Rate Ins. No. |
Letter No. |
Subject |
Issued Date |
Ref. |
Supersedes |
Superseded by |
Validity |
From |
To |
Corrigendum No 28 to Rates circular No. 08 of 2015 |
TCR/1078/2015/07/3340125 |
Adjustment in Base Freight Rates-Classification of Commodities-Red Mud. |
29.09.2022 |
Corri no. 27 to R.C.No.08 of 2015 dated 28.09.2021 |
|
|
01.10.2022 |
30.09.2023 |
Corrigendum-5 to RC-29 of 2012 |
TCR/1078/2015/15 |
Levy of Service Tax on Transportation of Goods by Rail. (Swacch Bharat Cess) |
12.11.2015 |
RC-29 of 2012 and Corrigenda thereto |
- |
- |
15.11.2015 |
TFA |
Corrigendum-1 to Rates Master Circular / PCC /
2015 / 0 |
TCR/1394/2014/2 |
Permissible Carrying Capacity (PCC) of wagons |
30.10.2015 |
Rates Master Circular / PCC / 2015 / 0 |
- |
- |
- |
- |
Corrigendum No. 5 to Rates Master Circular / Provision of Weighbridge / 2014 / 0 |
TC-I/2005/108/3 Pt.III |
Rates Master Circular on Provision , installation and functioning of weighbridges |
30.10.2015 |
Rates Master Circular / Provision of Weighbridge / 2014 / 0 |
- |
- |
01.11.2015 |
31.03.2017 |
RC-27 |
TCR/2201/2015/01 |
Hire charges for Wagons interchanged – Revision of. |
29.10.2015 |
- |
- |
RC-04/2016 |
16.11.2015 |
TFA |
Corrigendum-10 to RC-08 of 2015 |
TCR/1078/2015/07 |
Adjustment in Base Freight Rates effective from 01.04.2015. |
26.10.2015 |
RC-08 of 2015 and Corrigenda thereto |
- |
- |
01.11.2015 |
31.10.2016 |
Rates Master Circular / PCC / 2015 / 0 |
TCR/1394/2014/2 |
Permissible Carrying Capacity (PCC) of wagon |
19.10.2015 |
|
|
|
19.10.2015 |
TFA |
Addendum-2 to Rates Master Circular /Weighment/2014/0 |
TC-I/2012/108/20 |
Weighment of wagons / rake, exemption from weighment, procedure to deal with overloaded wagon(s) and levy of Detention Charge etc |
29.09.2015 |
Rates Master Circular / Weighment / 2014 / 0 |
- |
- |
01.10.2015 |
TFA |
Corrigendum -2 to Rates Master Circular / FIS / 2015 / 0 |
TCR/1078/2014/02 |
Freight Incentive Scheme |
24.09.2015 |
Rates Master Circular / FIS / 2015 / 0 |
- |
- |
30.09.2015 |
TFA |
RC-26 |
TCR/1644/2014/03 |
Rebate in freight transported in privately owned wagons |
24.09.2015 |
RC-60 of 2009, RC-15 of 2010, RC-23 of 2013, RC-25 of 2013, RC-26 of 2013, RC-27 of 2013, RC-28 of 2013 and Corrigenda thereto & RC-31 of 2014 and Corrigenda thereto |
- |
- |
01.10.2015 |
30.09.2017 |
Addendum to RC-18 of 2011 |
TCR/1017/2011/01 |
Grant of Train Load benefit to POL rakes partly loaded for Railways fuelling installation and partly for Oil Depot. |
23.09.2015 |
RC-18 of 2011 |
- |
- |
28.09.2015 |
- |
Corrigendum-3 to Rates Master Circular / Block Rakes / Mini Rakes / Two Point Combinations etc./2015/0 |
TCR/1017/2015/1 |
Transportation Products-Block Rakes / Mini Rakes / Two Point Combinations etc./2015/0 |
23.09.2015 |
Rates Master Circular / Block Rakes / Mini Rakes / Two Point Combinations etc./2015/0 |
- |
- |
28.09.2015 |
TFA |
Corrigendum-2 to Rates Master Circular / Block Rakes / Mini Rakes / Two Point Combinations etc./2015/0 |
TCR/1017/2015/1 |
Transportation Products-Block Rakes / Mini Rakes / Two Point Combinations etc./2015/0 |
18.09.2015 |
Rates Master Circular / Block Rakes / Mini Rakes / Two Point Combinations etc./2015/0 |
- |
- |
28.09.2015 |
TFA |
Addendum-16 to RC-36 of 2009 |
TCR/1078/2015/24 |
Classification of Iron Ore |
01.09.2015 |
RC-36 and Addenda thereto |
Addendum 15 to RC-36 of 2009 |
- |
08.09.2015 |
31.03.2016 |
RC-25 |
TC-I/2014/201/9 |
Free time for loading / unloading of BCFC wagons. |
21.08.2015 |
RC-15 of 2015 |
RC-15 of 2015 |
|
01.09.2015 |
TFA |
RC-24 |
TC-I/2015/223/1 |
Notified Stations |
21.08.2015 |
RC-04 of 2015 and
Addendum-1 thereto
|
- |
- |
25.08.2015 |
24.02.2016 |
Addendum to RC 24 of 2015 |
TC-I/2015/223/1 |
Notified Stations |
02.09.2015 |
RC-24 of 2015 |
- |
- |
25.08.2015 |
24.02.2016 |
Corrigendum to Rates Master Circular / Block Rakes / Mini Rakes / Two Point Combinations etc./2015/0 |
TCR/1017/2015/1 |
Transportation Products-Block Rakes / Mini Rakes / Two Point Combinations etc./2015/0 |
12.08.2015 |
Rates Master Circular / Block Rakes / Mini Rakes / Two Point Combinations etc./2015/0 |
- |
- |
20.08.2015 |
19.02.2016 |
Addendum to Rates Master Circular / E-payment / 2014 /1 |
TC-I/2014/104/1 |
e-payment |
30.07.2015 |
- |
- |
- |
- |
- |
Rates Master Circular / Dynamic Pricing Policy / 2015/ 0 |
TCR/1078/2015/14 |
Dynamic Pricing Policy - Levy of Busy Season Charge, Development Surcharge and Congestion Charge
|
20.07.2015 |
- |
- |
- |
- |
- |
Addendum to Rates Master Circular /Weighment/2014/0 |
TC-1/2006/109/6 Pt.II |
Weighment of wagons / rake, exemption from weighment, procedure to deal with overloaded wagon(s) and levy of Detention Charge etc |
17.07.2015 |
Rates Master Circular / Weighment / 2014 / 0 |
- |
- |
Date of Gazette Notification |
TFA |
Corrigendum-1 to RC-27 of 2014 |
TC-I/2012/214/2 Pt.2 |
Service Tax Certificate for transportation of goods by rail (STTG Certificate) |
15.07.2015 |
RC-27 of 2014 |
- |
- |
- |
TFA |
Rates Master Circular / E-payment / 2014 / 1 |
TC-I/2014/104/1 |
e-payment |
10.07.2015 |
- |
- |
- |
- |
- |
Corrigendum No.2 to RC-23 of 2015 |
TCR/1078/2008/11 Pt. |
Levy of Congestion Surcharge for traffic booked to Bangladesh |
30.03.2017 |
Corrigendum to RC 23 of 2015 dated 10.01.2017 |
- |
- |
01.04.2017 |
31.03.2018 |
Corrigendum to RC-23 of 2015 |
TCR/1078/2008/11 |
Levy of Congestion Surcharge for traffic booked to Bangladesh |
10.01.2017 |
Corrigendum to RC 23 of 2015 dated 10.01.2017 |
|
|
12.01.2017 |
31.03.2017 |
RC-23 |
TCR/1078/2007/22 |
Dumps on NFR and ER for transportation of consignments to Bangladesh and Levy of Congestion Charge. |
09.07.2015 |
RC-105 of 2007 and Addenda-1, 2 & 3 thereto and RC-05 of 2010 and Addenda-1, 2 & 3 thereto and RC-11 of 2013
|
- |
- |
19.07.2015 |
18.07.2016 |
Corrigendum No.03 to RC-23 of 2015 |
TCR/1078/2008/11 Pt. |
Levy of Congestion Surcharge for traffic booked to Bangladesh |
13.02.2018 |
|
|
|
01.04.2018 |
31.03.2019 |
Corrigendum No. 04 to RC -23 of 2015  |
TCR/1078/2008/11 Pt. |
Levy of Congestion Surcharge for traffic booked to Bangladesh |
05.03.2019 |
|
|
|
|
|
Corrigendum-9 to RC-08 of 2015 |
TCR/1078/2015/07 |
Adjustments in Base Freight rates effective from 01.04.2015. |
09.07.2015 |
RC-08 of 2015 and Corrigendum thereto |
- |
- |
08.07.2015 |
TFA |
Corrigendum-8 to RC-08 of 2015 |
TCR/1078/2015/07 |
Adjustment in Base Freight Rates effective from 01.04.2015 |
0707.2015 |
RC-08 of 2015 and Corrigendum thereto |
- |
- |
15.07.2015 |
TFA |
Corrigendum-4 to Rates Master Circular / PCC / 2014 / 0 |
TCR/1394/2009/03 |
Permissible Carrying Capacity |
03.07.2015 |
Rates Master Circular/PCC/2014/0 |
- |
- |
10.07.2015 |
TFA |
Corrigendum-7 to RC-08 of 2015 |
TCR/1078/2015/07 |
Adjustment in Base Freight Rates effective from 01.04.2015 |
01.07.2015 |
RC-08 of 2015 and Corrigendum thereto |
- |
- |
01.07.2015 |
TFA |
Corrigendum -1 to Rates Master Circular / FIS / 2015 / 0 |
TCR/1078/2014/02 |
Freight Incentive Schemes |
26.06.2015 |
Rates Master Circular / FIS / 2015 / 0 |
- |
- |
- |
- |
RC-22 |
TCR/1078/2014/02 |
Freight Incentive Schemes. |
24.06.2015 |
Rates Master Circular / FIS / 2014/0 dated 13.06.2014,
RC-25 of 2014 dated 13.08.2014,
Rates Master Circular/ Block Rakes/ Mini Rakes/ Two Point Combinations etc./2015/0 dated 05.06.2015
and
Rates Master Circular / FIS / 2015 / 0 dated 16.06.2015 |
Rates Master Circular / FIS / 2014/0 dated 13.06.2014 and
RC-25 of 2014 |
- |
24.06.2015 |
TFA |
RC-21
Attachment |
TCR/1147/2015/01 |
Transportation of Relief material by Rail. |
18.06.2015 |
M/o Home Affairs, Disaster Management Division L.No. 32-7/2014-NDM-1 dated 080415 |
- |
- |
- |
TFA |
Corrigendum to Rates Master Circular / CRT-CCR-Hub&Spoke / 2015/ 0 |
TC-I/2014/302/2 |
CRT-CCR-Hub&Spoke system of charging |
16.06.2015 |
Rates Master Circular / CRT-CCR-Hub&Spoke / 2015/ 0 |
- |
- |
22.06.2015 |
31.03.2016 |
Rates Master Circular / FIS / 2015 / 0 |
TCR/1078/2014/02 |
Freight Incentive Schemes |
16.06.2015 |
Rates Master Circular / FIS / 2014 / 0 & Corrigendum -1 thereto & RC25 of 2014 |
- |
|
25.06.2015 |
TFA |
Corrigendum-6 to RC-08 of 2015 |
TCR/1078/2015/07 |
Adjustments in Base Freight Rates effective from 01.04.2015. |
16.06.2015 |
RC-08 of 2015 and Corrigenda thereto |
- |
- |
16.06.2015 |
TFA |
Rates Master Circular / Block Rakes / Mini Rakes / Two Point Combinations etc./2015/0 |
TCR/1017/2015/1 |
Transportation Products : Block Rakes / Mini Rakes / Two Point Combinations etc. |
05.06.2015 |
|
- |
- |
- |
- |
Corrigendum-4 to RC-29 of 2012 |
TC-I/12012/215/1 Pt. |
Refund of Service Tax portion on waived amount of Demurrage / Wharfage. |
03.06.2015 |
RC-29 of 2012 and Para 3.4 (iii) of RBA No. 35 of 2012 dated 01.10.2012 |
- |
- |
- |
TFA |
RC-20 |
TC-I/2002/214/5 |
All India Engine Hour Cost (AIEHC) for recovery of Siding and Shunting Charges. |
01.06.2015 |
RC-19 of 2014 |
RC-19 of 2014 |
RC-18 of 2016 |
01.07.2015 |
TFA |
Corrigendum-3 to RC-29 of 2012 |
TCR/1078/ |
Levy of Service Tax on transportation of goods by Rail. |
27.05.2015 |
RC-29 of 2012
and Corrigenda thereto, RC-27 of 2014 & L.No’s. TCR/1078/2011/2 dt. 05.10.2012 & 08.10.2012; TCR/1078/2012/24 dt. 24.03.2013 and
TC-I/2012/214/2 dt. 14.11.2014 |
- |
- |
01.06.2015 |
TFA |
Corrigendum-5 of RC_08 of 2015 |
TCR/1078/2015/07 |
Adjustments in Base Freight rates effective from 01.04.2015 |
22.05.2015 |
RC-08 of 2015 and Corrigenda thereto |
- |
- |
- |
|
Addendum-3 to RC-05 of 2010 |
TCR/1078/2007/22 |
Opening of dump on NFR and ER for transportation of Consignments to Bangladesh. |
19.05.2015 |
RC-05 of 2010
and
Addenda
thereto
|
- |
- |
20.05.2015 |
18.07.2015 |
Addendum-3 to RC-105 of 2007 |
TCR/1078/2007/22 |
Opening of dump on NFR and ER for transportation of Consignments to Bangladesh. |
19.05.2015 |
RC-105 of 2007 and Addenda thereto
|
- |
- |
20.05.2015 |
18.07.2015 |
RC-19 |
TCR/1015/2015/01 |
Rates for Automobile Traffic carried on NMG / BCCNR and BCACM wagons. |
19.05.2015 |
RC No’s. 04 & RC-24 of 2010 and RC No’s. 03, 16, 29 & 37 of 2011
|
RC No’s. 04 & RC-24 of 2010 and RC No’s. 03, 16, 29 & 37 of 2011
|
- |
01.06.2015 |
31.05.2016 |
RC-18 |
TC-I/2014/201/14 |
Free time for loading / unloading of flat rake in the case of freight terminals / sidings / goods sheds / steel plants on Engine-on-load. |
14.05.2015 |
RC-23 of 2012
|
- |
- |
14.05.2015 |
TFA |
Corrigendum-3 to RC-31 of 2014 |
TCR/1644/2014/03 |
Rebate in Freight for traffic transported in privately owned wagons. |
14.05.2015 |
RC-31 of 2014
and
Corrigenda thereto
|
- |
- |
- |
TFA |
RC-17 |
TCR/1078/2014/22 |
Revision in Rule No. 223 of Indian Railway Code for Traffic (Commercial) Department, 1993. |
12.05.2015 |
Indian Railway Code for Traffic (Commercial) Department, 1993 |
- |
- |
12.05.2015 |
TFA |
Advance Correction Slip No. 23 to Indian Railway Code for Traffic (Commercial) Department, 1993 |
- |
Revision in Rule No. 223 of Indian Railway Code for Traffic (Commercial) Department, 1993 |
12.05.2015 |
- |
- |
- |
- |
- |
RC-16 |
TCR/1099/2012/1 |
Inflation in distance for charging freight on Banspani - Tomka BG section on East Coast Railway and South Eastern Railway. |
05.05.2015 |
RC-14 of 2007, RC-06 and RC-14 of 2012 |
- |
- |
01.06.2015 |
31.05.2018 |
Addendum to RC-08 of 2015 |
TCR/1078/2015/07 |
Procedure for inclusion of new commodity in Goods Tariff. |
30.04.2015 |
IRCA Goods Tariff No. 48, Part-I (Vol-II) |
2015/TC(CR)/204/4 Pt. dated 21.04.2015 |
- |
30.04.2015 |
TFA |
Corrigendum-4 to RC-08 of 2015 |
TCR/1078/2015/07 |
Adjustments in Base Freight rates effective from 01.04.2015. |
30.04.2015 |
RC-08 of 2015 and Corrigenda thereto |
- |
- |
30.04.2015 |
TFA |
RC-15
|
TC-I/2014/201/9 |
Free time for loading / unloading of BCFC wagons. |
29.04.2015 |
RC-03 of 2015 |
- |
RC-25 of 2015 |
13.05.2015 |
TFA |
Corrigendum-1 to RC-41 of 2014 |
2007/TC-I/302/1 Pt.H |
Haulage Charge for movement of containers in privately owned wagons. |
27.04.2015 |
RC-41 of 2014 |
- |
- |
10.05.2015 |
TFA |
Corrigendum-3 to RC-08 of 2015 |
TCR/1078/2015/07 |
Adjustments in Base Freight rates effective from 01.04.2015. |
10.04.2015 |
RC-08 of 2015 and Corrigendum thereto |
- |
- |
- |
TFA |
Corrigendum-2 to RC-08 of 2015 |
TCR/1078/5/07 |
Adjustments in Base Freight Rates effective from 01.04.2015. |
06.04.2015 |
RC-08 of 2015 and Corrigendum thereto |
- |
- |
- |
TFA |
Corrigendum-2 to RC-29 of 2012 |
TCR/1078/2011/2 |
Levy of Service Tax on Transportation of Goods by Rail. |
31.03.2015 |
RC-29 of 2012 Corrigendum thereto |
|
|
01.04.2015 |
|
RC-14 |
TCR/2201/2004/1 |
Revision of rates of Miscellaneous charges. |
31.03.2015 |
RC-10 of 2014 |
RC-10 of 2014 |
- |
01.04.2015 |
31.03.2016 |
RC-13 |
99/TC-I/101/2 |
Wagon Registration Fee (WRF). |
30.03.2015 |
RC-07 of 2006 |
- |
- |
01.04.2015 |
TFA |
RC-12 |
TCR/1055/95/1 |
Revision of Charges payable to Tuticorin Port Trust Railway. |
26.03.2015 |
RC-09 of 2014 |
RC-09 of 2014 |
- |
W.e.f. the date of publication in official Gazette |
TFA |
RC-11 |
TCR/1055/95/1 |
Revision of rates on Port Trust Railway. |
26.03.2015 |
RC-08 of 2014 |
RC-08 of 2014 |
- |
W.e.f. Suitable date after proper notice to Public & other Railways |
TFA |
RC-10 |
TCR/1055/95/1 |
Revision of Haulage charges payable to Port Trusts. |
26.03.2015 |
RC-07 of 2014 |
RC-07 of 2014 |
- |
01.04.2015 |
TFA |
Corrigendum-2 to RC-36 of 2009 |
TCR/1078/2007/03 Pt.B |
Classification of Iron Ore. |
25.03.2015 |
RC-36 of 2009 & Corrigendum and Addenda thereto, RC-17 of 2014 and RC-08 of 2015 & Corrigendum thereto |
- |
- |
01.04.2015 |
TFA |
Corrigendum-9 to RC-05 of 2011 |
2007/TC-I/ 302/1 Pt.H |
Haulage Charge recoverable for movement of notified commodity groups in container. |
24.03.2015 |
Corrigendum-6 to RC-05 of 2011 |
- |
- |
01.04.2015 |
TFA |
Corrigendum to RC-08 of 2015 |
TCR/1078/2015/07 |
Adjustments in Base Freight rates effective from 01.04.2015. |
20.03.2015 |
- |
- |
- |
01.04.2015 |
TFA |
RC-09 |
TC-I/2006/109/6 Pt.3 |
Exemption from Mandatory (100%) weighment in case of containerized Import traffic |
20.03.2015 |
RC-16 of 2013& RC-39 of 2014 |
- |
- |
24.03.2015 |
23.03.2016 |
RC-08
Addendum to RC-08 of 2015
IRCA Goods Tariff No. 48, Part-1(Vol.II) wef 01.04.2015
|
TCR/1078/2015/07 |
Adjustments in Base Freight rates effective from 01.04.2015. |
16.03.2015 |
- |
- |
- |
01.04.2015 |
TFA |
Corrigendum No.1 |
|
|
20.03.2015 |
|
|
|
|
|
Corrigendum-2 |
|
|
06.04.2015 |
|
|
|
|
|
Corrigendum-3
|
-do- |
-do- |
10.04.2015
|
- |
- |
- |
- |
TFA |
Corrigendum-4 |
-do- |
-do- |
30.04.2015 |
|
|
|
|
|
Corrigendum-5 |
-do- |
-do- |
22.05.2015 |
|
|
|
|
|
Corrigendum-6 |
-do- |
-do- |
16.06.2015 |
- |
- |
- |
16.06.2015 |
TFA |
Corrigendum-7 |
-do- |
-do- |
01.07.2015 |
- |
- |
- |
01.07.2015 |
TFA |
Corrigendum-8 |
-do- |
-do- |
07.07.2015 |
- |
- |
- |
15.07.2015 |
TFA |
Corrigendum-9 |
-do- |
-do- |
08.07.2015 |
- |
- |
- |
08.07.2015 |
TFA |
Corrigendum-10 |
-do- |
-do- |
26.10.2015 |
- |
- |
- |
01.11.2015 |
31.10.2016 |
Corrigendum-11 |
-do- |
-do- |
25.04.2016 |
- |
- |
- |
01.05.2016 |
TFA |
Corrigendum-12 |
-do- |
-do- |
20.05.2016 |
- |
- |
- |
- |
- |
Corrigendum-13 |
-do- |
-do- |
31.05.2016 |
- |
- |
- |
06.06.2016 |
31.03.2017 |
Corrigendum - 14 |
-do- |
-do- |
22.08.2016 |
- |
- |
- |
22.08.2016 |
- |
rrigendum No. 15 |
-do- |
-do- |
24.08.2016 |
- |
- |
- |
24.08.2016 |
- |
Corrigendum No. 16 |
-do- |
-do- |
09.11.2016 |
- |
- |
- |
15.11.2016 |
TFA |
Corrigendum No. 17 |
-do- |
-do- |
17.11.2016 |
- |
- |
- |
24.11.2016 |
TFA |
Corrigendum No. 18 |
-do- |
-do- |
07.03.2017 |
- |
- |
- |
09.03.2017 |
TFA |
Corrigendum No. 19 |
-do- |
-do- |
30.03.2017 |
- |
- |
- |
01.04.2017 |
31.03.2018 |
Corrigendum No. 20 |
-do- |
-do- |
06.07.2017 |
- |
- |
- |
10.07.2017 |
TFA |
Corrigendum N0. 21 |
-do- |
-do- |
24.07.2017 |
- |
- |
- |
26.07.2017 |
30.06.2018 |
Corrigendum No. 22 |
-do- |
-do- |
27.02.2018 |
- |
- |
- |
01.04.2018 |
31.03.2019 |
Corrigendum No.23 |
-do- |
-do- |
26.03.2019 |
- |
- |
- |
01.04.2019 |
30.09.2019 |
Corrigendum No. 24 |
-do- |
-do- |
30.09.2019 |
- |
- |
- |
01.10.2019 |
31.03.2020 |
Corrigendum No. 25 |
-do- |
-do- |
21.04.2020 |
|
|
|
|
|
Corrigendum No. 26 to Rates Circular No.8 of 2015 |
-do- |
Adjustment in Base Freight Rates- Classification of Commodities. |
02.03.3021 |
|
|
|
01.04.2021 |
31.03.2022 |
Corrigendum No.27 to Rates Circular No.08 of 2015 |
-do- |
|
|
|
|
|
|
|
RC-07 |
TCR/1543/2009/1 |
Rates of Terminal Charges to be collected by Port Trust Railways from customers. |
13.03.2015 |
RC-88 of 2007 & RC-04 of 2013 |
- |
- |
01.04.2015 |
31.03.2017 |
RC-06 |
2007/TC-I/302/1 Pt.B |
Operation of container trains by Private Container Operator (PCO) in Railway owned terminals. |
12.03.2015 |
RC-06 of 2014 and RC-38 of 2014 |
- |
- |
01.04.2015 |
31.03.2016 |
RC-05
Corrigendum No. 02 to Rates Circular No.5 of 2015 dt. 24.02.2022
Corrigendum No. 01 to Rates Circular No. 5 of 2015
|
TCR/1394/2012/02 |
Permissible Carrying Capacity of BLLA, BLCA, BLLB, BLCB, BFKN, BLCAM and BLCBM wagons for movement of Container Traffic.
|
26.02.2015 |
RC-42 of 2014 |
RC-42 of 2014 |
- |
02.03.2015 |
TFA |
RC-04
Addendum 1
|
TC-1/2001/223/1Pt.C
|
Notified Stations
|
20.02.2015
|
- |
- |
- |
- |
- |
RC-03 |
TC-I/2014/201/9 |
Free time for loading / unloading of BCFC wagons. |
12.02.2015 |
RC-23 of 2014 |
- |
- |
13.02.2015 |
12.05.2015 |
RC-02
TC-I/2014/103/2
Corrigendum to Rates Circvular No.02 of 2015 
|
TC-I/2014/103/2
TC-I/2014/103/2 Pt.II
dt. 26.04.2019
|
Electronic Transmission of Railways Receipt (e-TRR)
Electronic
Transmission of Railway Receipt(eT-RR)- inclusion of Container Traffic
|
28.01.2015
|
- |
- |
- |
30.01.2015 as Pilot Project for POL traffic originating from HPCL/ LONI/ CR |
TFA |
Addendum
dated 13.03.2018 |
TC-I/2014/103/2 |
Electronic Transmission of Railways Receipt (e-TRR) |
13.03.2018 |
- |
- |
- |
- |
- |
Addendum No. 2 |
TC-I/2014/103/2 Pt.II |
Pan India implementation of Electronic Transmission of Railway Receipt (eT-RR) |
04.07.2019 |
|
|
|
|
|
RC-01 |
TCR/1394/2015/01 |
Running of freight trains on 25 T Axle Load routes. |
16.01.2015 |
RMC/PCC/2014/0 dated 09.07.2014 |
- |
- |
22.01.2015 |
TFA |