No.2009/CEDO/SR/04
|
Condonation of movement of double stack container of 2896mm (9��) high on Palanpur-Kandla Port/Mundra Port route.
|
23.1.09
|
No.2009/CEDO/SR/03
|
Condonation of movement of double stack container of 2896mm (9��) high on Palanpur-Samkhiali route.
|
23.1.09
|
No.2009/CEDO/SR/01
|
Condonation of movement of double stack container of 2896mm (9��) high on Jaipur- Pipavav route.
|
23.1.09
|
No.2009/CEDO/SR/02
|
Condonation of movement of double stack container of 2896mm (9��) high on Mundra Port / Kandla Port� Samkhiali-Palanpur route.
|
23.1.09
|
No.2009/CEDO/SR/05
|
Running of roller rakes composed of 9/18 (Modified) BRN Wagon over Northern Railway.
|
09.2.09
|
No.2009/CEDO/SR/06
|
Introduction of High Horse Power DMU with High Capacity (180 KN) Pneumatic Suspension at secondary stage on proposed section of W.Rly.
|
09.2.09
|
No.2007/CEDO/SR/23
|
Condonation of infringements for 22.9t axle load "BCNHL" wagon.
|
23.4.09
|
No.2007/CEDO/SR/07
|
Condonation of infringements of 6-axle covered wagon type BCLM.
|
24.4.09
|
No.2009/CEDO/SR/09
|
Condonation of infringements to IRSOD for DMRC coaches for movement on IR.
|
01.5.09
|
No.2009/CEDO/SR/11
|
Condonation of infringements to IRSOD of BG-4 Wheeler OHE Tower car manufactured by M/s OVIS Equipments Pvt.Ltd., Hyderabad.
|
12.6.09
|
No.2009/CEDO/SR/10
|
Condonation of infringements to IRSOD of BG-4 Wheeler OHE Tower car manufactured by M/s Phooltas Tamper Pvt.Ltd., Hyderabad.
|
12.6.09
|
No.2009/CEDO/SR/14
|
Operation of self generating coaches with LHB shell and ICF Bogie fitted with pneumatic suspension at the secondary stage on the track maintained to other than C&M-I Vol.I standards having maximum axle load 13t over various sections of N.Rly.
|
03.8.09
|
No.2009/CEDO/SR/13
|
Operation of self generating AC variants coaches with LHB shell and ICF Bogie fitted with pneumatic suspension at the secondary stage on the track maintained to other than C&M-I Vol.I standards having maximum axle load 16.25t over various sections of N. Rly.
|
03.8.09
|
No.2009/CEDO/SR/12
|
Running of self generating AC-III tier & GS coaches with LHB shell and ICF Bogie fitted with pneumatic suspension on various BG sections of S. Rly.
|
06.8.09
|
No.2009/CEDO/SR/18
|
Running of BG Ballast regulating Machine, Model PBR 400R supplied by M/s Plasser India Ltd., over entire BG routes of WC, NE & NC Rlys.
|
10.8.09
|
No.2009/CEDO/SR/25
|
Running of BG Bogie open rapid discharge coal hopper wagon type BOBRNHSM-I wagons having maximum Axle load of 22.32t (CC+6+2t) loading on nominated routes of Northern Railway.
|
21.8.09
|
No.2009/CEDO/SR/26
|
Running of BG Bogie covered auto car modified wagon type BCACM wagons having maximum Axle load of 8.28t loading on nominated routes of N. Rly.
|
21.8.09
|
No.2009/CEDO/SR/21
|
Running of 22.82t (CC+8+2) axle load BG Bogie covered Wagons type BCNM-1 over Northern Railway.
|
25.8.09
|
No.2009/CEDO/SR/22
|
Running of BCN & BCNA having axle load of 22.82t (CC+8+2) loading over N. Railway.
|
25.8.09
|
No.2009/CEDO/SR/16
|
Running of �BCNAHSM1� with axle load of 21.82t on proposed section of EC Railway.
|
25.8.09
|
No.2009/CEDO/SR/15
|
Running of �BOMN� with axle load of 16.40t on proposed section of EC Railway.
|
25.8.09
|
No.2009/CEDO/SR/17
|
Provisional operation of 08-32 C DUOMATIC, for all BG sections of NC Rly at a maximum speed of
|
26.8.09
|
No.2009/CEDO/SR/23
|
Running of BOXNLWM1 wagon with 22.32t (CC+8+2) axle load on all BG section of C. Rly.
|
26.8.09
|
No.2009/CEDO/SR/20
|
Running of BOXNHL wagon with 22.82t (CC+8+2) axle load over specified routes of WC Railway.
|
26.8.09
|
No.2009/CEDO/SR/19
|
Running of BOXNHA wagon with 22.82t (CC+8+2) axle load over specified routes of WC Rly.
|
26.8.09
|
No.2009/CEDO/SR/30
|
Running of self generating AC variants coaches (SWGSCZAC, SWGFCWAC, SWGACCW, SWGFAS, SWGFCNAS, SWGCWNAS & SWGACCN) with LHB shell and ICF Bogie fitted with pneumatic suspension at the secondary stage on the track maintained to C&M-I Vol.I standards having maximum axle load 16.25t over GZB-MGS & PWL-MTJ-BINA sections of NC Rly.
|
10.9.09
|
No.2009/CEDO/SR/31
|
Running of SWGSCZAC, SWGFCWAC, SWGACCW, SWGFAC, SWGFCNAC, SWGCWNAC, SWGACCN, SWGCBNAC, SGSLRDAC, SVPHU & SGSLR with 16.25t axle load and SGS, SWGSCN, SGSLRD, SGSRD, SSCZ, SWGCBN & SWGSCZ with 13t axle load Stainless Steel coaches with LHB Shell and ICF Bogie on N.E. Rly.
|
11.9.09
|
No.2009/CEDO/SR/28
|
Running of 22.32t (CC+6+2t) axle load Broad Gauge Bogie Wagon Type BOSTHSM-2 over Northern Railway.
|
24.9.09
|
No.2009/CEDO/SR/35
|
Running of Self Generating GS Coaches fitted with pneumatic suspension at the secondary stage on ICF bogie at a maximum speed of 105 Kmph on various sections of SECR.
|
21.10.09
|
No.2009/CEDO/SR/34
|
Condonation of infringements to IR (BG) Schedule of Dimensions Revised, 2004 for DMRC Trailer car (TC) manufactured by M/s BEML Bangalore for movement on Indian Railways.
|
21.10.09
|
No.2009/CEDO/SR/29
|
Condonation of movement of Double Stack Container of 2896 mm (9��) on Rewari-Ringas-Phulera section.
|
21.10.09
|
No.2009/CEDO/SR/45
|
Running of "BOSTHSM1" having maximum axle load of 22.32t (CC+6+2) on all BG section of South Eastern Railway.
|
23.10.09
|
No.2009/CEDO/SR/44
|
Running of "BCNAM1" having maximum axle load of 22.32t (CC+6+2) on all BG section of SE Rly.
|
23.10.09
|
No.2009/CEDO/SR/43
|
Running of "BCNM1" having maximum axle load of 22.32t (CC+6+2) on all BG section of SEC Rly.
|
23.10.09
|
No.2009/CEDO/SR/42
|
Running of "BCNM1" having maximum axle load of 22.32t (CC+6+2) on all BG section of SE Rly.
|
23.10.09
|
No.2009/CEDO/SR/41
|
Running of "BOBRNM1" having maximum axle load of 22.32t (CC+6+2)on all BG section of East Cost Rly (except K-K line and Khurda Road-Puri section).
|
23.10.09
|
No.2009/CEDO/SR/36
|
Running of BG EOG type AC3-Tier (LHB variant ) Coach, BG EOG type LHB AC Chair Car, AC 2-Tier (EOG), FAC (EOG), Pantry Car ACCB(EOG) & BG LHB AC Generator Van with a maximum axle load of 16.25t over South Eastern Railway.
|
23.10.09
|
No.2009/CEDO/SR/47
|
Running of Single/Double headed WDP-3AM Locomotive over various sections of N. Rly
|
27.10.09
|
No.2009/CEDO/SR/37
|
Running of 22.32t (CC+6+2t) axle load BCNAM-1 over N.Rly.
|
04.11.09
|
No.2009/CEDO/SR/27
|
Running of BOBYN wagon with 22.32t (CC+6+2t) axle load over entire BG routes of WC Rly (except Guna-Gwalior section).
|
04.11.09
|
No.2009/CEDO/SR/38
|
Running of 22.32t (CC+6+2t) BCNM-1 over N. Rly.
|
04.11.09
|
No.2009/CEDO/SR/33
|
Running of BCNAHSM1 (CC+6+2t) with a maximum axle load of 22.32t over all BG routes of SE Rly .
|
04.11.09
|
No.2209/CEDO/SR/50
|
Running of �BOST� (CC+6+2t) having maximum load of 22.32t over N. Rly.
|
12.11.09
|
No.2009/CEDO/SR/49
|
Running of �BOXNM1� (CC+8+2t) having maximum axle load of 22.82t on MGS-GZB, PWL-BINA, MKP-NYN, CNB-BZM-KID-MKP section of NC Rly and over identified routes of WC Rly.
|
13.11.09
|
No.2009/CEDO/SR/54
|
Running of �BCNAHSM1� (CC+6+2t) having maximum axle load of 22.32t on all sections of NC Rly and WC Rly (except Guna-Gwalior section).
|
13.11.09
|
No.2009/CEDO/SR/52
|
Running of �BOXNHSM1� (CC+6+2t) having maximum axle load of 22.32t over entire BG routes of WC Rly (except Guna-Gwalior section).
|
13.11.09
|
No.2009/CEDO/SR/53
|
Running of �BOXNM1� (CC+8+2t) having maximum axle load of 22.82t on MGS-GZB, PWL-BINA,MKP-NYN, CNB-BZM-KID-MKP section of NC Rly.
(Corrigendum - The nomenclusere of wagon "BOXNM1) may now be read as "BOXN" - Dated 27.01.2011)
|
13.11.09
27.01.2011
|
No.2009/CEDO/SR/40
|
Running of "BCNAHSM1" having maximum axle load of 22.32t (CC+6+2t) on all BG section of NW Rly.
|
17.11.09
|
No.2009/CEDO/SR/51
|
Running of "BCNHL" wagon (CC+8+2t) having maximum axle load of 22.82t over identified routes of WC Rly.
|
27.11.09
|
No.2009/CEDO/SR/48
|
Running of �BOXNHL� having maximum axle load of 22.9t on MGS-GZB, PWL-BINA, MKP-NYN, CNB-BZM-KID-MKP (CC+8+2t) section of NC Rly.
|
02.12.09
|
No.2009/CEDO/SR/46
|
Running of "BOBRM1" having maximum axle load of 22.32t (CC+6+2) on all BG section of East Cost Railway (except K-K line and Khurda Road-Puri section).
|
02.12.09
|