Circulars/ Letters |
2023 |
2021/W-I/Genl./GatiShakti |
Corrigendum to Railway Board's letter no. 2021/W-I/Genl./Gati Shakti dt. 27.07.2022 for Setting up of Gati Shakti Units in Divisions |
26.10.2023 |
2023/Proj./MUTP-III/VR-DRD/1/4 |
Clarification on exemption of Railway projects from the requirement of Environment Clearance (EC) and Coastal Regulation Zone (CRZ) Clearance as per Section 11 of Railways Act, 1989-reg. |
13.10.2023 |
2021/W-I/Genl./PMG |
Updation of PMG Portal. |
19.06.2023 |
2019/W-1/Genl./Land-LC |
Mutation and completion of land records for land acquired for railway projects |
08.06.2023 |
2021/W-I/Genl./Gatishakti Pt. |
Corrigendum to Operationalization of GatiShakti Units in the Divisions Board's letter of even number. |
29.03.2023 |
2020/W-I/Genl./Forest & Wildlife (e-3336964) |
Clarification on Right of Way (RoW) mentioned in guidelines dated 10.03.2022 issued by MoEFCC. |
21.03.2023 |
2022 |
2018/W-I/Genl./Landacquisition |
Execution of new line projects policy. |
25.11.2022 |
2022/W-I/Genl/DPR Proforma (E-off: 3404238) |
Proforma for preparation and submission of Detailed Project Report for New Line/ Doubling/ Multi Tracking/ Gauge Conversion. |
02.09.2022 |
2021/W-I/Genl./Gatishakti |
Setting up of Gati Shakti Units in Divisions. |
27.07.2022 |
2022/W-I/Genl./Gatishakti |
Submission of document for projects costing more than Rs. 500 crore each. |
27.07.2022 |
2022/W-I/Genl./PRAGATI |
Use of Soil and silt excavated from Amrit Sarovar for infrastructure projects reg. |
13.06.2022 |
2021/W-I/Genl./Gatishakti |
Setting up of Gati Shakti Unit under DRM/Agra |
09.06.2022 |
2021/W-I/Genl./POLICY (E-Offc-3360817) |
Comprehensive Project Appraisal System for sanctioning new projects by factoring in the "Network Effect". |
06.06.2022 |
No.2022/W-I/Genl./Targets. |
New Line, Gauge conversion and Doubling works targeted for commissioning during FY 2022-23 and plan to increase capital expenditure on these projects. |
25.05.2022 |
2017/W-I/Genl./Board Meetings |
Setting up of Gati Shakti Units in Khurda, Bilaspur, Delhi & Bengaluru divisions. |
16.05.2022 |
2017/W-I/Genl./Board Meetings |
Engineering Traffic Allowance (ETA) & Block for infrastructure works. |
16.05.2022 |
2021/W-I/Genl./POLICY (E-Offc-3360817) |
Detailed Project Report (DPRs)/ Detailed Estimates (DE)/ Revised Estimates (RE)/ of New/Sanctioned Projects |
12.05.2022 |
2022/W-I/Genl./infrastructure projects |
Faster implementation of infrastructure projects. |
06.05.2022 |
2021/W-I/Genl./POLICY (E-Offc-3360817) |
Detailed Project Report (DPR) for projects |
06.05.2022 |
2021/W-I/Genl./POLICY (E-Offc-3360817) |
Revision in Cost & Quality of works in various projects. |
25.03.2022 |
2019/W-I/Genl./Policy Pt. 1 (E-offc-3289535) |
Provision of Ballastless track (BLT) in tunnels. |
11.03.2022 |
2021/W-I/Genl./FLS (E-offc-3371701) |
Sanction for Final Location Surveys (FLS) |
08.03.2022 |
2015/W-I/Genl./CORR.GM/Pt. III (E-offc-3149695) |
EPC Tender |
04.03.2022 |
2021/W-I/Genl./TF/Works (E-offc-3336630) |
Sanction of sub-works against Umbrella Works of 2020-21 of Traffic Facility Plan Head(PH-16) |
15.02.2022 |
2021/W-I/Genl./FLS (E-offc-3371701) |
Sanction for Final Location Surveys (FLS) |
08.02.2022 |
2021/W-I/Genl./FLS (E-offc-3371701) |
Sanction of Preliminary Engineering cum Traffic Survey for Nemisharanya to Farrukhabad via Hardoi new BG line (112 km) |
07.01.2022 |
2021/W-I/Genl./FLS (E-offc-3371701) |
Sanction for Final Location Survey for Imphal - Moreh new BG line. |
05.01.2022 |
2021 |
2021/W-I/Genl./FLS (E-offc-3371701) |
Sanction for Final Location Surveys (FLS) |
30.12.2021 |
2021/W-I/Genl./FLS (E-offc- 3371701) |
Sanction for Final Location survey (FLS) |
17.12.2021 |
2021/W-I/Genl./FLS (E-offc- 3371701) |
Sanction of Preliminary Engineering cum Traffic (PET) surveys. |
26.11.2021 |
2021/W-I/Genl./Addl.funds for survey |
Additional fund allotment in RE 2021-22 for important/ recently sanctioned Final Location Survey Works. |
26.11.2021 |
2021/ED(ProjM)/Misc/Committee |
Construction of new Bridge during Doubling. |
12.11.2021 |
2021/W-I/Genl./Policy |
Provision of Facilities for Track Machine Staff |
27.10.2021 |
2021/W-I/Genl./FLS (E-office - 3371701) |
Sanction of Final Location Survey. |
21.10.2021 |
2021/W-I/Genl./FLS (E-office - 3371701) |
Sanction of Final Location Survey. |
11.10.2021 |
2020/W-I/Genl./TF/Works (E-office - 3336630) |
Sanction of works against umbrella Work of 209-20 of Traffic Facility Plan Head (PH-16) |
29.09.2021 |
2018/W-I/Genl/Policy |
Adoption of modern methods for construction of tunnels |
10.09.2021 |
2018/W-I/Genl/MoSPI |
Updation of data on Portals |
05.07.2021 |
|
Revision of Rates and scope of Final Location Survey (FLS) |
30.06.2021 |
2020/W-I/Genl/Survey Rates |
Revision of Rates for Final Location Survey (FLS) |
16.06.2021 |
2020/W-I/Genl./PMO (E-offc- 3334070) |
List of Railway projects monitored through PRAGATI (25.03.2015 to 24.02.2021) |
10.06.2021 |
2020/W-I/Genl./PMO |
Monitoring of Projects by PMO through PMREF portal |
04.06.2021 |
2020/W-I/Genl./Vision 2024 |
NOMINATION OF HAG OFFICER FOR MONITORING OF PROJECTS DATED 28.05.2021 |
28.05.2021 |
2019/W-I/Genl/Cost Sharing |
D.O. Letters to CMs regarding Projects on Cost Sharing Projects. |
03.05.2021 |
2012/W-I/Surveys/Budget |
Sanction of Final Location Survey for works under Doubling Plan Head. |
22.03.2021 |
2021/W-I/Genl/Target |
Target Date of Completion of projects. |
19.02.2021 |
2020/W-I/Genl./Vision 2024 |
Nomination of HAG Officers for monitoring of Priority Projects of Vision 2024 Dated 20.01.2021 |
20.01.2021 |
2020/W-I/Genl/Survey Report |
Use of Modern Survey Technologies for Survey of New Line, Gauge Conversion & Doubling Projects. |
06.01.2021 |
2020/W-I/Genl./Vision 2024 |
Vision 2024 Document |
28.12.2020 |
2015/W-1/Genl./Corr.GM/Part-2 |
Carrying out FLS and submission of DPRs by Zonal Railways. |
07.10.2020 |
98/W-1/Genl./0/30 Pt. |
Maintenance of newly commissioned New Line/Doubling/Gauge Conversion sections. |
14.09.2020 |
2013/W-I/Genl/0/30/Pt.II |
Preparation of estimates and Excess Expenditure incurred by Railway over and sanctioned detailed estimates during the course of execution of projects. |
11.05.2020 |
98/W-I/Genl/O/30-Pt. |
General Instructions regarding surveys of railway projects. |
18.02.2020 |
2013/W-I/Genl/0/30 Pt.II |
Platfrom lenght at Railway Stations for new line, gauge conversion & doubling projects |
25.02.2020 |
2018/E-1/Genl/Land Acquisition |
Execution of new line projects-Policy regarding. |
05.02.2020 |
2017/W-I/Genl./Sfety/Policy |
Platform level for new Construction/Platform raising works. |
31.01.2020 |
2012/W-I/Genl./Surveys/Budget |
Sanction of Final Location Surveys for sanctioned work of New Line Plan Head. |
21.01.2020 |
2012/W-1/Genl./Surveys Budget |
Sanction of Final Location Surveys for sanctioned work of Doubling Plan Head. |
16.01.2020 |
2013/W-I/Genl/O/30/Pt.II |
Construction of formation for Doubling on DFC feeder routes. |
18.12.2019 |
2019-B-104 |
Corrigendum to Works, Machinery & Rolling Stock Programme 2019-20 |
12.12.2019 |
2013/W-I/Genl/0/30 Pt.II |
Elimination of level crossings in Doubling Projects. |
10.10.2019 |
2019/W-I/Genl./land-LC |
Level Crossing on new line projects. |
10.06.2019 |
2019/W-I/Genl./ViIKAS SAMVAD |
Review of Important Insfrastructure Projects through VIKAS SAMVAD |
27.03.2019 |
2015/W-I/Genl/CORR.GM/P.III |
Execution of New Line, guage Conversion and Doubling Projects. |
25.02.2019 |
2018/W-I/Genl./Target 2018-19 |
Commissioning NewLine Gauge Conversion and Doubling. |
|
2015/W-1/Genl./Corr.GM/Pt.II |
Approval and Execution of projects of New Line, Gauge Coversion and Doubling included in Budget 2018-19 and later subject to requisite approvals appearing with # mark in Pink Book. |
30.01.2019 |
|
|
|
2015/W-I/Genl./Corr.GM/Pt. |
Speed Policy framework for Indian Railways. |
06.12.2018 |
2017/W-I/Genl/Policy |
Execution of Works under various Plan Head costing more than Rs. 3 Crores. |
05.12.2018 |
2015/W-I/Genl./CORR.GM/Pt.III |
EPC Tender. |
30.11.2018 |
DO No. 2018/W-I/Genl/Target 2018-19 |
Commissioning of New Line, Gauge Conversion & Doubling. |
26.11.2018 |
2018/W-1/Genl./CAO(C)Conf. |
Review meeting of commissioning of New Line / Gauge Conversion / Doubling on 01.11.2018 |
12.11.2018 |
2018/W-I/Genl/CAO/review meeting |
Infrastructure Works Review video conference (VC) with GMs of Zonal Railways and CMDs of PSUs held on 11th September 2018. |
26.09.2018 |
2018/W-I/Genl./Policy |
Policy Guidelines on Loop line and Siding. |
07.09.2018 |
2018/W-I/Genl/Land Acquisition/Pt I (e Off-3265888) |
Land acquisition for Railway Projects in tunneling portion. |
06.09.2018 |
2018/W-I/Genl./Policy |
Policy guidelines - Execution and algnment of 3rd Line Projects. |
04.09.2018 |
2013/PL/19/1 (Policy) |
Policy Guidelines - Execution and alignment of 3rd Line Projects. |
05.07.2018 |
2017//W-I/Genl./Misc. |
Execution of New Line Projects Policy |
29.06.2018 |
2013/W-I/Genl/0/30 Pt.-II |
Degree of curvature for new projects of New Line, Guage Conversion and Doubling and Level crossing in New Line. |
28.05.2018 |
2018/W-I/Genl./Target 2018-19 (CRB's Letter to Rly Units) |
CR, ECOR, ECR, ER, NCR, NER, NFR, NR, NWR, SCR - (Revised), SECR, SER, SR, SWR-(Revised), WCR, WR - (Revised), IRCON, RITES, RVNL
|
09.05.2018 |
2013/W-I/Genl/0/30 Pt.II |
Degree of curvature for new projects of New Line, Guage Conversion and Doubling. |
04.05.2018 |
2012/W-I/Genl./Surveys/Budget |
Sanction of Final Location Surveys-2018 |
20.02.2018 |
2017/W-I/Genl./Nodal Officer |
Indian Railways Nodal Officer (project-wise). |
18.01.2018 |
2017/W-I/Genl./Policy |
Flash Butt welding of Rails. |
18.12.2017 |
2017/W-I/Genl./Misc. |
Execution of New Line Projects - Land Issues with State Govts. |
06.12.2017 |
2015/W-I/Genl./Corr.GM/Pt. |
Policy regarding Construction of 3rd and 4th line. |
29.11.2017 |
2017/W-I/Genl./Monthly Achievement |
Details to be included in Monthly PCDO. |
27.11.2017 |
2015/W-I/Genl./Corr.GM/Pt.II |
Approvals and execution of 54 NL, GC DL projects included in Budget 2017-18. |
16.11.2017 |
2013/W-I/Genl./0/30 Pt.II |
Platform level for new construction- Platform raising work. |
02.11.2017 |
2017/W-I/Genl./Policy |
Execution of New Line projects. |
30.10.2017 |
2014/W-I/Genl./Group of Infra |
Clarification of MoEF&CC with respect of Gauge Conversion works. |
27.09.2017 |
2016/W-I/Genl./Budget (RE & BE) |
Booking Head for Expenditure on land acquisition provided free of cost by State Governments. |
15.09.2017 |
2017-B-106 |
Works-Re-appropriation (CAP & EBR(IF) – Sept 2017. |
06.09.2017 |
2017/SIG/WP/Double Dist. |
Provision of Second Distant Signal on ‘B’ Route and doubling/tripling projects. |
22.08.2017 |
2017/W-I/Genl./Policy/1 |
Execution of Yard Remodelling works in all New Line, Gauge Conversion and Doubling projects. |
11.08.2017 |
2015/W-I/Genl./Corr.GM/Pt. |
Project implementation and Monitoring. |
25.07.2017 |
2017/W-I/Genl./Policy/1 |
Inclusion of TRD Estimate in NL,GC & DL proposals in already electrified/under electrification territory |
05.07.2017 |
2017/WI/JV/Genl/State JV |
Standard MOA Standard AOA |
02.06.2017 |
2017/W-I/Genl./Survey/1 |
Delegation of powers to CAO(C)s for Tender to Survey. |
22.05.2017 |
2013/W-I/Genl./O/30 Pt.II |
Provision of fixed structure in New Line and Gauge Conversions and setting of Gate Lodges, Station Building etc. alongside the existing track. |
12.05.2017 |
2013/W-I/Genl./O/30 Pt.II |
Provision of transition curve in New Line & Gauge Conversion |
12.05.2017 |
2015/W-I/Genl./CORR.GM/Pt.III |
Timelines for submission of pending DPRs. |
25.04.2017 |
2017/W-I/Genl./Budget |
Execution of projects – Earmarking of funds. |
01.05.2017 |
2016/W-I/Genl./Monthly Achievement |
Targets for commissioning of New Line, Gauge Conversion and Doubling projects in 2017-18. |
27.04.2017 |
2012/W-I/Genl./Surveys/Budget |
2017-18 - Sanction of Final Location Surveys |
20.02.2017 |
2016/W-II/ECoR/Misc/24 |
Revision in OHE parameters. |
31.01.2017 |
2016/W-I/Genl./NL-RE |
OHE Layout Planning in RE Works on Single Line |
27.01.2017 |
2016/W-I/Genl./Corr. |
Reporting of New Line, Gauge Conversion and Doubling in monthly PCDO.
|
09.01.2017 |
2012/W-I/Genl./Survey/Budget |
Survey estimate. |
18.11.2016 |
2015/W-2/SCR/NL/22 dated 20.10.2016 |
Land Acquisition under Section 108 of RFCTLARR Act, 2013 |
20.10.2016 |
2016/W-I/Genl./Monthly Achievement |
Video Conferencing (16.09.2016) on Commissioning of NL, GC, DL & ROB |
09.09.2016 |
2016/W-I/Genl./Monthly Achievement |
Additional Targets for Commissioning of NL,GC & DL projects 2016-17 |
06.07.2016 |
2014/W-I/Genl./SPV/States |
Model Joint Venture Agreement, Article of Association, Memorandum of Association. |
08.07.2016 |
2016/W-I/Genl./Monthly Achievement |
Month-wise targets for achievement of New Line, Gauge Conversion and Doubling projects during 2016-17 |
22.06.2016 |
2012/W-I/Genl./Surveys/Budget |
Sanction of Surveys |
13.05.2016 |
2015/W-I/Genl./CORR.GM/Pt.III |
T&C of transfer of projects to PSUs (other than RVNL)
|
05.05.2016 |
2015/W-I/Genl./CORR.GM/Pt.III |
Letters regarding EPC Tender.
|
04.05.2016 |
2015/W-I/Genl./CORR.GM/Pt.III |
Tender for Works Contracts. |
04.05.2016
|
2015/W-I/Genl./CORR.GM/Pt.III |
77 Doubling, 2 New Lines and 1 Gauge Conversion project included in Budget 2015-16 |
12.04.2016 |
2013/W-I/Genl./Surveys/Budget |
Change of zone of Surveys |
12.04.2016 |
2015/W-I/Genl./CORR .GM Pt.III |
Para 105 of MR Budget Speech |
01.04.2016 |
2015/W-I/Genl./Surveys/Budget |
2016-17 sanctioned Surveys of NL,GC,DL Projects |
31.03.2016 |
2015/W-I/Genl./Presentation |
T&C of awarding Projects other than RVNL |
21.03.2016 |
2015/W-I/Genl./CORR .GM Pt.III |
59 Projects included in Rail Budget 2016-17. |
15.03.2016 |
2015/W-I/Genl./Presentation/Pt |
Terms & Condition of transfer of projects to PSUs (other than RVNL).
|
15.03.2016 |
2012/W-I/Genl/Survey Budget/Pt-III |
Sanction of new line survey. |
23.02.2016 |
2014/W-I/Genl./SPV/States |
Projects to be taken up in SPV Model through State JVs. |
10.02.2016 |
2011/CE-I(Spl.)/CT/0/4 |
Empowerment to Field Organisations (Works Contract Matters) Power for Awarding Single Tender in Projects targetted for completion. |
28.01.2016 |
RS/G/108/Heavy Axle Load |
Revised Guidelines for Blanketing Thickness
|
19.10.2015 |
2016/W-I/Genl./Display |
Installation of Display Board on important railway stations depicting project status. |
01.01.2016 |
2015/W-I/Genl./Presentation/Pt. |
Terms and conditions of assignment of projects to RVNL.
|
31.12.2015 |
-- |
Memorandum of Understanding for formation of JV Company with Goveernment of Odisha. |
-- |
2015/W-I/Genl./EBR/1 |
Sanction of doubling of SCR,SWR & NCR.
|
18.11.2015 |
2015/W-I/Genl./EBR/3 |
Sanction of doubling of SER & ECR.
|
18.11.2015 |
2015/W-I/Genl./EBR/2 |
Sanction of doubling of ECR, SECR & WCR |
18.11.2015 |
2015/W-II/DL/DPR/CCEA/40 |
Sanction of doubling of CR, SER, ECoR, SWR & SER |
18.11.2015 |
-- |
Memorandum of Understanding for formation of JV Company with Government of Odisha.
|
|
2015/W-I/Genl/CORR.GM/Pt.III |
Fast track execution of 77 capacity augmentation projects sanctioned in 2015-16: Invitation of tender reg. |
17.11.2015 |
2015/W-I/Genl./CORR.GM/Pt.III |
Fast track execution of 77 capacity augmentation projects sanctioned in 2015-16: Invitation of tender reg.
|
23.10.2015 |
2015/O&M/5/4 |
Revised power limit of approval of railway projects |
20.10.2015 |
2015-B-106 |
Re-appropriation of funds under Demand No. 16 |
19.10.2015 |
2015/W-I/Genl/CORR.gm/Pt. |
Fast Track execution of 77 capacity augmentation projects sanctioned in 2015-16: Invitation of tender reg. |
12.10.2015 |
2015/W-I/Genl./CORR.GM/Pt-III
|
Invitation of tenders reg.- Fast track execution of 77 capacity
augmention projects sanctioned in 2015-16.
|
09-10-2015
|
2007/CE-I/CT/0/20/1
|
Powers of acceptance of Works Tenders.
|
08.10.2015
|
2004/WI/RVNL/10
|
RVNL Projects- Execution of yard remodeling works
|
01.10.2015
|
2015/W-I/Genl/Corr.GM/Pt. |
Guidelines for economy in 77 DL, 2 NL & 1 GC Projects. |
29.09.2015 |
2015/W-1/Genl/Corr. GM/Pt.III |
Fast Track execution of 77 capacity augmentation projects sanctioned in 2015-16. |
17.09.2015 |
2013/W-I/Genl/o/30 Pt-II |
Removal of unmanned and non-interlocked level crossings by way of construction of RUB/LHS. |
11.09.2015 |
2015/W-I/Genl./Corr.GM/Pt.III |
Reiteration of guidelines for preparation of DPRs. |
06.08.2015 |
2015/W-I/Genl./Corr.GM/Pt.III |
Fast Track execution of 77 capacity augmentation projects sanctioned in Budget 2015-16. |
03.08.2015 |
2015-B-106
|
Re-appropriation of funds under Demand No. 16
|
26.06.2015
|
2013/W-I/Genl./0/30-Pt.-II
|
Submission of re-appropriation proposals of construction projects
to Railway Board.
|
11.06.2015
|
2013/W-I/Genl./Commissioning |
Targets for commissioning of New lines, Gauge Conversion and
Doubling Projects
|
29.05.2015 |
2015/W-I/Genl/Budget |
Execution of Projects-Earmarking of funds |
29.04.2015 |
2015/W-I/Gen/Corr.GM |
77 Doubling, two new lines. One Guage Conversion projects proposed in Budget 2015-16. |
17.04.2015 |
2013/W-I/Genl./Surveys/Budget |
Corrigendum - Change of Zone of surveys/works. |
08.04.2015 |
2014/W-I/Genl./NF/LMG-SCL/Tunnel-10
|
Guidelines for self rescue, safe exit/escape in tunnels more than 3
kms in length.
|
01.04.2015 |
2013/W-I/Genl./Survey/Budget
|
Sanction of surveys.
|
01.04.2015 |
98/W-I/Genl./0/30-Pt.-I
|
Checklist for documents to be attached with the PETS/RETS/FLS
reports.
|
27.03.2015
|
2012/W-1/Genl/Surveys/Budget/Pt. |
Sanction of Surveys |
25.03.2015 |
2015/W-I/Genl./Corr.GM |
77 DL, 2 NL & 1 GC projects proposed to be included in 2015-16 letter
dtd 30.3.15 & 24.03.2015 |
24.03.2015 |
98/W-I/Genl/0/30 Pt.-I |
Submission of survey reports and estimate to Railway Board |
17.02.2015 |
90/W-2/NL/E/5/Vol.II Pt. |
Excess expenditure incurred by Railways over and above sanctioned detailed estimates during the course of execution of projects. |
27.01.2015 |
98_W-1/Genl/O/30 Pt.I |
Corrective action to increase the formation width. |
13.01.2015 |
2014
|
2014/W-I/Genl./Group of Infra
|
Guidelines for utilization of forest land for non-forest purpose |
30.12.2014 |
2010/LML/12/8 |
Notification of Special Railway Projects under the Railways Amendment Act,2008 for Land Acquisition |
19.12.2014 |
F(X)-II/2014/PW/6 |
Delegation of Powers. |
11.12.2014 |
2013/W-I/Genl./0/30 Pt.II
|
Contractual Payment
|
15.12.2014
|
No. 2014-B-106
|
Re-appropriation of funds
|
24.11.2014
|
2004/W-I/Genl./Staff Matters
|
Sending reply to Board by Zonal Railways.
|
24.11.2014
|
2013/W-I/NFR/Strategic Lines
|
Declaration of 19 rail section as Strategic Lines by Defense Ministry
|
05.11.2014
|
2014/W-I/Genl./Target 14-15
|
NL,GC,DL Target set for Zonal Railways and RVNL.
|
03.11.2014
|
2014/W-1/Genl./Budget 14-15/Item
|
Setting up of Project Monitoring and Coordination Group in terms of
Budget Pronouncement 2014-15 vide item No.
|
28.10.2014
|
2014/W-1/Genl./EC/22
|
Guidelines for diversion of forest land for non-forest purpose and
compensatory afforestation.
|
27.10.2014 |
2012/W-I/Genl./Surveys/Budget
|
Expeditious Completion of Surveys.
|
09.10.2014
|
91/W-I/Genl/0/30-Pt.II |
Finalisation of GAD. L-Section and overall scheme before calling tenders. |
29.09.2014 |
91/W-I/Genl/0/30-Pt.II |
Closure of Meter Guage/Narrow Guage lines sanctioned for Guage Conversion. |
25.09.2014 |
2014/DW-I/Genl/Group of Infra |
Projects held up for want of wildlife and Forestry Clearances. |
24.09.2014 |
2012/W-I/Genl./Surveys/Budget |
Sanctions of Surveys |
24.09.2014 |
97/W-1/GC/NF/4 |
2nd Revised Estimate(2nd RE) for Katakhal-Bhairabi GC Project (84.15mk) |
22.09.2014 |
2013/W-I/Genl/0/30 Pt.II |
Mandatory submission of Yard lay out plans alongwith estimates. |
02.09.2014 |
2014/W-I/Genl/CAO/C Mtg. |
Review Meeting with CAO/Cs. |
28.08.2014 |
Survey Report |
Details of Surveys completed during last 10 Years. |
27.08.2014 |
2012/W-I/Genl./Surveys/Budget |
Surveys announced in Railway Budget 2014-15 |
27.08.2014 |
2012/W-I/Genl/Surveys/Budget |
Sanction of Surveys. |
25.08.2014 |
2012/W-I/Genl/Survey/Budget/ Pt.II |
PETS for Rail Connectivity to Chardham and Chardham Yatra (Gangotri, Yamnotri, Badrinath & Kedarnath via Dehradun & Karanprayag (660 Km). |
19.08.2014 |
2013/W-I/Genl/0/30 Pt.II |
Provisions of amenities for Persons with Disabilities (PwDs) in new station buildings. |
15.07.2014 |
2013/W-I/Genl/0/30 Pt.II |
Use of abbreviations in proposals sent by Railways. |
09.06.2014 |
2013/W-I/Genl/0/30 Pt.II |
Discrepancies in preparation of Estimates and use of Blanketing material. |
09.06.2014 |
2013/W-I/Genl/0/30 Pt.II |
Incurring of excess expenditure than the sanctioned amount by Railways. |
05.06.2014 |
2013/W-I/Genl./Survey |
Submission of Revised/Budget Estimates for ongoing surveys. |
22.05.2014 |
98/W-I/Genl./0/30/Pt.I |
Ballastless Track in Tunnels. |
18.03.2014 |
2012/W-1/Genl,/Surveys/Budget |
Sanction of surveys. |
27.02.2014 |
2013/WI/Genl./Survey |
Sanction of revision in length & cost of Astha-Bhopal Survey |
16.01.2014 |
2013/WI/Genl./Survey |
Change in length & cost and name of survey for new line between Pandharpur_Vijapur via Mangalvedha (20 Km)-Central Railway's Blue Book item No. 33. |
07.01.2014 |
2013
|
98/W-1/Genl/0/30 Pt.1 |
Policy on Planning for 3rd Line/4th Line. |
17.12.2013 |
2010/W-I/NL/SWR/MK |
Preparation of survey reports/estimates |
23.10.2013 |
2012/W-I/Genl/Coalfield-Rail connectivity/Pt.I |
Guidelines for diversion of forest land for non-forest purpose under Forest Conservation Act, 1980-Modification in Para 4.4 and 2.2 (iii) thereof. |
10.10.2013 |
98/W-1/Genl./0/30-Pt. 1 |
Policy relating to obtaining of clearance from the State Govt. of new survey reports - Rules of Opening of Sections. |
18.09.2013 |
2004/W-1/RVNL/10 |
Memorandum of Understanding between Railway and RVNL. |
06.09.2013 |
2013-B-106/2 |
Authorisation of funds under Demand No. 16- Assets-Acquisition, Construction and Replacement during the year 2013-14. |
04.09.2013 |
2013-B-106/1 |
Authorisation of funds under Demand No. 16- Assets-Acquisition, Construction and Replacement during the year 2013-14. |
04.09.2013 |
2013-B-106 |
Re-appropriation of funds under Demand-16- Assets- Acquisition, Construction and Replacement during the year 2013-14. |
04.09.2013 |
2012/W-I/Genl/Review of Projects (Part) 1000 Cr. |
Monitoring of Projects costing more than Rs. 1000 crore/Critical projects. |
22.08.2013 |
2005/WI/RVNL/5 |
Increase in minimum head room of minor bridges-correction slip |
30.07.2013 |
2013/W-I/Genl./Targets/2013-14 |
Railway-wise Revised Targets for NL, GC & DL Projects. |
09.07.2013 |
98/W-1/Gen/O/30.Pt.-1 |
Entering into contractual liabilities before land acquisition. |
03.07.2013 |
2013/W1/Spec. of GC/RNY-MZS |
Specification for Gauge Conversion Projects. |
01.07.2013 |
2013-B-106 |
Re-appropriation of funds |
28.06.2013 |
2013/W-1/TP/ME/3 |
Inspection note of Shri Subodh Jain, Member Engineering, Railway Board during his visit to Eastern Railway on 07.06.2013 (No. 2013/ME/Insp. Note dated 20.06.2013) |
24.06.2013 |
2013/W-1/TP/ME/2 |
Inspection note of Shri Subodh Jain, Member Engineering, Railway Board during his visit to Northeast Frontier Railway from 14.05.2013 to 15.05.2013 (No.2013/ME/Insp.Note dated 20.06.2013) |
24.06.2013 |
2013/W-1/TP/ME/1 |
Inspection note of Shri Subodh Jain, Member Engineering, Railway Board during his visit to METRO Railway on 8th June, 2013 (No.INN-01/2013 dated 14.06.2013) |
19.06.2013 |
98/W-I/Genl/0/30 Pt.I |
Gauge conversion-Blocking of MG/NG sections. |
18.06.2013 |
2013/W-1/Genl/0/30 Pt.II |
Elemination of level crossing from New Line' Gauge conversion and Doubling Projects. |
18.06.2013 |
2013/W-I/Genl./0/30 pt-II |
Elimination of Level Crossings from New Line, Gauge Conversion and Doubling Projects. |
18-6-2013 |
98/W-I/Genl/0/30/Pt. |
E-tender for works contracts. |
05.06.2013 |
2013/W-I/Genl/Survey |
Sanction of New/Updating/Traffic Surveys in compliance of Budget Pronouncements and other surveys proposed |
29.04.2013 |
2013/W-I/Genl/Budget |
Execution of Projects-Earmarking of funds. |
22.04.2013 |
2013/W-I/Genl/Survey |
Sanction of surveys. |
03.04.2013 |
Old Policy Circulars |
Old Policy Circulars |
21.03.2013 |
2012-B-106 |
Authorisation of additinal funds under Demand 16 - Assets - Acquisition, Construction and Replacement during 2012-13. |
16.02.2013 |
2011/W-1/RVNL/4 |
Memorandum of understanding between Ministry of Railways and Rail Vikas Nigam Limited. |
10.01.2013 |
2006/W-1/Genl./D.P.-Pt.1 |
Introduction of Project Management Consultancy (PMC) Services on Indian Railways. |
09.01.2013 |
2012
|
2011/W-I/Genl./EBR |
Minutes of the Meeting of Expanded Board for Railways. |
20.12.2012 |
2012-B-106 |
Re-appropriation of funds under Demand 16 - Assets - Acquisition, Construction and Replacement during the year 2012-13. |
29.11.2012 |
97/W1/Surveys/CR/Pt.III |
Survey Estimates. |
28.08.2012 |
2012-B-106 |
Re-distribution of funds under Demand 16 - Assets - Acquisition, Construction and Replacement during the year 2012-13 |
06.08.2012 |
2012-B-106 |
Re-distribution of funds under Demand 16 - Assets - Acquisition, Construction and Replacement during the year 2012-13 |
03.08.2012 |
2012/W-I/Genl./Surveys/Budget |
Sanction of surveys. |
19.07.2012 |
2010/W-1/Genl/Surveys/12-13 |
Preparation of Survey Reports |
26.06.2012 |
No.85/W-1/CT/7/Pt-1 |
Price Variation for supply of steel by contractors in Works Contracts. |
02.05.2012 |
98/W-1/Gen/O/30.Pt. |
Maintenance of new lines/doubling executed by RVNL and ensuring safety |
04.05.2012 |
Postition as on 10-01-2012 |
Position of Estimates |
11.01.2012 |
2011
|
98/W-1/Gen/O/30.Pt. |
Maintenance of new lines/doubling executed by RVNL and ensuring safety |
01.11.2011 |
85/W-I/CT/7/Pt.I |
SAIL ex works price of steel |
05.09.2011 |
85/W-I/CT/7/Pt.I |
SAIL ex works price of steel |
19.08.2011 |
2011-B-106 |
Re-appropriation of funds under Demand-16 |
02.08.2011 |
85/W-I/CT/7/Pt.I |
SAIL ex works price of steel |
15.07.2011 |
2011-B-106 |
Re-appropriation of funds 2011-12 |
11.07.2011 |
FX-II/2011/Est/1 |
Preparation of Estimates |
06.07.2011 |
2010/W-1/Genl./Surveys/12-13 |
Preparation of Survey Report |
26.06.2012 |
2011/W-1/Gen/Circulars |
Elimination of level crossings from New Lilne, Gauge conversion and Doubling Projects. |
21.06.2011 |
85/W-I/CT/7/Pt.I |
SAIL ex works price of steel |
08.06.2011 |
85/W-I/CT/7/Pt.I |
SAIL ex works price of steel |
11.05.2011 |
85/W-I/CT/7/Pt.I |
SAIL ex works price of steel |
28.04.2011 |
85/W-I/CT/7/Pt.I |
SAIL ex works price of steel |
17.03.2011 |
85/W-I/CT/7/Pt.I |
SAIL ex works price of steel |
08.02.2011 |
No.2010-B-106 |
Re-appropriation of funds for NL,GC & DL- Jan,2011 |
21.01.2011 |
No.85/W-I/CT/7/Pt.I |
SAIL ex works price of steel |
10.01.2011 |
2010
|
No.SAIL/85/W-1/CT/7/Pt-I |
SAIL ex works price of steel |
07.12.2010 |
No.SAIL/85/W-1/CT/7/Pt-I |
SAIL ex works price of steel |
23.11.2010 |
2009/W-I/Genl./Surveys/09-10 |
Revision of cost of PETS/updating of surveys. |
12.10.2010 |
2010-B-106 |
Re-appropriation of funds under Demand 16- Assets- Acquisition, Construction and Replacement during the year 2010-11
|
02.10.2010 |
2010-B-106 |
Re-appropriation of funds under Demand 16- Assets- Acquisition, Construction and Replacement during the year 2010-11
|
15.10.2010 |
2010-B-106 |
Re-appropriation of Funds |
15.10.2010 |
2009/W-I/Genl/Surveys/09-10 |
Revision of cost of PETS/updating of surveys |
12.10.2010 |
No. 2010/W-I/Genl./Surveys/10-11 |
Sanction of Surveys |
04.10.2010 |
No.SAIL/85/W-1/CT/7/Pt-I |
SAIL ex works price of steel |
07.10.2010 |
No.SAIL/85/W-1/CT/7/Pt-I |
SAIL ex works price of steel |
17.09.2010 |
No.SAIL/85/W-1/CT/7/Pt-I |
SAIL ex works price of steel |
09.08.2010 |
No.SAIL/85/W-1/CT/7/Pt-I |
SAIL ex works price of steel |
22.07.2010 |
No.2009/W-I/Genl/Surveys/09-10 |
Sanction for Surveys |
24.06.2010 |
No.SAIL/85/W-1/CT/7/Pt-I |
SAIL ex works price of steel
|
09.06.2010 |
No.SAIL/85/W-1/CT/7/Pt-I |
SAIL ex works price of steel(April-2010).
|
05.04.2010 |
No.85/W-1/CT/7/Pt-I |
SAIL ex works price of steel(Dec-09, Jan-2010, Feb-2010, Mar-2010).
|
21.04.2010 |
2007/W-1/Genl./Conference |
Minutes of CAO/Cs/PCEs/ conference held in Railway Board on 10/11.05.2010 |
01.06.2010 |
2009
|
No.85/W-I/CT/7/Pt.I
|
SAIL ex works price of steel
|
09.11.2009
|
No.85/W-I/CT/7/Pt.I
|
SAIL ex works price of steel
|
14.10.2009
|
No. 2007/W-1/Genl/Estimates-Pt.
|
Traffic facility works
|
14.09.2009
|
No.85/W-I/CT/7/Pt.I
|
SAIL ex works price of steel
|
07.09.2009
|
No. 85/W-I/CT/7/Pt.I
|
SAIL ex works price of steel
|
05.08.2009
|
No. 85/W-I/CT/7/Pt.I
|
SAIL ex works price of steel
|
23.07.2009
|
No.85/W-I/CT/7/Pt.1
|
SAIL ex works price of steel
|
04.06.2009
|
No.85/W-I/CT/7/Pt.I
|
SAIL ex works price of steel
|
11.05.2009
|
No. 85/W-I/CT/7/Pt.I
|
SAIL Ex Works Price of Steel
|
16.04.2009
|
No. 85/W-I/CT/7/Pt.1
|
SAIL ex works price of steel
|
19.03.2009
|
No.97/W-1/Survey/CR/Pt.III
|
Revised rates for Final Location Survey(FLS)
|
21.01.2009
|
91/W-i/Genl.0/30Pt.II |
Provision of passenger platforms in GC Projects. |
18.03.2009 |
97/W-1/Survey/CR/Pt.III |
Revised rates for Final Location Survey (FLS) |
21.01.2009 |
2008
|
No.98/W1/Genl/0/30-Pt.
|
Standardization of service buildings for S&T requirement.
|
13.08.2008
|
No.98/W1/Genl/0/30-Pt
|
Preparation of Estimates.
|
25.07.2008
|