dated 30.04.2010
Corrigendum-3 dated 22.04.2010
Corrigendum-2 dated 19.02.2010
Corrigendum-1 dated 22.01.2010
|
TCR/1078/2009/13
|
Policy Guidelines-Freight Incentive Schemes
and Transportation Products
Standard Rake Size of BTPN wagons for Vegetable Oil
Two
point combinations for steel traffic and composition of CONCORD rake.
Policy guidelines – Freight Incentive Schemes and Transportation
Products. Rake size of BCCW wagons.
Two
point combinations for steel traffic and composition of CONCORD rake. |
10.11.2009
14.12.2010
04.11.2010
30.09.2010
09.09.2010
09.08.2010
|
-RC-25 of 2008 & corrigenda thereof
RC-62 of 2009
- |
RC-25 of 2008 & corrigenda thereof
- |
|
01.01.2010
15.02.2011
01.01.2011
04.11.2010 (for 40 BCCW wagons)
01.05.2011
(onwards for 56 BCCW wagons)
01.10.2010
5.09.2010
010.9.2010
20.07.2010
20.07.2010
13.07.2010
20.07.2010
31.05.2010
01.05.2010
01.05.2010
25.02.2010
01.02.2010 |
TFA
TFA
30.04.2011
30.04.2011 (relaxation date for 40 BCCW)
TFA
31.12.2010
TFA
TFA
31.03.2011
31.03.2011
TFA
30.09.2010
TFA
-
30.04.2011
TFA
FA |
RC-61 |
TCR/1015/2008/2 |
Rates for Automobile Traffic carried on NMG,
BCACM and BCCNR wagons. |
03.11.2009 |
- |
|
|
04.11.2009 |
03.02.2010 |
Amendment-9 of RC-76 |
TCR/1394/2004/2 |
Permitting running of freight trains on CC+6
routes –Universalisation |
29.10.2009 |
RC-76 of 2007 |
|
|
15.11.2009 |
TFA |
RC-60
Corrigendum dated 11.12.2009
Corrigendum-2 Dt. 28.06.2010 |
TCR/1644/2009/1 |
Rebate in freight to (i) M/s BALCO for
transportation of Alumina and (ii) M/s RajshreeCement for transportation
of bulk cement, transported in privately owned wagons. |
29.10.2009 |
- |
|
|
07.07.2010 |
30.09.2010 |
RC-59
Corrigendum
|
No.2007/TC-I/302/1Pt.B |
Operation of container trains by Private
Container Operator (PCO) in Railway owned terminals |
23.10.2009 |
RC-49 of 2008 |
RC-49 of 2008 |
|
01.11.2009
13.11.2009 |
31.10.2010
TFA |
RC-58 |
TCR/1147/2009/2. |
Transportation of Relief Material to flood
affected districts of Karnataka and Andhra Pradesh States: free of
charge. |
06.10.2009 |
- |
|
|
06.10.2009 |
04.12.2009 |
Addendum dated 29.09.2009 |
No.2007/TC-I/302/1 Pt.E |
Operation of container trains by Private
Container Operator (PCO) in Railway owned terminals. |
29.09.2009 |
RC-49 of 2008 |
|
|
01.10.2009 |
31.10.2009 |
Corrigendum-20 of RC-25 |
TCR/1078/2008/15 |
Policy guidelines-Freight Incentive Schemes
and Transportation Products |
24.09.2009 |
RC-25 of 2008 |
|
RC-62 of 2009 |
01.10.2009 |
31.03.2010 |
Corrigendum-19 of RC-25 |
TCR/1078/2008/15 |
Two point combinations for steel traffic and
composition of CONCORD Rake |
24.09.2009 |
RC-25 of 2008 |
|
RC-62 of 2009 |
01.10.2009 |
31.12.2009 |
RC-57 |
TC-I/99/214/11 Pt.I |
Fixation of siding charge |
24.09.2009 |
- |
|
|
01.10.2009 |
TFA |
RC-56 |
TCR/1015/2009/ 7 |
Adjustment in classification of commodities |
22.09.2009 |
- |
|
|
02.10.2009 |
TFA |
RC-55 |
No.TC-I/99/214/11Pt.III |
Siding Charge |
14.09.2009 |
- |
|
|
15.10.2009 |
TFA |
RC-54 |
No. TCR/1015/2008/2 |
Rates for Automobile Traffic carried on NMG,
BCACM and BCCNR wagons |
11.09.2009 |
RC-50 of 2009 |
|
|
12.09.2009 |
TFA |
RC-53 |
No. TCR/1644/2008/3 |
Rebate in freight for Ammonia (Anhydrous
Liquefied Gas) and Phosphoric Acid transported in privately owned
wagons. |
11.09.2009 |
RC-46 of 2008 |
|
|
01.10.2009 |
30.09.2010 |
RC-52 |
No. TCR/1644/2008/3 |
Rebate in freight for traffic transported in
privately owned wagons. |
11.09.2009 |
RC-27 of 2009 |
|
|
01.10.2009 |
30.09.2010 |
Corrigendum |
No.TC-I/2005/201/2 Pt.-B |
Wharfage and Stacking rules |
20.08.2007 |
RC-21 of 2007 |
|
|
25.08.2007 |
TFA |
Corrigendum-3 of RC-21 |
No.TC-I/2005/201/2 Pt.-B |
Wharfage rules |
|
RC-21 of 2007 |
|
|
|
- |
Amendment-8 of RC-76 |
No.TCR/1394/2004/2 |
Permitting running of freight trains on CC+6
routes - Universalisation |
28.08.2008 |
RC-76 of 2007 |
|
|
10.09.2009 |
TFA |
Gazette |
|
Notified stations for the purpose of removal
of goods with delay from such stations for a period of six months w.e.f.
25.08.2009. |
10.08.2009 |
- |
|
|
25.08.2009 |
24.02.2010 |
RC-51 |
No. TCR/1394/83/6 pt. |
Tare-weighment of empty wagons supplied to
steel plants. |
21.08.2009 |
RC-28 of 2009 |
|
|
27.08.2009 |
TFA |
RC-50 |
No.TCR/1015/2008/2 |
Rates for Automobile Traffic carried on NMG
and BCACM wagons. |
21.08.2009 |
RC-38 of 2008 |
|
RC-04 of 2010 |
05.09.2009 |
TFA |
RC-49 |
NO.TCR/2217/2002/1 |
Transportation of rail coaches owned by
Delhi Metro Rail Corporation Ltd.(DMRC) from Mundra Port (Gujarat) to
Badli Station (New Delhi) and fromSavli/Pilol Station to Badli Station
(New Delhi): Special lump-sum haulagecharges. |
21.08.2009 |
RC-77 of 2008 |
RC-77 of 2008 |
- |
21.08.2009 |
31.12.2009 |
Corrigendum-18 of RC-25 |
TCR/1078/2008/15 |
Standard Rake size of BTPH and BTCS
wagons for grant of trainload rate benefit. |
17.08.2009 |
RC-25 of 2008 |
|
RC-62 of 2009 |
25.02.2010 |
TFA |
RC-48 |
TCR/2041/2004/1 |
Chargeable distance for goods
traffic-regarding |
11.08.2009 |
- |
- |
- |
- |
- |
RC-47 |
No.TC-I/2004/201/9 |
Rules regarding waiver of Demurrage/Wharfage
charges |
04.08.2009 |
RC-39 of 2004 |
- |
- |
- |
- |
RC-46 |
TCR/1394/2003/11 |
Permissible Carrying Capacity of BCN,
BCNA/BCNAHS, BCXN, BCNHL wagons booked from and to Bangladesh. |
03.08.2009 |
RC-108 of 2007 |
- |
- |
15.08.2009 |
TFA |
RC-45
Corrigendum-4 to RC-45 of 2009
Corrigendum 3 to RC-45 of 2009
Corrigendum-2 to RC-45 of 2009
Corrigendum-1 |
TC-I/2009/104/1-Pt. |
Preparation of RR and payment of freight by
CONCOR and other PCOs. |
29.07.2009 |
- |
|
RC-45 of 2009 |
01.07.2010
31.05.2010
01.04.2010 |
31.03.2010
31.07.2010
30.06.2010
31.05.2010 |
RC-44
Corrigendum |
TCR/1017/2009/7 |
Running of Mini Rake for transportation of
steel products of M/s TISCO from Tata Works Ltd. to Birrajpur |
29.07.2009 |
- |
|
|
15.08.2009 |
14.11.2009 |
Corrigendum-17 of RC-25 |
TCR/1078/2008/15 |
Standard Rake size of BOST wagons for grant
of trainload rate benefit. |
29.07.2009 |
RC-25 of 2008 |
|
RC-62 of 2009 |
15.08.2009 |
TFA |
Corrigendum1 dt.28.07.09 |
TCR/1394/2009/1 |
Pemissible Carrying
Capacity (PCC) and standard rake size of BOXNHL wagon. |
28.07.2009 |
RC-5 of 2009 |
|
|
15.08.2009 |
TFA |
RC-43 |
No.TCR/Misc/2009/6 |
Transportation of water from Nasirabad to
Bhilwara from 04.07.2009 to 07.07.09 |
28.07.2009 |
- |
|
|
04.07.2009 |
07.07.2009 |
RC-42 |
No.TCR/1543/89/1 |
Rate of terminal charges to be collected by
Port Trust Railways directly
from customers. |
15.07.2009 |
RC-88 of 2007 |
RC-17 of 2009 |
|
31.07.2009 |
31.03.2011 |
RC-41 |
No. TCR/1394/2004/2 |
Running of freight trains on CC+8 routes. |
29.06.2009 |
RC-28 of 2008 |
|
RC-21 of 2010 |
01.07.2009 |
30.06.2010 |
Corrigendum-16 of RC-25 |
TCR/1078/2008/15 |
Two Point combinations for steel traffic and
composition of CONCORD rake |
24.06.2009 |
RC-25 of 2008 |
|
RC-62 of 2009 |
01.07.2009 |
30.09.2009 |
Corrigendum-15 of RC-25 |
TCR/1078/2008/15 |
Standard Rake Size for combination of BTPN
and BTCS wagons |
24.06.2009 |
RC-25 of 2008 |
|
RC-62 of 2009 |
01.07.2009 |
TFA |
RC-40 |
No. TC-I/2005/201/2 Pt.D |
Free Time for unloading of Hopper Wagons in
case of seven old steel plants |
23.06.2009 |
RC-17 of 2008 |
|
|
01.07.2009 |
TFA |
RC-39 |
No.TCR/1015/2009/4 |
Adjustments in classification of commodities
- Timber Waste. |
17.06.2009 |
RC-27 of 2008 |
|
|
|
|
RC-38 |
No.TC-I/2004/201/4Pt.B |
Free time for movement of BOXN rakes at
Haldia Port |
15.06.2009 |
- |
|
|
|
|
RC-37 |
No.2007/TC-I/302/1Pt.H |
Haulage Charge recoverable for movement of
containers in privately
owned wagons |
01.06.2009 |
RC-26 of 2009 |
RC Nos. 24 & 26 of 2009 |
RC-67 of 2009 |
01.07.2009 |
31.12.2009 |
RC-36
Clarification dt.08.06.09 |
No.TCR/1078/2007/3. |
Classification of Iron Ore |
01.06.2009 |
- |
|
|
|
|
Addendum-1 |
|
|
30.07.2009 |
|
|
|
06.08.2009 |
05.11.2009 |
Addendum-2 |
|
|
26.10.2009 |
|
|
|
06.11.2009 |
30.11.2009 |
Addendum-3 |
|
|
24.11.2009 |
|
|
|
01.12.2009 |
31.12.2009 |
Addendum-4
|
|
|
24.12.2009 |
|
|
|
01.01.2010 |
31.01.2010 |
Addendum-5 |
|
|
29.01.2010 |
|
|
|
01.02.2010 |
28.02.2010 |
Addendum-6-Withdrawn |
|
|
|
|
|
Addendum-7 to RC-36 of 2009 |
|
|
Addendum-7
|
|
|
26.02.2010 |
|
Addendum-6 to RC-36 of 2009 |
Addendum-8 to RC-36 of 2009 |
01.03.2010 |
15.05.2010 |
Addendum-8 |
|
|
15.03.2010 |
|
Addendum-7 to RC-36 of 2009 |
Addendum-9 to RC-36 of 2009 |
17.03.2010 |
31.03.2010 |
Addendum-9 |
|
|
25.03.2010 |
|
Addendum-8 to RC-36 of 2009 |
|
01.04.2010 |
30.04.2010 |
Addendum-10 |
|
|
27.04.2010 |
|
Addendum-9 to RC-36 of 2009 |
Addendum-11o RC-36 of 2009 |
01.05.2010 |
31.05.2010 |
Addendum-11 |
|
|
28.05.2010 |
|
Addendum-10 to RC-36 of 2009 |
Addendum-12 |
01.06.2010 |
30.06.2010 |
Addendum-12
|
|
|
|
|
Addendum-11 |
Addendum-13 |
01.07.2010 |
TFA |
Addendum-13 |
|
|
24.01.2011 |
|
Addendum-12 |
- |
27.01.2011 |
TFA |
RC-35 |
No.TC-I/2009/201/1 |
Write off of Stacking Charge |
22.05.2009 |
RC-38 of 2006 |
|
|
|
|
RC-34 |
No.TCR/1078/2008/23 |
Adjustments in the classification of Iron
Ore. |
19.05.2009 |
RC-30 of 2008 |
|
RC-36 of 2009 |
28.05.2009 |
TFA |
RC-33 |
No.TCR/1099/92/2 |
Withdrawal of inflation in distances for
charge of Pimpalkutti-
Adilabad section on South Central Railway. |
18.05.2009 |
- |
|
|
01.07.2009 |
TFA |
RC-32
Corrigendum |
No.TCR/1015/2009/4.
|
Adjustments in classification of
commodities. |
18.05.2009 |
- |
|
|
25.05.2009 |
|
19.05.2009 |
|
|
|
|
|
RC-31 |
No.TC-I/2002/214/5 |
All India Engine Hour Cost(AIEHC) for
recovery of siding/ shunting
charges |
30.04.2009 |
RC-18 of 2008 |
RC-18 of 2008 |
RC-13 of 2010 |
01.07.2009 |
TFA |
RC-30 |
No.TCR/1015/2009/2. |
Adjustments in classification of
commodities. |
22.04.2009 |
- |
|
|
06.05.2009 |
TFA |
RC-29
Amendment-I |
No. TCR/1394/2003/11 |
Permissible Carrying Capacity of BG wagons |
15.04.2009 |
RC-13 of 2007 |
|
|
01.05.2009 |
TFA |
05.11.2009 |
RC-29 of 2009 |
|
|
20.11.2009 |
TFA |
Corrigendum-14 of RC-25 |
No.TCR/1078/2008/15 |
Standard Rake size of BG/MG wagons for grant
of trainload rate benefit |
13.04.2009 |
RC-25 of 2008 |
|
RC-62 of 2009 |
30.04.2009 |
TFA |
Addendum-7 of RC-76 |
No.TCR/1394/2004/2 |
Permitting running of freight trains on CC+6
routes - Universalisation |
13.04.2009 |
RC-76 of 2007 |
|
|
30.04.2009 |
TFA |
RC-28 |
No. TCR/1394/83/6 Pt |
Tareweighment of empty wagons supplied to
colliery sidings and steel |
13.04.2009 |
RC-20 of 2009 |
|
|
20.04.2009 |
TFA |
Corrig 13 of RC 25 |
No.TCR/1078/2008/15 |
Policy guidelines - Freight Incentive
Schemes and Transportation Products. |
31.03.2009 |
RC-25 of 2008 |
|
RC-62 of 2009 |
01.04.2009 |
30.06.2009 |
RC-27 |
No.TCR/1644/2006/1. |
Rebate in freight rates on Caustic Soda Lye
traffic transported in the privately
owned BTCS wagons |
31.03.2009 |
RC-60 of 2008 |
|
|
01.04.2009 |
30.09.2009 |
RC-26 |
No.2007/TC-I/302/1Pt.H |
Haulage Charge recoverable for movement of
containers in privately owned wagons |
31.03.2009 |
- |
|
RC-37 of 2009 |
01.01.2009 |
30.06.2009 |
RC-25 |
No. TCR/1618/2008/14 |
Freight Concession for Iron ore traffic
(Class 200X) |
30.03.2009 |
RC-04 of 2009 |
|
RC-36 of 2009 |
01.04.2009 |
30.06.2009 |
RC-24 |
No.2007/TC-I/302/1Pt.H |
Haulage Charge recoverable for movement of
containers in privately owned wagons |
27.03.2009 |
- |
|
RC-37 of 2009 |
01.01.2009 |
30.06.2009 |
Corrig 12 of RC 25 |
No.TCR/1078/2008/15 |
Policy guidelines - Freight Incentive
Schemes and Transportation Products. |
26.03.2009 |
RC-25 of 2008 |
|
RC-62 of 2009 |
01.04.2009 |
30.09.2009 |
Corrig 11 of RC 25 |
No.TCR/1078/2008/15 |
Standard rake size of BTAP, BTCS, BTAL and
BTFLN wagons. |
26.03.2009 |
RC-25 of 2008 |
|
RC-62 of 2009 |
15.04.2009 |
TFA |
RC-23 |
No.TCR/1078/2006/13 |
Movement of Railway Material Consignments
(RMC) |
20.03.2009 |
RC-43 of 2007 |
RC No. 34 & 104 of 2006 & RC-43 of 2007 |
|
15.04.2009 |
TFA |
RC-22 |
TCR/1078/2008/11 |
Dynamic Pricing Policy- Levy of Busy Season
Charge and Congestion charge |
19.03.2009 |
- |
|
|
01.04.2009 |
31.03.2010 |
RC-21 |
No.TCR/1394/2009/3 |
Permissible Carrying Capacity (PCC) and
standard rake size of BCNHL wagon |
09.03.209 |
- |
|
|
20.03.2009 |
TFA |
Corrigendum-2 of RC-39 |
No.TC-I/2004/104/1-pt. |
Guidelines for E-payment system |
|
RC-39 of 2008 |
|
|
23.02.2009 |
TFA |
Corrigendum-10 of RC-25 |
No.TCR/1078/2008/15 |
Policy Guidelines – Freight Incentive
Schemes and Transportation product. |
|
RC-25 of 2008 |
|
RC-62 of 2009 |
01.03.2009 |
TFA |
Gazette Notification |
- |
- |
13.02.2009 |
- |
|
|
25.02.2009 |
24.08.2009 |
RC-20
Corrigendum
|
No. TCR/1394/83/6 Pt. |
Tareweighment of empty wagons supplied to
colliery sidings |
17.02.2009 |
RC-85 of 2007 |
RC Nos 04, 56 of 2006
|
|
27.02.2009 |
TFA |
05.03.2009 |
|
RC-85 of 2007 |
|
06.03.2009 |
TFA |
RC-19 |
No. TCR/1394/83/6 Pt. |
Tare-weighment of empty wagons supplied to
steel plants |
17.02.2009 |
RC-42 of 2008 |
RC-82 of 2007 & RC-42 of 2008 |
|
27.02.2009 |
26.08.2009 |
RC-18 |
No. TCR/1147/2008/2 |
Transportation of Relief Material/Fodder to
notified flood affected districts of Bihar State- Free of charge |
16.02.2009 |
RC-79 of 2008 |
|
|
22.01.2009 |
21.02.2009 |
Amendment-6 of RC-76 |
No.TCR/1394/2004/2 |
Permitting running of freight trains on CC+6
routes - Universalisation |
16.02.2009 |
RC-76 of 2007 |
|
|
24.02.2009 |
TFA |
RC-17 |
No.TCR/1543/89/1 |
Rate of terminal charges to be collected by
Port Trust Railways directly from customers from 01.04.2009 to
31.03.2011. |
16.02.2009 |
RC-88 of 2007 |
|
RC-42 of 2009 |
01.04.2009 |
31.03.2011 |
RC-16 |
No.TCR/1015/2008/2 |
Rates for Automobile Traffic carried on NMG
and BCACM wagons. |
13.02.2009 |
RC-38 of 2008 |
|
|
22.02.2009 |
19.08.2009 |
RC-15 |
TCR/2201/2006/1 |
Haulage Charges of Brake Van utilized by Container Train
Operators |
12.02.2009 |
RC-11 of 2008 |
|
|
01.04.2009 |
31.03.2010 |
RC-14 |
TC-I/2008/214/1 |
Shunting Charge |
06.02.2009 |
- |
|
|
01.04.2009 |
TFA |
RC-13 |
99/TC-I/101/2 |
Levying of Wagon Registration Fee (WRF) |
06.02.2009 |
RC-07 of 2006 |
|
|
20.02.2009 |
TFA |
RC-12 |
TC-I/2007/108/4 |
Weighment of molasses and edible oils when
loaded in Tank wagons. |
06.02.2009 |
- |
|
|
06.02.2009 |
TFA |
RC-11 |
TC-1/95/104/3 Vol I |
Implementation of CNCC
facility with FCI |
04.02.2009 |
- |
|
RC-32 of 2005 |
Date of publication in the official gazette |
TFA |
RC-10 |
TCR/1055/95/1 |
Revision of Charges
payable to Tuticorin Port Trust Railway |
04.02.2009 |
- |
|
|
As notified by Railway on a suitable date |
TFA |
RC-09 |
TCR/1055/95/1 |
Revision of rates on
Mumbai Port Trust Railway. |
04.02.2009 |
- |
|
|
04.02.2009 |
TFA |
RC-08
Corrigendum-1
|
TCR/1055/95/1.
|
Revision of Haulage charges payable to Port
Trusts |
04.02.2009
|
|
|
|
01.03.2009 |
TFA |
16.02.2009 |
|
|
|
|
|
RC-07
Corrigendum
|
TCR/1078/2008/1 |
Operation of
Merry-Go-Round (MGR) System by Railways. |
04.02.2009 |
RC-23 of 2008 |
|
RC-71 of 2009 |
01.04.2009 |
31.03.2014 |
18.02.2009 |
|
|
|
|
|
RC-06 |
No.2007/TC-I/302/1 |
Hub & Spoke System |
04.02.2009 |
- |
|
|
13.02.2009 |
31.03.2009 |
RC-05
Corrigendum-1 |
TCR/1394/2009/1 |
Pemissible Carrying
Capacity (PCC) and standard rake size of BOXNHL wagon. |
03.02.2009 |
- |
|
|
07.02.2009 |
TFA |
28.07.2009 |
|
|
|
15.08.2009 |
TFA |
Amendment-5 to RC-76 |
No.TCR/1394/2004/2 |
Permitting running of
freight trains on CC+6 routes - Universalisation |
03.02.2009 |
RC-76 of 2007 |
|
|
10.02.2009 |
TFA |
Corrigendum |
TC-1/2002/109/5-pt.
|
Acceptance of
weightometer/Belt Weigher at par with weighbridges for weighment of
loose consignment. |
03.02.2009 |
RC-50 of 2008 |
|
|
15.01.2009 |
14.04.2009 |
RC-04 |
TCR/1618/2008/14 |
Freight concession for Iron ore traffic
(Class 200X) |
30.01.2009 |
RC-83 of 2008 |
|
RC-36 of 2009 |
01.02.2009 |
31.03.2009 |
RC-03 |
TCR/1015/2008/4 |
Adjustments in classification of commodities |
27.01.2009 |
- |
|
|
01.02.2009 |
TFA |
RC-02 |
TCR/1618/2008/16 |
Freight concession for Iron ore traffic
(Class 200X) from S.C.Railway |
21.01.2009 |
- |
|
RC-36 of 2009 |
27.01.2009 |
31.03.2009 |
Corrigendum-9 to RC-25 |
TCR/1078/2008/15 |
Policy Guidelines - Freight Incentive
Schemes and Transportation products |
21.01.2009 |
RC-25 of 2008 |
|
RC-62 of 2009 |
27.01.2009 |
TFA |
Corrig to RC-59 |
TCR/1394/2004/2 |
Chargeable weight for DAP (Di Ammonium
Phosphate) on CC+8 routes when loaded in BCNA/BCNAHS wagons |
16.01.2009 |
RC-59 of 2008 |
|
|
24.01.2009 |
TFA |
Corrigendum-2 of RC-56 |
TCR/1394/2008/11 |
Charging for privately owned BCBFG wagons. |
13.01.2009 |
RC-56 of 2008 |
|
|
19.01.2009 |
TFA |
Corrigendum-8 of RC-25 |
TCR/1078/2008/15 |
Standard rake size of BG wagons for grant of
train load rate benefits. |
12.01.2009 |
RC-25 of 2008 |
|
RC-62 of 2009 |
|
|
RC-01 |
No. TCR/2217/2002/1 |
Transportation of Wagons by Rail Vikas Nigam
Limited one each from Sahibabad(NR) to Barang(ECoR), Guntakal(SCR),
Khurja(NCR) and Kosi Kalan(NCR). |
06.01.2009 |
- |
|
|
06.01.2009 |
|
Corrigendum-7 of RC-25 |
TCR/1078/2008/15 |
Two point combinations for steel traffic and
composition of CONCORD rake. |
05.01.2009 |
RC-25 of 2008 |
|
RC-62 of 2009 |
01.01.2009 |
31.03.2009 |