Letter No.
|
Subject
|
Date of Issue
|
Keywords
|
2023
|
2019/Stn.Dev.-I/03/06/Policy(PwDs) |
Notification of Guidelines on accessibility of Indian Railway Stations and facilities at stations for differently abled persons (Divyangjans) and passengers with reduced mobility reg. |
26.11.2023 |
|
2022/GS/Stn.Dev.-I/08/70 |
Amrit Bharat Station Scheme for Indian Railways |
27.09.2023 |
|
2022/SD-II/22/01/57 |
Sharing of approved Design and Drawings of station development projects. |
13.09.2023 |
|
2022/GS/Stn.Dev.-I/08/70 |
Preparation of Master Plans of Station Development Works |
25.08.2023 |
|
2022/CE-I/CT/6/PSS |
Constitution of TC for finalizing PSSA |
17.08.2023 |
|
2021/Stn.Dev.-I/08/18 |
Execution of station development works |
03.08.2023 |
|
2022/SD-II/22/01/51 |
Environment Management Plan (EMP) related to Re-development of Chandigarh Railway Station |
31.07.2023 |
|
2022/GS/Stn.Dev.-I/08/70 |
Execution of Amrit Bharat Station Developmenbt Scheme works : Role of Chief Engineer/Station Development |
19.07.2023 |
|
2022/Stn.Dev.-I/08/12 |
Procedure Order for release of funds for station Development Projects assigned to Rail Land Development Authority an Accountal Thereof. |
10.07.2023 |
|
RDSO/759/2022 |
General Guidelines for OHE design in Concourse area for station development projects |
12.06.2023 |
|
2023/SD-II/22/07/02 |
New Standard Signages for Railway Stations on IR |
15.05.2023 |
|
2022/Stn.Dev.-I/08/70 |
Presentations for Master Plans of Station development works |
29.04.2023 |
|
2017/CE-I/CT/9 |
Delegation of powers to divisional Railway Managers(DRMs) |
24.04.2023 |
|
2022/GS/Stn.Dev.-I/08/70 |
Amrit Bharat Station Scheme for Indian Railways: Provision of Central Foot Over Bridges (FOB)s |
19.04.2023 |
|
2022/SD-II/22/01/57 |
Implementation of BIM in station Development Projects over Indian Railways |
24.03.2023 |
|
2023/CE-I/CT/I/Policy |
Provision of different types of services/consultancies for porject implementation on Indian Railways |
15.03.2023 |
|
2022/GS/Stn.Dev.-I/08/70 |
Implementation of Amrit Bharat Station Scheme for Indian Railways |
14.03.2023 |
|
2023/GS/SD-II/22/08/04 |
History of Railway Stations on Indian Railway -reg. |
14.03.2023 |
|
2022/GS/Stn.Dev.-I/08/70 |
Amrit Bharat Station Scheme for Indian Railways: Submission of proposals to Railway Board for sanction |
13.03.2023 |
|
CBS/FOB |
RDSO standard drawings of 12m wide FOB for span 25m to 30m with composite I-Girder and tubular sections |
03.03.2023 |
|
2022/CE-I/CT/07 |
Approved list of consultants/firms for undertaking consultancy services for Detailed Project Report (DPR) Preparation work, Detail Design Consultancy (DDC) work and Project Management Services (PMS) work and (ii) List of Architectural Firms empanelled for providing Architectural Consultancy for Re-Deelopment of Railway Stations
|
20.02.2023 |
|
2022/GS/Stn.Dev.-I/08/70 |
Amrit Bharat Station Scheme for Indian Railways |
17.02.2023 |
|
2022/FX(II)/PW/3 |
Delegation of Powers to field units for construction Projects. |
08.02.2023 |
|
2023/F(X)III/10/1 |
ACS No.01 to Indian Railway Financial Code Volume-I (Second Revised Edition 2022 |
01.02.2023 |
|
2017/CE-I/WP/2018-19/1Pt. |
Necessary modalities have been incorporated in IRPSM portal-Gati Shakti and DRM priority works |
31.01.2023 |
|
2022/GS/Stn.Dev.-I/08/70 |
Amrit Bharat Station Scheme for Indian Railways |
31.01.2023 |
|
2022/GS/Stn.Dev.-I/08/70/1 |
Setting up of Gati Shakti Units in Divisions |
31.01.2023 |
|
2022/E&R/3(2)/01 |
Departmental Charges in various Works estimates - corrigendum |
12.01.2023 |
|
2022 |
2022/GS/Stn.Dev.-I/08/70 |
Amrit Bharat Station Scheme for Indina Railways - Draft terms of reference for engaging technical consultant for master planning |
31.12.2022 |
|
2022/GS/Stn.Dev.-I/08/70 |
Amrit Bharat Station Scheme for Indian Railways-draft for signages |
30.12.2022 |
|
2022/GS/Stn.Dev.-I/08/70 |
Amrit Bharat Station Scheme for Indian Railways. |
29.12.2022 |
|
2022/E&R/3(2)/1 |
D&G (renamed as Departmental) Charges in various Works estimates |
28.12.2022 |
|
2022/GS/Stn.Dev.-I/08/70 |
Invitation of tenders on IREPS pending project id |
28.12.2022 |
|
2022/GS/Stn.Dev.-I/08/70 |
Amrit Bharat Station Scheme for Indian Railways. |
26.12.2022 |
|
2022/GS/Stn.Dev.-I/08/70 |
Amrit Bharat Station Scheme for Indian Railways |
23.12.2022 |
|
2019/Stn.Dev.-I/03/06/Policy/PwDs |
Guidelines on accessibility of Indian Railway stations and facilities at stations for differently abled persons (Divyngjan) and passengers with reduced mobility |
25.11.2022 |
|
2022/SD-II/22/01/4 (Pt-I)
|
Project Management Services Tender for Station development works ensuring of availability of key personnel
|
07.11.2022
|
Instruction on PMS
|
2022/SD-II/22/08/06/Misc
|
Techno-economic Feasibility Studies for Major Upgradation/Redevelopment of Railway Stations
|
01.11.2022
|
Instructions on Major Upgradation
|
2019/SD-II/22/07/7
|
Entrustment of Station for conducting techno-economic feasibility studies for redevelopment of Railway stations.
|
31.10.2022
|
Entrustment of Udvada Rly. Stn.)
|
2017/CE-I/WP/2018-19/1Pt. |
Procedure to be followed for execution of Umbrella Works under different Plan Heads |
27.10.2022 |
|
2019/SD-II/22/07/7
|
Entrustment of Station for conducting techno-economic feasibility studies for redevelopment of Railway stations.
|
21.10.2022
|
Entrustment of Katra and Chittorgarh Rly Stn.
|
2019/SD-II/22/07/7
|
Entrustment of Station for conducting techno-economic feasibility studies for redevelopment of Railway stations.
|
20.10.2022
|
Entrustment of Nadiad Rly. Stn
|
2021/Stn.Dev.-I/08/18 |
Major Upgradation of Railway Stations on Indian Railways- Design, Inspection and audit of the projects reg; |
19.10.2022 |
|
2019/SD-II/22/07/7
|
Entrustment of Station for conducting techno-economic feasibility studies for redevelopment of Railway stations.
|
07.10.2022
|
Entrustment of Anand Rly. Stn.
|
2022/SD-II/22/1/55
|
Major Upgradation of stations under Umbrella work
|
04.10.2022
|
Instructions on Major Upgradation
|
2021/CE-II/TSC/10th /Extraordinary |
Provision of ballastless track at major/important stations and stations identified under Major Upgradation/Redeveloment |
29.09.2022 |
|
2022/SD-II/22/1/3
|
Umbrella works for Major Upgradation of Railway Stations on Indian Railways
|
20.09.2022
|
Identification of Gurugram, Jalna, Aurangabad, Bapudham Motihari and Thiruvanthapuram Rly Stns.)
|
2019/SD-II/22/7/7
|
Appointment of technical consultants for techno economic feasibility studies for redevelopment of Raiwlay Stations
|
06.09.2022
|
Entrustment of Saharanpur Rly Stn.
|
2022/SD-II/22/7/4
|
Station redevelopment program-Engagement of Centralized Training Institutes (CTIs)
|
02.09.2022
|
CTI
|
2021/SD-II/22/07/11
|
Format of Detailed Project Reports for Station Development/Redevelopment/Major Upgradation Projects
|
19.08.2022
|
DPR Format
|
2011/LMB/22/01/39
|
Major Upgradation of stations on Indian Railways
|
19.07.2022
|
(List of 247 Stations for priority )
|
2022/SD-II/22/1/3
|
Umbrella works for Major Upgradation of Railway Stations on Indian Railways
|
11.07.2022
|
Assignment of Cuttack and Ajni Rly. Stn.
|
2022/SD-II/22/1/3
|
Major Upgradation of stations on Indian Railways
|
28.06.2022
|
Transfer of work form RLDA to Railway
|
2022/SD-II/22/1/3
|
Umbrella works for Major Upgradation of Railway Stations on Indian Railways
|
06.06.2022
|
Assignment of Kashi Rly. Stn.)
|
2011/LMB/WCS/22/07/25/Pt-I
|
Statutory clearances to be examined during Master Planning of Station redevelopment Projects
|
04.06.2022
|
Statutory clearance
|
2022/Stn.Dev.-I/08/24/EPC |
Authorization for Minor modification in Request for Proposal (RFP) and Standard Engineering , Procurement and Construction (EPC) Agreement for Development/Redevelopment of Railway Station - reg. |
03.06.2022 |
|
2019/SD-II/22/07/7
|
Appointment of technical consultants for techno economic feasibility studies for redevelopment of Railway Stations
|
30.05.2022
|
Entrustment of Delhi, Hazarat Nizamuddin and Avadi Rly. Stn.)
|
2011/LMB/22/01/39
|
Major Upgradation of stations on Indian Railways
|
11.05.2022
|
Criteria for selection of stations
|
2021/Stn.Dev-I/08/18
|
Comprehensive Instructions for Umprella Work of Major Upgradation of Railway Stations on Indian Railways.
|
04.05.2022
|
Instructions for Major Upgradation
|
2011/LMB/22/01/39
|
Appointment of technical consultants by RLDA for redevelopment of Railway Stations
|
04.05.2022
|
Appointment of Technical Consultants
|
2022/SD-II/22/1/3
|
Umbrella works for Major Upgradation of Railway Stations on Indian Railways
|
22.04.2022
|
Identification of New Bhuj, Jaisalmer, Yashwantpur, Khandwa and Jodhpur Rly Stns.)
|
2022/SD-II/22/1/3
|
Umbrella works for Major Upgradation of Railway Stations on Indian Railways
|
06.04.2022
|
(Identified -New Jalpaiguri, Visakhapatnam and Indore Rly Stns. Station for Major Upgradation
|
2021/SD-II/22/07/11
|
Delegation of Powers to Zonal Railways for consultancy contracts for station development works
|
06.04.2022
|
Delegation of Powers
|
2011/LMB/22/01/39
|
Appointment of technical consultants for techno economic feasibility studies for redevelopment of Railway Stations
|
29.03.2022
|
(Techno-economic feasibility studies on 76 Rly. Stns.)
|
2021/SD-II/22/07/11
|
Model document of Request for Proposal for appointment of Technical Consultant
|
11.03.2022
|
Instruction on Technical Consultant
|
2011/LMB/22/01/39
|
Entrustment of Stations to RLDA for conducting feasibility studies
|
04.03.2022
|
Instructions on Feasibility studies
|
2022/SD-II/22/1/3
|
Umbrella works for Major Upgradation of Railway Stations on Indian Railways
|
23.02.2022
|
Assignment of Sabarmati and Bhubaneswar Rly Stns.)
|
No. 2018/LM(PA)/03/06
|
Corrigendum - Comprehensive instructions for provision of passenger amenities and user facilities at stations
|
14.02.2022
|
CORRIGENDUM - MEA
Changes in conditions of : design of Foot Over Bridge, high level platform etc.
|
2021/SD-II22/01/39
|
Station Redevelopment by RLDA
|
07.02.2022
|
Entrustment of Varanasi Cantt., Aurangabad, Jalna and Dadar Rly Stns.
|
2011/LMB/22/01/39
|
Redevelopment of Railway Stations
|
07.01.2022
|
Instruction on DPR
|
2021/SD-II/22/07/11
|
Model Document of Request for Proposal for appointment of Technical Consultant
|
11.03.2022
|
RFP-Appointment of Technical Consultant-Final
|
2021
|
2021/SD-II/22/01/39
|
Entrustment of CSMT to RLDA
|
31.12.2021
|
Entrustment of station
|
2021/SD-II/22/01/39
|
Major Upgradation of stations on Indian Railways
|
31.12.2021
|
Instruction on Major Upgradation
|
2021/SD-II22/01/39
|
Entrustment of Stations to RLDA
|
22.12.2021
|
Entrustment of Raipur, Dimapur and Kumbakunam Rly. stn.
|
2019/Stn.Dev.-I/03/06/Policy/PwDs
|
Draft Document on Guidelines on accessibility of Indian Railway Stations and facilities for differently abled persons (Divyangjan) and passengers with reduced mobility
|
22.12.2021
|
Divyangjan guidelines
Draft document uploaded for seeking suggestions and Comments for the same
|
2021/SD-II/07/9
|
Redevelopment of Railway Stations- Setting up of IRSDC
|
13.12.2021
|
Closure of IRSDC
|
2019/SD-II/22/07/07
|
Redevelopment of Stations on Indian Railway
|
10.12.2021
|
Instructions of Redevelopment of Stations
|
2021/Stn.Dev.-I/08/18
|
Umbrella work for Major Upgradation of Railway Stations on Indian Railways
|
07.12.2021
|
(Entrustment of 7 Stations)
|
-
|
RFP Document for development/redevelopment of railway stations for display
|
25.11.2021
|
Request for proposal document
|
--
|
EPC Agreement for railway stations
|
25.11.2021
|
EPC Document
|
2021/Stn.Dev.-I/08/18
|
Umbrella work for Major Upgradation of Railway Stations on Indian Railways
|
22.11.2021
|
Entrustment of 11 Stations
|
No. 2021/Stn.Dev.-I/08/24/EPC
|
RFP documents and EPC Agreement for Development/Redevelopment of Railway stations on Indian Railways
|
22.11.2021
|
RFP documents and EPC agreement-Final
|
2021/Stn.Dev.-I/08/18
|
Umbrella work for Major Upgradation of Railway Stations on Indian Railways
|
26.10.2021
|
Entrustment of 21 Stations
|
2011/LMB/22/1/39
|
Redevelopment of railway Stations- Setting up of IRSDC
|
18.10.2021
|
Closure of IRSDC
|
2021/SD-II/22/07/2
|
Station Redevelopment - Draft MCA for Discussion purposes.
|
27.08.2021
|
Draft Model Concession Agreement
|
2020
|
2019/SD-2/22/7/11/Part
|
Station Redevelopment-Broad guidelines for planning and design.
|
02.11.2020.
|
Station Redevelopment-Broad guidelines
|
2019/SD-2/22/7/11 Pt.
|
Report on Updation/Revision of Manual for Standards and specifications for Railway Stations 2009
|
03.11.2020
|
Report on Updation/Revision of Manual for Standards and specifications for Railway Stations
|
2018
|
2018/LM(PA)/03/06
|
Comprehensive Instructions for provision of Passenger Amenities and user facilities at stations
|
09.04.2018
|
Instruction - MEA
Categorisation of stations,
MEA at stations ; Recommended level of amenities ;
Desirable ameniies
|
2016
|
2014/LM(PA)/03/11/PWDs/Pt.
|
Provision of amenities at Stations for persons with disabilities
|
14.03.2016
|
Instruction - Amenities to Divyangjan
Provision of Short Term facilities based on category
|
2015
|
2012/LM(PA)/03/08/Policy
|
Grant of No Objection Certificate to local bodies State Govts for major repairs improvement of roads and footpaths at their own cost in Railway land premises
|
21.10.2015
|
NOC - local bodies/State Govts
Repair of roads in railway land premises
|
2012/LM(PA)/03/08/Policy
|
Guidelines for provision of Passenger Amenities at Railway Stations through individuals , NGOs, Trusts, Charitable Institutuions, Corporates etc.
|
20.10.2015
|
Amendment to letter No.2012/LM(PA)/03/08/Policy dated 26.09.2014
|
2014
|
2013/LM(PA)/02/272/MPLADS(Policy)
|
Passenger Amenities works under Member of Parliament Local Area Development Scheme (MPLADS).
|
14.11.2014
|
Provisioning fixing of chairs under MPLADS
|
2012/LM(PA)/03/08/Policy
|
Guidelines for provision of Passenger Amenities at Railway Stations through individuals , NGOs, Trusts, Charitable Institutuions, Corporates etc.
|
26.09.2014
|
Guidelines for provision of Amenities through NGOs etc.
--- Objective
--- Areas of activity
---- Guidelines
|
2013/LM(PA)/02/272/MPLADS(Policy)
|
Inaugral function of new works developed under MPLADS and other similar funding at Railway Stationss.
|
02.04.2014
|
Plaque for MPLAD works
|
2013
|
2013/LM(PA)/02/272/MPLADS(Policy)
|
Passenger Amenities works under Member of Parliament Local Area Development Scheme (MPLADS).
|
17.10.2013
|
MPLAD allowed works
(i) approach road
(ii) circulating area
(iii) additional toilet
(iv) Platforms
(v) Foot Over Bridge
(vi) construction of platform shelter
(vii) Drinking water
(viii) Escalator
(ix) Solar Lighting
(x) Ameniteis for physically challenged
|
2009/TG-IV/10/PA/Adarsh Stns
|
Revised instructions on Adarsh Stations
|
13.08.2013
|
Revised Guidelines - Adarsh Scheme
|
2012/LM(PA)/08/04/Policy/PwDs
|
The persons with disabilities (Equal Opportunities, Protection of Rights and Full Participation) Act, 1995 – Implementation of the provisions
|
06.06.2013
|
PwD guidelines
Guidelines for Drop-off Zone ; Parking ; Signages ; Building approach etc
|
2013/LML/2/7
|
Operation & Management of Multi-Functional Complexes (MFCs) by Commercial Department.
|
02.04.2013
|
MFC Management - Commercial
|
WKS/WS/05/FS
|
Guidelines on WSC Agenda Item no. 004/01/05 "Standardization of specification of flooring, Roofing material for platform covering in Station Premises and Standardization of specification of workshop flooring"
|
16.01.2013
|
Guidelines on WSC Agenda
|
2012/LM(PA)/03/05
|
Passenger Amenities works-Prioritization in sanction and execution of works - regt
|
29.01.2013
|
Priority for passenger amenities works
|
2012
|
2008/LML/2/13
|
Development of Multi Functional Complexes (MFCs).
|
26.07.2012
|
MFC
Duties & responsibilities of Railway, RLDA, PSUs
|
2012/LM(PA)/03/05
|
Comprehensive instructions for provision of Passenger Amenities at Stations.
|
11.09.2012
|
Instruction - MEA
Categorisation of stations
MEA at stations
Recommended level of amenities
Desirable ameniies
|
2012/LM(PA)/02/072
|
Provision of Push-cock type on water booths at Platforms.
|
15.06.2012
|
Push-cock type on water booth ,
water spillage,
|
2012/LM(PA)/03/07/Policy
|
Level of Passenger Platforms
|
06.07.2012
|
High Level platform
|
2011
|
2008/LML/2/13
|
Allotment and Operation/ Management of Multi Functional Complexes
|
04.04.2011
|
MFC Operations & Management
|
2009/TG-IV/10/SAN/14/WR
|
Toilets on Island platforms on Suburban station in Mumbai Division.
|
13.03.2012
|
Toilet on Island platform
|
No.2011/LM(PA)/08/28
|
Proposals under Plan Head - "Passenger Amenities" - reg
|
03.11.2011
|
Work proposal guidelines
|
2007
|
2006/LMB/14/51 (Patna)
|
Redevelopment of PATNA Railway Station Request for proposal for appointment of architect and technical consultant for preparation of master plan and feasibility report
|
06-Dec-2007
|
Patna - Redevelopment Report
|
94/LMB/2/175
|
Comprehensive stations for provision of Passenger Amenities at stations including Model stations
|
17-Jan-2007
|
MEA guidelines
|
2006
|
2006/LM B/14/50
|
Guidelines for developmet of station into world class station.
|
07-Nov-06
|
WCS guidelines
|
2006/LMB/2/330
|
Implementation of the Access Audit Report of New Delhi Railway Station
|
28-Sep-06
|
Audit report
|
2006/LMB/02/121
|
Height of the platform for EMU trains
|
11-Aug-06
|
Platform Height - EMU trains
|
2005
|
No.2005/LMB/2/267
|
Improvement to Circulating Area - Guidelines
|
07.12.2005
|
Guidelines - Circulating area
|
2003/ LMB/ 14/ 29
|
Provision of Passenger Amenities at Stat ions
|
03-Feb-05
|
Platform raising instructions
|
94/LMB/2/175
|
Comprehensive Instructions for provision of Passenger amenities at station including Model Stations
|
16-Jan-05
|
Amendment to letter No.94/LMB/2/175 dated 16.01.2015
|
2000/LMB/02/330
|
Provision of Inter Transfer Platform facility for physically handicapped persons at railway stations.
|
22-Dec-05
|
Inter Transfer Platform facility
|
Before 2000
|
1997/LMB/02/289
|
Provision of toilets at railway stations near SM’s office.
|
22-Jul-98
|
Provision of toilets
|
1997LMB/02/170
|
Perspective Plan for provision of passenger amenities at stations - creation of user friendly amenities at stations.
|
10-Oct-97
|
Perspective Plan for provision of passenger amenities
|
1996/LMB/02/204
|
The Persons with disabilities Act 1995 - Provision of facilities at railway stations for disabled persons.
|
13-Dec-96
|
Facilities for PwD
|
1994LMB/02/175
|
Perspective plan for provision of passenger amenities at stations.
|
18-May-95
|
plan for provision of passenger amenities
|
1993/LMB/02/01
|
Location of Platform shelters.
|
25-Oct-94
|
Platform shelter location
|
1994/LMB/02/164
|
Drinking water supply at stations.
|
20-Jun-94
|
Drinking water supply instructions
|
1993/LMB/02164
|
Use of Kota stone for flooring at stations.
|
21-Dec-93
|
Flooring instructions
|
1993/LMB/02/351
|
Extension of washable apron whenever Platforms are extended.
|
15-Dec-93
|
Washable apron instructions
|
1992/LMB/02/86
|
Passenger amenities at railway stations - provision of additional water coolers and electrification.
|
16-Oct-92
|
Water cooler
|
1990/LMB/02/265
|
Facilities for handicapped at the stations.
|
02-Jul-90
|
Facilities for PwD
|
1988/LMB/02/83
|
Passenger amenities - replies from railways to CA-iii references received by Board Members/Ministers.
|
27-Feb-90
|
CA-III instructions
|
1976/TGI/103/18/Policy
|
Provision of waiting lounges for second class ticket holding passengers.
|
10-Oct-76
|
Waiting Lounge
|
1994/LMB/2/175
|
Comprehensive instructions for provision of provision of passenger amenities at stations including Model stations
|
24-Jun-03
|
Instruction - MEA
Categorisation of stations
MEA at stations
Recommended level of amenities
Desirable ameniies
|
1967/W2AMNI/93
|
Provision of basic passenger amenities at stations.
|
28-Sep-67
|
Short Term and Long Term facilities
|
1956/W1/02/115
|
Passenger amenities at Halt stations.
|
29-Oct-56
|
Passenger Platform in Gauge Conversion projects
|