Search Documents(Date Wise)   Search | Hindi | Increase Font size Increase Font size Increase Font size|
Indian Railway main logo
भारतीय रेल राष्ट्र की जीवन रेखा...
INDIAN RAILWAYS Lifeline to the Nation...
National Emblem of India
National Emblem of India
About Indian Railways
   Corporate Overview
      Railway Board Directorates
         Safety
            Circulars
               Safety Circulars
                  Safety (A&R)
                     2010


 
Bookmark Mail this page Print this page
QUICK LINKS
2010

 

2010
27.12.2010
Policy on Interlocking of level crossing gates and Comprehensive guidelines on provision of Safety Devices at Level Crossing Gates.
14.12.2010
Train Operation during Fog ? Precautions ? Clarification (VTO).
06.12.2010
Publication of Gazette Notification amending Indian Railways (Open Lines) General Rules ? 1976 Amendment/Deletion/Addition/ Substitution to General Rules 3.07 (Description of Distant Signals and their Indications), 9.02 (Duties of Loco pilot and Guard when an Automatic stop signal on double line is to be passed at ?on?), 9.07 (Duties of Loco Pilot and Guard when an Automatic stop signal on single line is to be passed at ?on?).
03.12.2010
Equipments to be maintained at Traffic LC gates.
02.12.2010
Finalization of enquiries where the responsibility is fixed on staff of Foreign Railway.
26.11.2010
Generation of exception report regarding reversal of points.
24.11.2010
Communication by Guards after traversing permanent Speed restriction.
22.11.2010
Working Instructions for manned Level Crossing Gates.
19.11.2010
Provision of Approach Locking Arrangement at Interlocked Level Crossing Gates in Block Section.
16.11.2010
Review of Station working Rules.
16.11.2010
Minutes of Chief Operations managers; Conference on Safety held on 26th October, 2010
04.11.2010
Train Operation during Fog ? Precautions.
04.11.2010
Train Operation during Fog ? Precautions.
19.10.2010
Simultaneous reception and dispatch facilities ? Withholding of permission by CRS/Western Circle as prescribed under GR 3.40.
19.10.2010
Manning of Unmanned Level Crossing Gate within station limits.
18.10.2010
Rules for Working of Trains in Modified Automatic Block Singalling ? Corrigendum thereto.
01.10.2010
Modification to engine whistle code while approaching and passing through a level crossing ? SR to GR 4.50.
01.10.2010
Ordering of limited no. of ARTs/ARMEs/Cranes as per actual requirement to tackle train accidents.
01.10.2010
Provision for isolation at stations.
29.09.2010
Modification in Training of IRTS Probationers.
29.09.2010
Draft Accident Manual of Dedicated Freight Corridor Corporation of Indian Limited (DFCCIL) ? sharing of resources of ART/ARME/Cranes of IR with DFCCIL during train accidents, etc.
29.09.2010
Mobility at accident sites ? Congestion from ARTs/ARMES/Cranes.
29.09.2010
Mobility at accident sites ? Congestion from ARTs/ARMES/Cranes.
 
 
 
28.09.2010
Restoration of Traffic after Track/OHE Fit subsequent to Train Accident ? Provisions in Accident Manual
28.09.2010
Definition and Re-classification of Accidents on Indian Railways ? Amendment thereto.
28.09.2010
Dashing of Train No. 8478 Up Utkal Express with a truck at manned LC gate between Malatipatpur (MLT) and Puri (PUI) stations of Khurda Road Division on 13.05.2010.
 
 
 
27.09.2010
Rules for Working of Trains in Modified Automatic Block Singnalling-Corrigendum thereto.
 
 
 
24.09.2010
Communication at Level Crossing Gates.
24.09.2010
Working Instructions for Manned level Crossing Gates.
 
 
 
20.09.2010
Rules for Working of Trains in Modified Automatic Block Singnalling.
 
 
 
16.09.2010
Vulnerability of Level Crossings ? Sanctioning of Road under Bridges (Normal/Limited Height Subways)
 
 
 
08.09.2010
Delay in ordering and departure of ARTs/ARMEs/Cranes after train accidents.
 
 
 
26.08.2010
Sanction of normal/Limited Height Subways.
25.08.2010
Train Operation during Fog ? Precautions.
24.08.2010
Exclusive frequency for use of walkie-talkie/VHF sets by the ASMS and Drivers/Guards etc.
23.08.2010
Train Operation during Fog ? Precautions.
19.08.2010
Status of working of Anti Collision Device (ACD) on Konkan Railway.
18.08.2010
Train Accidents on Account of Failure of Railway Staff.
18.08.2010
Power to Zonal Railways to amend Unified Subsidiary Rules/Subsidiary Rules.
17.08.2010
Fog Vision Instrumentation project under TMRS.
16.08.2010
Definition and Reclassification of Accidents on Indian Railways Amendment thereto.
16.08.2010
Update position of punishment awarded in accidents Occurred during 2007-08&2008-09.
13.08.2010
Provision of GPS based fog safe devices on Electric Locos/EMUs/MEMUs.
12.08.2010
Use of FOGSAFE device during foggy weather.
11.08.2010
Blanking of Signals ? Back up Power Supply.
09.08.2010
Delay in Restoration of Traffic after Track/OHE fit subsequent to Train Accident.
04.08.2010
Suspension of Intermediate Block Signal during Foggy weather.
02.08.2010
Coordination with NDRF Battalions.
30.07.2010
Data loggers for Signalling ? Timely extraction of report.
27.07.2010
Report of Accident Inquiry ? Request under RTI Act- 2005
27.07.2010
Mock Drills on Disaster Management.
22.07.2010
Statutory Investigation and Inquiries into Railway Accidents.
19.07.2010
Provision of Double Distant Signal to enhance Safety in Train Operations during foggy weather.
19.07.2010
Statutory Investigation and Inquiries into Railway Accidents.
16.07.2010
Crossing of Trains at stations provided with one platform line.
12.07.2010
Working of Twin Single Line.
21.06.2010
Reporting of Train Accidents and unusual occurrence.
21.06.2010
BPAC Failures Analysis, Failures on movement of RDSO, TRC.
01.06.2010
Simultaneous reception and dispatch facilities ? Approved Special Instructions prescribed under GR 3.40.
01.06.2010
Simultaneous reception and dispatch facilities ? withholding of permission by CRS/Western Circle as required under GR 3.40.
01.06.2010
Manning of unmanned level crossing gates within station limits.
26.05.2010
Working of Twin Single Line.
19.05.2010
Change of Normal Position of Manned Non-interlocked (Engineering & Traffic) Gates from ?Closed to road traffic? to ?Open to road traffic.
18.05.2010
Working Instructions for Manned Non-Interlocked Level Crossing Gates Normally Closed to Road Traffic.
18.05.2010
Train operation during Fog-Dislocation in train operations and review of Safety instruction.
14.05.2010
Shunting during Reception of Trains ? under GR 5.16.
14.05.2010
Shunting during Reception of Trains ? under GR 5.16.
14.05.2010
Modification to engine whistle code while approaching and passing through a level crossing ? SR to GR 4.50
13.05.2010
BPAC failures on account of movement of RDSO?s Track Recording Car.
 
 
 
12.05.2010
Elimination of Unmanned Level Crossing Gates.
12.05.2010
1. Unmanned Level Crossing on New Lines and Gauge Conversion Works.
2. Constructions of RUBs under MPLADS fund.
07.05.2010
Provisions of Auto TOL feature in Block release circuit to reduce Block failures in SGE Block Instrument.
05.05.2010
Development of ?Level Crossing Gate Control Equipment using wire/wireless data communication? ? Result of Field Trials.
2009/Safety(Signal)/26/2 29.04.2010 Functioning of BPACs-Analysis of Failures.
22.04.2010
Use of Walkie-Talkie Sets.
10.03.2010
Rear-end collision of 2964 Dn Mewar Express between Mathura Jn. and Vrindavan Road Station with 2779 Dn Goa Express on 21.10.2009 on Mathura-Pulwal Section of Agra Division of North Central Railway.
02.03.2010
Exclusive Frequency for use of Walkie-Talkie/VHF sets by the ASMs and Drivers/Guard etc.
19.02.2010
Provision of TOLR relay in Block Release Circuit to reduce Block Failures.
17.02.2010
Rear-end collision between 2556 Gorakhdham Express and 2418 Prayagraj Express between Bhaupur and Panki station on Tundla-Kanpur section of Allahabad Division of North Central Railway on 02.01.2010.
17.02.2010
Conflicting signals or bobbing of signals.
17.02.2010
Manned Traffic Level Crossing Gates (Interlocked) ? Failure of Gate Barrier (Boom).
11.02.2010
Conflicting signals or bobbing of signals.
10.02.2010
Maintenance of Signalling Gear in Mid-Sections.
 
 
 
02.02.2010
Train operation during Fog in Automatic Signalling Sections.
28.01.2010
Replacement of fuse signal with LED based flashing hand signal lamps.
21.01.2010
Precautions for the Safety of Passengers in Rear SLR during fog.
21.01.2010
Testing of Wiring Diagrams and Interlocking circuits.
20.01.2010
Installation of Block Proving by Axle Counter ? Policy.
20.01.2010
Provision of Double Distant Signal to enhance safety in Train operation.
19.01.2010
Train operation during Fog.
18.01.2010
Train operation during Fog.
18.01.2010
Disconnection for attending failure at relay huts in Automatic Signalling Territory.
16.01.2010
Precautions for the Safety of Passengers in Rear SLR during fog.
14.01.2010
Train operation during Fog in Automatic Signalling Sections.
13.01.2010
Disconnection for attending failure at relay huts in Automatic Signalling Territory.
07.01.2010
Exchange of Private Number between SM and gateman of interlocked level crossing gate in block section.
05.01.2010
BPAC Failures.
04.01.2010
Train operation during Fog.
04.01.2010
BPAC Failures.
02.01.2010
Train operation during Fog.

 




Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 02-05-2013  

Admin Login |  Site Map  |  Contact Us  |  RTI  |  Disclaimer  |  Terms & Conditions  |  Privacy Policy  Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.