Search Documents(Date Wise)   Search | Hindi | Increase Font size Increase Font size Increase Font size|
Indian Railway main logo
भारतीय रेल राष्ट्र की जीवन रेखा...
INDIAN RAILWAYS Lifeline to the Nation...
National Emblem of India
National Emblem of India
About Indian Railways
   Corporate Overview
      Railway Board Directorates
         Traffic Commercial
            Freight Rate Circulars
               2015


 
2015

FREIGHT RATE CIRCULARS - 2015

Rate Ins. No. Letter No. Subject Issued Date Ref. Supersedes Superseded by Validity
From To
Corrigendum No 28 to Rates circular No. 08 of 2015 TCR/1078/2015/07/3340125 Adjustment in Base Freight Rates-Classification of Commodities-Red Mud. 29.09.2022 Corri no. 27 to R.C.No.08 of 2015 dated 28.09.2021     01.10.2022 30.09.2023
Corrigendum-5 to RC-29 of 2012 TCR/1078/2015/15 Levy of Service Tax on Transportation of Goods by Rail. (Swacch Bharat Cess) 12.11.2015 RC-29 of 2012 and Corrigenda thereto - - 15.11.2015 TFA
Corrigendum-1 to Rates Master Circular / PCC /
 2015 / 0
TCR/1394/2014/2 Permissible Carrying Capacity (PCC) of wagons 30.10.2015 Rates Master Circular / PCC / 2015 / 0 - - - -
Corrigendum No. 5 to Rates Master Circular /  Provision of Weighbridge / 2014 / 0 TC-I/2005/108/3 Pt.III Rates Master Circular on Provision , installation and functioning of weighbridges  30.10.2015 Rates Master Circular / Provision of Weighbridge / 2014 / 0 - - 01.11.2015 31.03.2017
RC-27 TCR/2201/2015/01 Hire charges for Wagons interchanged – Revision of. 29.10.2015 - - RC-04/2016 16.11.2015 TFA
Corrigendum-10 to RC-08 of 2015 TCR/1078/2015/07 Adjustment in Base Freight Rates effective from 01.04.2015. 26.10.2015 RC-08 of 2015 and Corrigenda thereto  - - 01.11.2015 31.10.2016
Rates Master Circular / PCC / 2015 / 0 TCR/1394/2014/2 Permissible Carrying Capacity (PCC) of wagon 19.10.2015       19.10.2015 TFA
Addendum-2 to Rates Master Circular /Weighment/2014/0 TC-I/2012/108/20 Weighment of wagons / rake, exemption from weighment, procedure to deal with overloaded wagon(s) and levy of Detention Charge etc 29.09.2015 Rates Master Circular / Weighment / 2014 / 0  - - 01.10.2015 TFA
Corrigendum -2 to  Rates Master Circular / FIS / 2015 / 0 TCR/1078/2014/02 Freight Incentive Scheme 24.09.2015 Rates Master Circular / FIS / 2015 / 0 - - 30.09.2015 TFA
RC-26 TCR/1644/2014/03 Rebate in freight transported in privately owned wagons 24.09.2015 RC-60 of 2009RC-15 of 2010RC-23 of 2013RC-25 of 2013RC-26 of 2013RC-27 of 2013RC-28 of 2013 and Corrigenda thereto & RC-31 of 2014 and Corrigenda thereto - - 01.10.2015 30.09.2017
Addendum to RC-18 of 2011 TCR/1017/2011/01 Grant of Train Load benefit to POL rakes partly loaded for Railways fuelling installation and partly for Oil Depot. 23.09.2015 RC-18 of 2011 - - 28.09.2015 -
Corrigendum-3 to Rates Master Circular / Block Rakes / Mini Rakes / Two Point Combinations  etc./2015/0 TCR/1017/2015/1 Transportation Products-Block Rakes / Mini Rakes / Two Point Combinations  etc./2015/0 23.09.2015 Rates Master Circular / Block Rakes / Mini Rakes / Two Point Combinations  etc./2015/0 - - 28.09.2015 TFA
Corrigendum-2 to Rates Master Circular / Block Rakes / Mini Rakes / Two Point Combinations  etc./2015/0 TCR/1017/2015/1 Transportation Products-Block Rakes / Mini Rakes / Two Point Combinations  etc./2015/0 18.09.2015 Rates Master Circular / Block Rakes / Mini Rakes / Two Point Combinations  etc./2015/0 - - 28.09.2015 TFA
Addendum-16 to RC-36 of 2009 TCR/1078/2015/24 Classification of Iron Ore 01.09.2015 RC-36 and Addenda thereto Addendum 15 to RC-36 of 2009 - 08.09.2015 31.03.2016
RC-25 TC-I/2014/201/9 Free time for loading / unloading of BCFC wagons. 21.08.2015 RC-15 of 2015 RC-15 of 2015   01.09.2015 TFA
RC-24 TC-I/2015/223/1 Notified Stations 21.08.2015

RC-04 of 2015 and

Addendum-1 thereto 

- - 25.08.2015 24.02.2016
Addendum to RC 24 of 2015 TC-I/2015/223/1 Notified Stations 02.09.2015 RC-24 of 2015 - - 25.08.2015 24.02.2016
Corrigendum to Rates Master Circular / Block Rakes / Mini Rakes / Two Point Combinations  etc./2015/0 TCR/1017/2015/1 Transportation Products-Block Rakes / Mini Rakes / Two Point Combinations  etc./2015/0 12.08.2015 Rates Master Circular / Block Rakes / Mini Rakes / Two Point Combinations  etc./2015/0 - - 20.08.2015 19.02.2016
Addendum to Rates Master Circular / E-payment / 2014 /1 TC-I/2014/104/1 e-payment 30.07.2015 - - - - -
Rates Master Circular / Dynamic Pricing Policy / 2015/ 0 TCR/1078/2015/14

Dynamic Pricing Policy - Levy of Busy Season Charge, Development Surcharge and Congestion Charge

20.07.2015 - - - - -
Addendum to Rates Master Circular /Weighment/2014/0 TC-1/2006/109/6 Pt.II Weighment of wagons / rake, exemption from weighment, procedure to deal with overloaded wagon(s) and levy of Detention Charge etc 17.07.2015 Rates Master Circular / Weighment / 2014 / 0  - -  Date of Gazette Notification TFA
Corrigendum-1  to RC-27 of 2014 TC-I/2012/214/2 Pt.2 Service Tax Certificate for transportation of goods by rail (STTG Certificate) 15.07.2015 RC-27 of 2014 - - - TFA
Rates Master Circular / E-payment / 2014 / 1 TC-I/2014/104/1 e-payment 10.07.2015 - - - - -
Corrigendum No.2 to RC-23 of 2015  TCR/1078/2008/11 Pt. Levy of Congestion Surcharge for traffic booked to Bangladesh 30.03.2017 Corrigendum to RC 23 of 2015 dated 10.01.2017 - - 01.04.2017 31.03.2018
Corrigendum to RC-23 of 2015  TCR/1078/2008/11 Levy of Congestion Surcharge for traffic booked to Bangladesh 10.01.2017 Corrigendum to RC 23 of 2015 dated 10.01.2017     12.01.2017 31.03.2017
RC-23 TCR/1078/2007/22 Dumps on NFR and ER for transportation of consignments to Bangladesh and Levy of Congestion Charge. 09.07.2015

RC-105 of 2007 and Addenda-1,  2  & 3 thereto  and RC-05 of 2010 and Addenda-1,   2  &  3 thereto and  RC-11 of 2013

- - 19.07.2015 18.07.2016
Corrigendum No.03 to RC-23 of 2015 TCR/1078/2008/11 Pt. Levy of Congestion Surcharge for traffic booked to Bangladesh 13.02.2018       01.04.2018 31.03.2019
Corrigendum No. 04 to RC -23 of 2015  TCR/1078/2008/11 Pt. Levy of Congestion Surcharge for traffic booked to Bangladesh 05.03.2019          
Corrigendum-9 to RC-08 of 2015 TCR/1078/2015/07 Adjustments in Base Freight rates effective from 01.04.2015. 09.07.2015 RC-08 of 2015 and Corrigendum thereto - - 08.07.2015 TFA
Corrigendum-8 to RC-08 of 2015 TCR/1078/2015/07 Adjustment in Base Freight Rates effective from 01.04.2015 0707.2015 RC-08 of 2015 and Corrigendum thereto  - - 15.07.2015 TFA
Corrigendum-4 to Rates Master Circular / PCC / 2014 / 0 TCR/1394/2009/03 Permissible Carrying Capacity 03.07.2015 Rates Master Circular/PCC/2014/0 - - 10.07.2015 TFA
Corrigendum-7 to RC-08 of 2015 TCR/1078/2015/07 Adjustment in Base Freight Rates effective from 01.04.2015 01.07.2015 RC-08 of 2015 and Corrigendum thereto  - - 01.07.2015 TFA
Corrigendum -1 to  Rates Master Circular / FIS / 2015 / 0 TCR/1078/2014/02 Freight Incentive Schemes 26.06.2015 Rates Master Circular / FIS / 2015 / 0 - - - -
RC-22 TCR/1078/2014/02 Freight Incentive Schemes. 24.06.2015

Rates Master Circular / FIS / 2014/0 dated 13.06.2014,

RC-25 of 2014 dated 13.08.2014,

Rates Master Circular/ Block Rakes/ Mini Rakes/ Two Point Combinations  etc./2015/0 dated 05.06.2015

and

Rates Master Circular / FIS / 2015 / 0 dated 16.06.2015

Rates Master Circular / FIS / 2014/0 dated 13.06.2014  and

RC-25 of 2014
- 24.06.2015 TFA
RC-21

Attachment
TCR/1147/2015/01 Transportation of Relief material by Rail. 18.06.2015 M/o Home Affairs, Disaster Management Division L.No. 32-7/2014-NDM-1 dated 080415 - - - TFA
Corrigendum to Rates Master Circular / CRT-CCR-Hub&Spoke / 2015/ 0 TC-I/2014/302/2  CRT-CCR-Hub&Spoke system of charging 16.06.2015 Rates Master Circular / CRT-CCR-Hub&Spoke / 2015/ 0 - - 22.06.2015 31.03.2016
Rates Master Circular / FIS / 2015 / 0 TCR/1078/2014/02 Freight Incentive Schemes 16.06.2015 Rates Master Circular / FIS / 2014 / 0 & Corrigendum -1 thereto & RC25 of 2014 -   25.06.2015 TFA
Corrigendum-6 to RC-08 of 2015 TCR/1078/2015/07 Adjustments in Base Freight Rates effective from 01.04.2015. 16.06.2015 RC-08 of 2015 and Corrigenda thereto - - 16.06.2015 TFA
Rates Master Circular / Block Rakes / Mini Rakes / Two Point Combinations  etc./2015/0 TCR/1017/2015/1 Transportation Products : Block Rakes / Mini Rakes / Two Point Combinations  etc. 05.06.2015   - - - -
Corrigendum-4 to RC-29 of 2012 TC-I/12012/215/1 Pt. Refund of Service Tax portion on waived amount of Demurrage / Wharfage. 03.06.2015 RC-29 of 2012 and Para 3.4 (iii) of RBA No. 35 of 2012 dated 01.10.2012 - - - TFA
RC-20 TC-I/2002/214/5 All India Engine Hour Cost (AIEHC) for recovery of Siding and Shunting Charges. 01.06.2015 RC-19 of 2014 RC-19 of 2014 RC-18 of 2016 01.07.2015 TFA
Corrigendum-3 to RC-29 of 2012 TCR/1078/ Levy of Service Tax on transportation of goods by Rail. 27.05.2015

RC-29 of 2012

and Corrigenda theretoRC-27 of 2014 & L.No’s. TCR/1078/2011/2 dt. 05.10.2012 & 08.10.2012; TCR/1078/2012/24 dt. 24.03.2013 and

TC-I/2012/214/2 dt. 14.11.2014
- - 01.06.2015 TFA
Corrigendum-5 of RC_08 of 2015 TCR/1078/2015/07 Adjustments in Base Freight rates effective from 01.04.2015 22.05.2015 RC-08 of 2015 and Corrigenda thereto - - -  
Addendum-3 to RC-05 of 2010 TCR/1078/2007/22 Opening of dump on NFR and ER for transportation of Consignments to Bangladesh. 19.05.2015

RC-05 of 2010

and

Addenda

   thereto

- - 20.05.2015 18.07.2015
Addendum-3 to RC-105 of 2007  TCR/1078/2007/22 Opening of dump on NFR and ER for transportation of Consignments to Bangladesh. 19.05.2015

RC-105 of 2007 and Addenda thereto

- - 20.05.2015 18.07.2015
RC-19 TCR/1015/2015/01 Rates for Automobile Traffic carried on NMG / BCCNR and BCACM wagons. 19.05.2015

RC No’s. 04 & RC-24 of 2010 and RC No’s. 03, 16, 29 & 37 of 2011

RC No’s. 04 & RC-24 of 2010 and RC No’s. 03, 16, 29 & 37 of 2011

- 01.06.2015 31.05.2016
RC-18 TC-I/2014/201/14 Free time for loading / unloading of flat rake in the case of freight terminals / sidings / goods sheds / steel plants on Engine-on-load. 14.05.2015

RC-23 of 2012

- - 14.05.2015 TFA
Corrigendum-3 to RC-31 of 2014 TCR/1644/2014/03 Rebate in Freight for traffic transported in privately owned wagons. 14.05.2015

RC-31 of 2014 

and
Corrigenda  thereto 

- - - TFA
RC-17 TCR/1078/2014/22 Revision in Rule No. 223 of Indian Railway Code for Traffic (Commercial) Department, 1993. 12.05.2015 Indian Railway Code for Traffic  (Commercial) Department, 1993 - - 12.05.2015 TFA
Advance Correction Slip No. 23 to Indian Railway Code for Traffic (Commercial) Department, 1993  - Revision in Rule No. 223 of Indian Railway Code for Traffic (Commercial) Department, 1993 12.05.2015 - - - - -
RC-16 TCR/1099/2012/1 Inflation in distance for charging freight on Banspani - Tomka BG section on East Coast Railway and South Eastern Railway. 05.05.2015 RC-14 of 2007, RC-06 and RC-14 of 2012       - - 01.06.2015 31.05.2018
Addendum to RC-08 of 2015 TCR/1078/2015/07 Procedure for inclusion of new commodity in Goods Tariff. 30.04.2015 IRCA Goods Tariff No. 48, Part-I (Vol-II)  2015/TC(CR)/204/4 Pt. dated 21.04.2015 - 30.04.2015 TFA
Corrigendum-4 to RC-08 of 2015 TCR/1078/2015/07 Adjustments in Base Freight rates effective from 01.04.2015. 30.04.2015 RC-08 of 2015 and Corrigenda thereto - - 30.04.2015 TFA

RC-15

TC-I/2014/201/9 Free time for loading / unloading of BCFC wagons. 29.04.2015 RC-03 of 2015 - RC-25 of 2015 13.05.2015 TFA
Corrigendum-1 to RC-41 of 2014 2007/TC-I/302/1 Pt.H Haulage Charge for movement of containers in privately owned wagons. 27.04.2015 RC-41 of 2014 - - 10.05.2015 TFA
Corrigendum-3 to RC-08 of 2015 TCR/1078/2015/07 Adjustments in Base Freight rates effective from 01.04.2015. 10.04.2015 RC-08 of 2015 and Corrigendum thereto - - - TFA
Corrigendum-2 to RC-08 of 2015 TCR/1078/5/07 Adjustments in Base Freight Rates effective from 01.04.2015. 06.04.2015 RC-08 of 2015 and Corrigendum thereto  - - - TFA
Corrigendum-2 to RC-29 of 2012 TCR/1078/2011/2 Levy of Service Tax on Transportation of Goods by Rail. 31.03.2015 RC-29 of 2012 Corrigendum thereto      01.04.2015  
RC-14 TCR/2201/2004/1 Revision of rates of Miscellaneous charges. 31.03.2015 RC-10 of 2014 RC-10 of 2014 - 01.04.2015 31.03.2016
RC-13 99/TC-I/101/2 Wagon Registration Fee (WRF). 30.03.2015 RC-07 of 2006 - - 01.04.2015 TFA
RC-12 TCR/1055/95/1 Revision of Charges payable to Tuticorin Port Trust Railway. 26.03.2015 RC-09 of 2014 RC-09 of 2014 - W.e.f. the date of publication in official Gazette TFA
RC-11 TCR/1055/95/1 Revision of rates on Port Trust Railway. 26.03.2015 RC-08 of 2014 RC-08 of 2014 - W.e.f. Suitable date after proper notice to Public & other Railways TFA
RC-10 TCR/1055/95/1 Revision of Haulage charges payable to Port Trusts. 26.03.2015 RC-07 of 2014 RC-07 of 2014 - 01.04.2015 TFA
Corrigendum-2 to RC-36 of 2009 TCR/1078/2007/03 Pt.B Classification of Iron Ore. 25.03.2015 RC-36 of 2009 & Corrigendum and Addenda thereto, RC-17 of 2014  and  RC-08 of 2015 & Corrigendum thereto - - 01.04.2015 TFA
Corrigendum-9 to RC-05 of 2011 2007/TC-I/ 302/1 Pt.H Haulage Charge recoverable for movement of notified commodity groups in container. 24.03.2015 Corrigendum-6 to RC-05 of 2011 - - 01.04.2015 TFA
Corrigendum to RC-08 of 2015 TCR/1078/2015/07 Adjustments in Base Freight rates effective from 01.04.2015. 20.03.2015 - - - 01.04.2015 TFA
RC-09 TC-I/2006/109/6 Pt.3 Exemption from Mandatory (100%) weighment in case of containerized Import traffic 20.03.2015 RC-16 of 2013& RC-39 of 2014 - - 24.03.2015 23.03.2016

RC-08

 

Addendum to RC-08 of 2015

IRCA Goods Tariff No. 48, Part-1(Vol.II) wef 01.04.2015

 

TCR/1078/2015/07 Adjustments in Base Freight rates effective from 01.04.2015. 16.03.2015 - - - 01.04.2015 TFA
Corrigendum No.1      20.03.2015          
Corrigendum-2     06.04.2015          

Corrigendum-3

 

   -do-    -do-

 10.04.2015

 

 

- - -   - TFA
Corrigendum-4 -do- -do- 30.04.2015          
Corrigendum-5  -do- -do- 22.05.2015          
Corrigendum-6  -do- -do- 16.06.2015 - - - 16.06.2015 TFA
Corrigendum-7 -do- -do- 01.07.2015 - - - 01.07.2015 TFA
Corrigendum-8  -do- -do- 07.07.2015 - - - 15.07.2015 TFA
Corrigendum-9  -do- -do- 08.07.2015 - - - 08.07.2015 TFA
Corrigendum-10  -do- -do- 26.10.2015 - - - 01.11.2015 31.10.2016
Corrigendum-11 -do- -do- 25.04.2016 - - - 01.05.2016 TFA
Corrigendum-12 -do- -do- 20.05.2016 - - - - -
Corrigendum-13 -do- -do- 31.05.2016 - - - 06.06.2016 31.03.2017
Corrigendum - 14 -do- -do- 22.08.2016 - - - 22.08.2016 -
rrigendum No. 15 -do- -do- 24.08.2016 - - - 24.08.2016 -
Corrigendum No. 16 -do- -do- 09.11.2016 - - - 15.11.2016 TFA
Corrigendum No. 17 -do- -do- 17.11.2016 - - - 24.11.2016 TFA
Corrigendum No. 18 -do- -do- 07.03.2017 - - - 09.03.2017 TFA
Corrigendum No. 19  -do- -do- 30.03.2017 - - - 01.04.2017 31.03.2018
Corrigendum No. 20 -do- -do- 06.07.2017 - - - 10.07.2017 TFA
Corrigendum N0. 21 -do- -do- 24.07.2017 - - - 26.07.2017 30.06.2018
Corrigendum No. 22 -do- -do- 27.02.2018 - - - 01.04.2018 31.03.2019
Corrigendum No.23 -do- -do- 26.03.2019 - - - 01.04.2019 30.09.2019
Corrigendum No. 24 -do- -do- 30.09.2019 - - - 01.10.2019 31.03.2020
 Corrigendum No. 25  -do- -do- 21.04.2020          
Corrigendum No. 26 to Rates Circular No.8 of 2015  -do- Adjustment in Base Freight Rates- Classification of Commodities. 02.03.3021       01.04.2021  31.03.2022
Corrigendum No.27 to Rates Circular No.08 of 2015 -do-              
RC-07 TCR/1543/2009/1 Rates of Terminal Charges to be collected by Port Trust Railways from customers. 13.03.2015 RC-88 of 2007 & RC-04 of 2013 - - 01.04.2015 31.03.2017
RC-06 2007/TC-I/302/1 Pt.B Operation of container trains by Private Container Operator (PCO) in Railway owned terminals. 12.03.2015 RC-06 of 2014 and RC-38 of 2014 - - 01.04.2015 31.03.2016

RC-05

Corrigendum No. 02 to Rates Circular No.5 of 2015 dt. 24.02.2022

Corrigendum No. 01 to Rates Circular No. 5 of 2015

TCR/1394/2012/02

Permissible Carrying Capacity of BLLA, BLCA, BLLB, BLCB, BFKN, BLCAM and BLCBM wagons for movement of Container Traffic.

26.02.2015 RC-42 of 2014 RC-42 of 2014 - 02.03.2015 TFA

RC-04

Addendum 1 

TC-1/2001/223/1Pt.C

 

Notified Stations

 

20.02.2015

 

- - - - -
RC-03 TC-I/2014/201/9 Free time for loading / unloading of BCFC wagons. 12.02.2015 RC-23 of 2014 - - 13.02.2015 12.05.2015

RC-02

TC-I/2014/103/2

 

 

Corrigendum to Rates Circvular No.02 of 2015 

TC-I/2014/103/2

 

 

 

TC-I/2014/103/2 Pt.II

dt. 26.04.2019

Electronic Transmission of Railways Receipt (e-TRR)

 

Electronic 
Transmission of Railway Receipt(eT-RR)- inclusion of Container Traffic



 

28.01.2015

 

 

 

 

 

 

 

- - - 30.01.2015 as Pilot Project for POL traffic originating from HPCL/  LONI/ CR  TFA
Addendum
dated 13.03.2018
TC-I/2014/103/2 Electronic Transmission of Railways Receipt (e-TRR) 13.03.2018 - - - - -
Addendum No. 2  TC-I/2014/103/2 Pt.II Pan India implementation of Electronic Transmission of Railway Receipt (eT-RR) 04.07.2019          
RC-01 TCR/1394/2015/01 Running of freight trains on 25 T Axle Load routes. 16.01.2015 RMC/PCC/2014/0 dated 09.07.2014 - - 22.01.2015 TFA

 

 




Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 29-09-2022  

Admin Login |  Site Map  |  Contact Us  |  RTI  |  Disclaimer  |  Terms & Conditions  |  Privacy Policy  Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.