Search Documents(Date Wise)   Search | Hindi | Increase Font size Increase Font size Increase Font size|
Indian Railway main logo
भारतीय रेल राष्ट्र की जीवन रेखा...
INDIAN RAILWAYS Lifeline to the Nation...
National Emblem of India
National Emblem of India
About Indian Railways
   Corporate Overview
      Railway Board Directorates
         Mechanical Engneering
            Circulars
               Mechanical (Coaching)
                  2018


 
Bookmark Mail this page Print this page
QUICK LINKS
2018

Letter  No.

Subject

Dated

2007/M(C)/137/3

Implementation of uniform maintenance practices for all coaching stock

26.12.2018

2015/M(C)/137/1

provision of certain passenger interface items  during coach maintenance

20.12.2018

2006/M(C)/141/25

Maintenance of coaching stock during Kumbh Mela 2019

19.12.2018

2002/M(C)/137/8

Utilisation of HOG facilities in trains

14.12.2018

97/ M(C)/137/1

Monitoring of jerks in CBC fitted coaches

12.12.2018

76/M(C)/137/31

Fire and smoke detection system

11.12.2018

2015/M(C)/137/1

Improvement in 1AC coaches to Swarn Standard

07.12.2018

2017/M(C)/137/4

Maintenance schedules of train sets

27.11.2018

2018/M(C)/143/1

Failures of LHB _ICF coach springs

22.11.2018

95/M(C)/141/1

Maintenance of trains

29.10.2018

87/ M(C)/137/22

Painting scheme of ICF design coaches

08.10.2018

2009/M(C)/141/6

Accident in 12215 DEE-Bandra at Ajmer  on 26.03.2018

28.09.2018

2007/M(C)/137/16

Infotainment System in coaches

26.09.2018

87/ M(C)/202/10

Seat Numbers in 1st AC Coaches

26.09.2018

2017/M(C)/137/1

Provision of CCTV Camera in Coaches

19.09.2018

98/M(C)/137/8

Commercial Publicity Advertisement on exterior of MUTP Mumbai suburban section

13.09.2018

95/M(C)/141/1

Adequate Enroute examination Points

04.09.2018

91/M(C)/650/1

Maintenance pattern for NMG rakes

27.08.2018

2017/M(C)/137/16

Trial Specification RDSO_CG-18001 for (PAPIS) and LED destination board

31.07.2018

2014/M(C)/141/2

Numbering of coaching stock

20.07.2018

2017/M(C)/142/4

Redistribution of and reduction in scope of RSP work reg. Refurbishment of 6,000 ICF type coaches (P. B. Item No. 1241/17-18)

06.06.2018

2018/M(C)/143/2(Meeting)

Minutes of Video Conference of MRS with PCMEs of Zonal Railways held on 29.05.2018

05.06.2018

2007/ M(C) /137/16 Vol (xii)

Wheel Disc Failure in LHB Coaches

31.05.2018

2017/M(C)/142/4

Redistribution of ZRs for RSP works reg. LHB FIAT Bogies

25.05.2018

87/ M(C) /202/10 Vol (iv)

Transportation code for Deccan Odyssey luxury tourist train running on Central Railway

23.05.2018

2006/M(C)/137/20

Use of GFRE sheets in coaches

23.05.2018

97/M(C)/137/1 Vol.(xii)

Provision of CBC with transition coupling in LHB power cars.

23.05.2018

2007/ M(C) /137/16 Vol (xii)

Cases of failure of control arm of LHB coaches

22.05.2018

87/ M(C) /202/10 Vol (iii)

Approval of layout of NMR coaches SCZ-87 provided with modified seats similar to Double Decker rake type seats

15.05.2018

2017/M(C)/137/15

upgradation of trains project utkrisht

15.05.2018

2018/M(C)/142/4

Replacement of wheels with diameter less than 855 mm

11.05.2018

87/ M(C) /202/10 Vol (iv)

Allotment of Transportation codes for variant coaches CRIS

10.05.2018

2011/M(M&P)/1063/51

Painting Scheme for EMU Coaches

07.05.2018

2007/ M(C) /137/16 Vol (xii)

Cracks / Breakage of solid forged wheel disc of FIAT lR Bogie (LHB)

04.05.2018

87/ M(C) /202/10 Vol (iv)

Transportation code for Work Site Tamper (WST) VPR-02M supplied by We Matex JSC, Russia

28.04.2018

87/ M(C) /202/10 Vol (iv)

Transportation code for Utility Track Vehicle (UTV) supplied by We SAN Engineering & Locomotive , Bengalore

27.04.2018

2016/M(C)/137/2 vol.(i)

Provision of bio-vacuum toilet in Humsafar Coaches

27.04.2018

2017/M(C)/137/10

New design of rolling stock on Indian Railways

25.04.2018

2007/ M(C) /137/7 Vol (i)

Transportation code for LHB Non- AC (EOG) Second Class Chair Car with air spring at secondary suspension of LHB coach fitted with FIAT Bogie

24.04.2018

2001/ M(C)/137/1 vol (iii)

Transportation code for BG Self Generating AC-3Tier sleeper lCF designed coach fitted with Bio-Toilet & CBC and upgraded suspension system

24.04.2018

2001/ M(C)/137/1 vol (iii)

Transportation code for BG Self Generating Second Class Cum Luggage & Brake Van lCF design coach fitted Bio -T0ilet & CBC

having upgraded suspension system

23.04.2018

2018/M(C)/141/1

De-listing of Snack table & Magazine bag from passenger amenity items

20.04.2018

2007/M(C)/137/16 Vol xi

infotainment system in coaches

20.04.2018

2007/M(C)/137/16 V0l.(xli)

Setting up ‘Centre of Excellence’ for LHB air brake system at Jagadhri Workshop

19.04.2018

87/ M(C) /202/10 Vol (iv)

Allotment of transportation code for Utility Track Vehicle  manufactured  and supplied by M/s Trident Auto Components Pvt .Ltd. Kanpur

18.04.2018

87/ M(C) /202/10 Vol (iv)

Allotment of transportation code for High Output Tamping & Stabilizing machine model 09-3X Dynamic supplied by M/s Plasser India.

18.04.2018

87/ M(C) /202/10 Vol (iv)

Allotment of transportation code for Multi Purpose Tamping Machine Unimat Compact / M, manufactured by M/s Plasser India

18.04.2018

95/M(C)/l4.1/l

Rakes with Zero Missing Fittings

17.04.2018

2010/M(C)/137/5

Rail Milk Tank Vans (RMTs)

12.04.2018

2003/M(C)/141/19

Shifting of Primary Maintenance of   2501/12502 New Delhi-Guwahati Poorottar Sampark Kranti Express, 15601/15602 New Delhi-Silchar Poorottar Sampark Kranti Express and 14055/14056 Delhi-Dibrugarh Brahmputra Mail

10.04.2018

95/M(C)/137/42

Railway Board’s sanction for running express trains with LHB coaches at 130 kmph

10.04.2018

2007/M(C)/137/16 Vol. (xii)

Problem of Wheel Shelling on LHB Coaches

05.04.2018

2016/M(C)/137/15

Upgradation of trains - project utkrisht

03.04.2018

96/M(C)/165/22 Vol (ii)

Replacement of the term ”physically handicapped with Persons with Disabilities(Divyangjan) in train coaches

27.03.2018

2007/M(C)/13716 vol (Xi)

FIAT Bogies for Zonal Railways

20.03.2018

2017/M(C)/142/4

Retrofitment of CBC on ICF design coaches

16.03.2018

2018/M(C)/142/4

Distribution of RSP work of Provision of double acting AC compartment swing doors @ Rs. 70000 on 3,000 AC coaches

13.03.2018

2018/M(C)/142/4

Distribution of RSP work of. Provision of Fire detection and suppression system for 400 Power Cars @ Rs 7 lakhs

13.03.2018

2018/M(C)/142/4

Distribution of RSP work of Provision of Fire detection and suppression system for 400 Pantry Cars @ Rs 6.5 lakhs

13.03.2018

2018/M(C)/142/4

Distribution of RSP work of. Provision of Fire Extinguishers with anti theft arrangement in 15,000 non-AC coaches (2 nos  coach) @ Rs.15000

13.03.2018

2018/M(C)/142/4

Distribution of RSP work of Retrofitment of crash buffers along with anti-climber in 500 ICF design coaches @ Rs. 5 lacs per coach

13.03.2018

2018/M(C)/142/4

Distribution of RSP work of Provision of Integrated Brallie signages in 40,000 coaches @ Rs.20000

13.03.2018

2016/M(C)/137/2 vol.(ii)

Running of Tejas on Central Railway

14.03.2018

2003/M(C)/141/19

Shifting of Primary Maintenance of Kanchenjunga Express to Sealdah

07.03.2018

2006/M(C)/202/2

Provision of adequate space in Garib Rath coaches to facilitate inclusion of Bed Roll charges in fare

26.02.2018

2006/M (C) /137/13

Cast wheels for LHB and EMU motor coaches

26.02.2018

2007/M(C)/137/16

Ventilation system in lCF-Design coaches

23.02.2018

2017 M(C)/137/3

Provision of Bypass coupler in the SLRs  Power cars

15.02.2018

2007/M(C)/137/ vol.(ii)

Transportation code for MEMU coaches having 3- phase IGBT based propulsion  system and SS car body

15.02.2018

2014 M(C)/141/2

Data entry in CMM

12.02.2018

2016 M(C)/137/2

Provision of back mounted infotainment system in coaches

07.02.2018

2017 M(C)/142/4

Intimation of Pink Book Item No. of RSP works sanctioned under supplementary Demand for Grants 2017-18 under Demand No.80

06.02.2018

2017 M(C)/142/4

Distribution of work of Fully assembled wheel-set for LHB coaches with cartridge bearings and brake discs (500 nos.) @ Rs. 3.35 lacs per wheel set, sanctioned under supplementary Demand for Grants 2017-18 under Demand No.80.

31.01.2018

2016/M(C)/137/2 V01 (ii)

Curtains in Humsafar coaches

31.01.2018

2017/M(C)/142/4

Development of model rakes with enhanced amenities and aesthetics by refurbishment of all ICF coaches

18.01.2018

2016/M(C)/137/2 V01 (ii)

Provision of Automatic plug type doors (4 nos. per coach) in Humsafar and Uday train coaches

15.01.2018

2002 M(C)/137/3 V01 (ii)

Approval & transportation code of MEMU stock having 3-phase IGBT based propulsion system and SS Car body

12.01.2018

2017/M(C)/141/8

Committees for evaluation of Project Swarn

10.01.2018

2004/M(C)/137/8

Provision of camera at rolling in points

01.01.2018

 

 




Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 23-06-2021  

Admin Login |  Site Map  |  Contact Us  |  RTI  |  Disclaimer  |  Terms & Conditions  |  Privacy Policy  Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.