Search Documents(Date Wise)   Search | Hindi | Increase Font size Increase Font size Increase Font size|
Indian Railway main logo
भारतीय रेल राष्ट्र की जीवन रेखा...
INDIAN RAILWAYS Lifeline to the Nation...
National Emblem of India
National Emblem of India
About Indian Railways
   Corporate Overview
      Railway Board Directorates
         Safety
            Circulars
               Safety Circulars
                  Safety (A&R)
                     2009


 
Bookmark Mail this page Print this page
QUICK LINKS
2009

 

2009

98/Safety(A&R)/19/16

31.12.09

Provision of Second Distant Signal to enhance safety in train operation during Foggy weather.

2009/Safety(A&R)/26/4

18.12.09

Safety performance: Signal lighting & back-up power supply.

2007/Safety(A&R)/1/9

17.12.09

OM Unusual occurrence of fire in the coaches of 4001 Up Attari Special while it was on the run through Diwana railway station on Delhi – Ambala section of Delhi Division of NR at 23.53 hrs. on 18.02.2007

99/Safety(A&R)/6/1

15.12.09

Imposing penalty of removal from service or compulsory retirement for ESMs/ASMs.

15.12.09
Review of working instructions for Manned Level Crossing Gates.
15.12.09
Imposing penalty of removal from service or compulsory retirement for ESMs/ASMs
14.12.09
Amendment to GR 3.66, 3.67, 3.78 & 4.16.
08.12.09
Use of Walkie-Talkie Sets.
07.12.09
Precautions for train operation during fog.
01.01.09
Normal Aspect of Level Crossing Gates and Manning of Unmanned Level Crossing etc.
26.11.09
Improved visibility of color light signals during fog.
10.11.09
(i) Track Circuiting on ?E? routes.
(ii) Poor progress of Track Circuiting.
05.11.09
Installation of Block Proving by Axle Counter ? Policy.
28.10.09
Provision for means of isolation in sidings on gradients.
15.10.09
Reporting of potentially Hazardous Occurrences to Railway Board
14.10.09
?Blanking off? of Signals ? Backup Power Supply. Signal aspect back to original status after ?Blanking off?.
08.10.09
Shunting facility ? operational flexibility.

No.2009/Safety(A&R)/19/21

06.10.09

Rolling down of loaded BOXN wagons during shunting at Kondapalli station of Vijayawada Division on South Central Railway on 02.10.2009

06.10.09
Awarding minimum penalty for the staff held responsible in accident cases ? review thereof.
01.10.09
Working Instructions for manned Level Crossing gates non-interlocked, provided with Telephone with normal position open to road traffic.
25.09.09
(1)Blanking off? of Signals ? Backup Power Supply. (2)Signal aspect back to original status after ?Blanking off?.
10.09.09
Stabling of load without live Engine on main line at station on gradients.
10.09.09
Working of Ladder Trolleys
08.09.09
Blanking off of Signals ? back up Power Supply.
21.08.09
Authority for preparation of Accident Manual and Disaster Management Plan.
06.08.09
Exchange of all right signals between train crew and station staff on Multiple Line Station.
28.07.09
Freight Train Examination ? GDR Check.
20.07.09
Knowledge and possession of flare signals ? Substitution/Deletion/Addition/Amendment to General Rules 3.65, 3.66, 3.67, 3.78 and 4.16 ? Advance Correction Slip No.2.
23.06.09
Prohibition of use of mobile phones while on train run by Loco pilots/Guards.
18.06.09
Interlocking of Anemometers with Signals
04.06.09
Thrust on Safety at Level Crossings ? Comprehensive Instructions
02.06.09
Thrust on Safety at Level Crossings ? Comprehensive Instructions
06.05.09
Stabling of loads on Mine Line with Live engine
09.04.09
Expending works of Block Proving by Axle Counter.
30.03.09
Reporting of potentially hazardous occurrences to Railway Board.
25.03.09
Supply of CUG SIM Cards to running staff ? implementation of Board?s decision with the NFIR/PNM 52/2005 and 34/2006.
24.03.09
Provision of Intermediate Block Signal on gradients.
12.03.09
Development of ?Level Crossing Gate Control Equipment using wire/wireless data communication??Workin Instructions thereof.
29.01.09
Illuminating signals ? Replacement of fusees with electronic flashing hand signal lamps
16.01.09
Illuminating signals ? Replacement of fusees with electronic flashing hand signal lamps
09.01.09
General Rules 5.20 ? Steep gradients 1 in 200 instead of 1 in 260, clarification therefore.
 
-
 
-
 
2005/Safety(A&R)/19/16
dated 12.10.07
 
2005/Safety(A&R)/19/16
dated 30.03.06
 
2005/Safety(A&R)/19/16
dated 29.03.06
 
-
 
-
 
 
Proforma for reporting of Train Accidents
 
-
 
-
 
2005/Safety(A&R)/6/4
dated 24.02.06
 
2005/Safety(A&R)/6/3
dated 8.05.06
 
2005/Safety(A&R)/6/3
dated 3/01/06
 
2005/Safety(A&R)/6/3
dated 02.06
 
2005/Safety(A&R)/6/4
dated 02.02.06
 
-
 
-

 

-

 




Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 29-11-2012  

Admin Login |  Site Map  |  Contact Us  |  RTI  |  Disclaimer  |  Terms & Conditions  |  Privacy Policy  Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.