Search Documents(Date Wise)   Search | Hindi | Increase Font size Increase Font size Increase Font size|
Indian Railway main logo
भारतीय रेल राष्ट्र की जीवन रेखा...
INDIAN RAILWAYS Lifeline to the Nation...
National Emblem of India
National Emblem of India
About Indian Railways
   Corporate Overview
      Railway Board Directorates
         Mechanical Engneering
            Circulars
               Mechanical (Coaching)
                  2019


 
Bookmark Mail this page Print this page
QUICK LINKS
2019

2019/MC/137/3pt

Hon’ble MR inspection of train No 12060 NZM-Kota janshatabdi exp from NZM- SNHJ on 02.11.2019

31.12.2019

2007/MC/137/8

Cases of roller bearing failures in coaching stock

20.12.2019

99/MC/165/22 vol iii

Marking TRESSPASSERS SHALL BE PROSECUTED in portion of train rake specified for divyangjan.

11.12.2019

2007/MC/137/16 Vol xi

Reduction in weight of LHB coaches.

03.12.2019

2007/MC/137/8

Cases of breakage of primary secondary coil springs and failures of secondary air springs with FIBA in LHB coaches.

28.11.2019

2019/MC/142/4

Requirement of fire safety works under bulk RSP

21.11.2019

2012/MC/165/3

Quality audit of coaching depots and workshop

18.11.2019

2017/MC/141/2 pt

Celebration of the constitution on 26th November 2019 and subsequent activities

13.11.2019

2019/MC/651/1

Non-availability of coaches in CMM

08.11.2019

2007/MC/137/2 vol (i)

19th carriage maintenance group meeting 2019

08.11.2019

2017/MC/137/1 pt II

Parliamentary assurance relating to lok sabha starred Q.No 199 dtd 15.03.17 regarding CCTV cameras in coaches.

07.11.2019

2017/MC/142/4 pt IV

Centralized tender for refurbishment of 4000 ICF type coaches.

28.10.2019

2001/MC/141/1

Provision of funds for ACWP  & QWA for 2019-20 Revised estimate and BE for 2020-21

26.09.2019

96/MC/165/22 vol. ii

Provision of pop riveted type Braille signage in all type of coaches.

25.09.2019

2017/MC/138/2

Action taken report for punctuality loss cases recorded in the period from 01.04.19 up to 31.08.19

23.09.2019

2017/MC/141/2 pt

Celebration of 150 years of Mahatma

23.09.2019

2007/MC/137/2

Video conference with creses of zonal railways on 19.09.2019 at 1500 hrs in relation to progress of bio toilet fitment on IR coaches.

18.09.2019

2019/MC/142/4

Provision of funds of MC items under bulk order RSP coaches for year

17.09.2019

2017/MC/142/4 pt

Cushioning material for seats and berths for IR coaches.

16.09.2019

2019/MC/142/4

Reversibility of LHB power cars and distribution of RSP work of transition coupling in coaches.

12.09.2019

2019/MC/142/4

Requirement of transition  coupling in coaches.

12.09.2019

2017/MC/141/2 pt

Display of national flag on the exterior wall of coaches.

12.09.2019

96/MC/165/22 vol ii pt

Accessible India conpaign

11.09.2019

2010/MC/137/8

Inspection note of Member rolling stock

04.09.2019

2019/MC/142/4

Distribution of funds for RSP works reg. Project utkrisht.

29.08.2019

2018/MC/142/4

Distribution of work of provision of fully assembled wheel set for LHB coaches with cartridge bearings and brake discs 500 nos @ Rs. 5 lacs

28.08.2018

2017/MC/137/15

Furnishing position regarding refurbishment of coaches and project utkrisht.

26.08.2019

2012/MC/165/3

Quality audit of coaching depots and workshops

19.08.2019

2016/MC/137/2 pt I

Vistadome coaches.

16.08.2019

2017/MC/137/15

Upgradation of 500 rakes project utkrisht

14.08.2018

2019/MC/142/2

Excess/Shortage position of LHB coaches

14.08.2019

2000/MC/141/8 vol.i

Fitment of vacuum toilets

13.08.2019

2019/MC/142/4

Distribution of work of split type air brake discs 1600 nos

06.08.2019

2019/MC/142/4

Distribution of work of provision of underslung water tank for 500 LHB coaches.,

 06.08.2019

2019/MC/142/4

Distribution of RSP work of retrofitment of soft side buffers with polymer element in 2000 ICF type coaches.

06.08.2019

2019/MC/142/4

Distribution of work of upgradation of coach toilets of 2500 AC coaches.

06.08.2019

2019/MC/142/4

Distribution of work of provision of fully assembled wheel set for LHB coaches with cartridge bearing and brake discs. 500 nos

06.08.2019

96/MC/165/22 vol ii pt

Accessible India campaign

06.08.2019

98/MC/137/8 vol

Advertisement on the exterior surface of EMU/MEMU/DEMU rakes

01.08.2019

2019/MC/142/4

Requirement of RSP work of provision of CBC with balanced draft gear in coaches fitted with CBC with single pack or floating plate draft gear.

31.07.2019

2018/MC/142/4

Distribution of work of provision of fully assembled wheel set for LHB coaches with cartridge bearing and brake discs-500

26.07.2019

2000/MC/141/8

Fitment of SS lavatory pan

 25.07.2019

2007/MC/137/16 vol xiv

Corrigendum committee to review schedule of LHB coaches

24.07.2019

95/MC/141/1

Quality of POH of ICF coaches from workshops

24.07.2019

2001/MC/137/1 vol V

Target in respect of Venturi type ventilation system in ICF & LHB coaches

23.07.2019

2007/MC/137/16 vol xiv

Committee to review schedule of LHB coaches.

23.07.2019

2019/MC/237/2 vol i

Video conference with CRSEs

22.07.2019

2019/MC/Misc

Updation of datas for video conferencing of CRB on 18.07.2019

17.07.2019

2016/MC/137/2 pt 1

Vistadome coaches.

12.07.2019

2015/MC/137/1 vol ii

Conditions of lHB Chair cars

05.07.2019

96/MC/141/77

Watering of coaches during summer rush

02.07.2019

2017/MC/141/2 pt

150th Birth anniversary celebration of Mahatma Gandhi

28.06.2019

2007/MC/137/2 vol i

Meeting through video conference of CWEs and CRSEs of Zonal Railways,

17.06.2019

2014/MC/141/2

CMM functionalities

14.06.2019

2019/MC/138/1

Uploading of PCDO data on MCDO portal.

13.06.2019

2018/MC/143/2

Foul smell from Bio-toilets/toilet ventilation

23.05.2019

2019/MC/142/4

Status of completion and requirement of funds for RSP works in 19-20

15.05.2019

2018/MC/142/4

Distribution of RSP work of LHB  bogies with air spring in secondary suspension for conversion of non-air spring

09.05.2019

2001/MC/137/1 vol V pt.1

Provision of venture type toilet ventilation system in LHB

08.05.2019

2017/MC/141/8 pt

Status of project swarn

30.04.2019

2017/MC/137/15

Status of project utkrisht

30.04.2019

2017/MC/142/4 pt IV

Recommendation of committee on refurbishment of ICF coaches

22.04.2019

2007/MC/202/2

Change in name of Chennai central railway station

08.04.2019

2001/MC/137/1 Vol(x)

Special drive for maintenance of pantry cars and safety thereof.

05.04.2019

2007/MC/137/4

Design & infra issues in Train Set-18 rake under development at ICF

03.04.2019

2019/MC/142/4

Status of work for provision of Fire & smoke detection system in AC coaches and Fire detection & suppression system in power card & pantry cars

02.04.2019

2001/MC/137/1 vol.(x)

Maintenance of Non-AC pantry care having flame cooking and safety therein

02.04.2019

2018/MC/142/4

Distribution of RSP work of 900 LHB bogies with air spring in secondary suspension for conversion of non -air

01.04.2019

2018/MC/651/1

Inter Railway transfer of 164 coaches

26.03.2019

MM/Gaz/2019(1)

Railway board letter No ERB-1/2019/23/15 dated 19.03.2019

22.03.2019

2018/MC/142/4

Distribution of RSP work of provision of baraille signages in coaches.

19.03.2019

2007/MC/137/16 vol.XI

Provisional para No. 38 ragarding production and maintenance of LHB coaches in Indian Railway for inclusion in C&AG’s report for year ending 2018

07.03.2019

95/MC/141/1 pt

Pattern of maintenance of tejas train on Indian Railway.

07.03.2019

1996/MC/141/77 part

Distribution of Umbrella work under plan head 53 regarding setting up of quick watering arrangement

05.03.2019

2004/MC/137/8 pt ii

Maintenance practices phonic wheel earthing device & CTRB

22.02.2019

2016/MC/137/2 pt

Conversion of ICF/GS coaches into deen dayalu coaches during MLR

22.02.2019

98/MC/137/8 vol.I

Vinyl film for IR coaches

13.02.2019

2017/MC/137/15

Coverage of Suvidha express trains under project utkrisht.

06.02.2019

2018/MC/142/4

Provision of funds against bulk order RSP for 2018-19 Final modification.

06.02.2019

2018/MC/142/4

Expediting RSP works reg. Fire Safety

04.02.2019

97/MC/137/1 vol (Xii)

Replacement of muff design CBC of M/s FTRTIL with integral shank design CBC

04.02.2019

2019/MC/137/2 Vol ii

Standard marking on LHB coaches without on board mini pantry equipment

31.01.2019

2006/MC/137/20 vol (X) & (XII)

Quality of Rubber Profile for FRP window guide.

14.01.2019

2006/MC/141/28

Dispatch of overdue IOH/POH and without bio-toilet coaches for kumbh mela 2019

10.01.2019

2018/MC/142/4 pt II

Proposal for Re-appropriation of funds of RSP works.

09.01.2019

99/MC/141/21/ pt.2

Provision of Health faucet in IT coaches

08.01.2019

2017/MC/137/16 pt

Life of brake blocks of coaches

05.01.2019

2018/EnHM/08/02

150th birth anniversary of Mahatma Gandhi – Action plan of railways

23.04.2018

2018/MC/142/4

Distribution of RSP work of provision of fire extinguishers with anti theft arrangement in 15000 non ac coaches @ Rs 15000

13.03.2018

2015/MC/137/1

Schedule of technical requirement for refurbishing model rake coaches.

19.12.2017

2017/MC/58/2

Providing dustbins in bio-toilets

18.12.2017

2000/MC/141/8

Bio-toilet coaches-flushign & ventilation

18.10.2017

 




Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 19-08-2021  

Admin Login |  Site Map  |  Contact Us  |  RTI  |  Disclaimer  |  Terms & Conditions  |  Privacy Policy  Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.