Letter No
|
Subject
|
Date of Issue
|
2023
|
2016/C&IS/Mtng./Conference/2/pt |
Replacement of non- compliant desktops /endpoints based on Meity's guidelines. |
10.10.2023 |
A-15013(12)11/2020-RBCC |
Guidelines for procurement of Desktop PCs |
14.09.2023 |
2022 |
No.2022/RBCC/5/6/WebsiteUpdation |
Ensuring the content on Railway Websites is ‘Up-To-Date’ |
29.03.2022 |
A-15013(12)11/2020-RBCC |
Guidelines for procurement of Desktop PCs. |
04.01.2022 |
A-15013(12)/11/2021-RBCC |
Model Technical Speification od Desktop PCs Procurement |
03.01.2022 |
2021 |
2020/C&IS/Project/Proposals/Umbrella 2020-21/2 Pt. 1 |
Sanction of the work "Revamping of 47 Indian Railways Portal Websites". |
30.12.2021 |
File No.A-15013(12)/5/2021-RBCC |
Model Technical Speification od Desktop PCs Procurement (Office Order No.63 of 2021) |
25.11.2021 |
2020/C&IS/Mtng/Conference/12 |
Nomination of Nodal Officer for management of websites. |
17.08.2021 |
2020 |
2016/RBCC/5/6/WebsiteUpdation |
Procedure for uploading content on IR Website (Office Order No.75 of 2020). |
14.09.2020 |
2017/C&IS/Project/Funding-CRIS/43 Pt.1 |
Procedure for release of funds to RailTel and RITES for IT Projects under Plan Head - 17 (Computerization) |
02.09.2020 |
2020/C&IS/Projects/Proposals/Umbrella 2020-32/2 |
Sanction of the work "Implementation of e-Office for Zonal Railways (Phase-III)" for the balance users. |
01.09.2020 |
2019/RBCC/7/7/Policy Implementation |
Office Order No.-42 - Communication through e-mail |
22.05.2020 |
2018/RBCC/Project Payment/Misc. |
Release of Payment to CRIS or Executing Railway PSU for sanctioned work under PH-17. |
11.03.2020 |
2011/C&IS/Committee/Laptop/Pt.II
|
Clarification on provision of Laptops to officers in lieu of Desktop
|
12.02.2020
|
2019 |
2011/C&IS/Committee/Laptop/Pt.II
|
Simplification of the procedure of Laptop reimbursement for Probationary Officers of Group 'A' Railway Services under training at Centralised Training Institutes
|
19.12.2019
|
2019/C&IS/WP 2019-20/PB/1
|
Distribution of outlays among works of LAW Book for Budget 2019-20 under the Plan Head - 17 (Computerization).
|
31.10.2019
|
2010/C&IS/Project/RTIS/59/Pt.
|
Sanction of the Revised Estimate for the work of "Real time Train Information System (RTIS)".
|
19.09.2019
|
2006/C&IS/OTH/Delegation of Powers/36- Pt.
(Office Order -62)
|
Enhancement of Limit for Procurement of Desktop PC
|
02.08.2019
|
2018 |
2017/C&IS/Project/SIMS-2/45
|
Revision of cost of the work of " Safety Information Management System (SIMS) Phase-2".
|
29.11.2018
|
2017 |
2017/RBCC/7/10/e-Office/DSC Policy for IR
|
Digital Signature Certificate (DSC) Policy for Railway Units.
|
21.07.2017
|
2017/C&IS/WP 2017-18/LAW Book/3
|
Distribution of outlays among works of LAW Book for Budget 2017-18 under the Plan Head - 17 (Computerization)
|
14.06.2017
|
2017/C&IS/Project/EA-MDM-RC-Ph-1/1
|
Sanction for the work of "Master Data Management System (MDMS) Phase 1".
|
18.04.2017
|
2017/C&IS/Project/EA-MDM-RC-Ph-1/1
|
Sanction for the work of "Rail Cloud (Phase-1)."
|
18.04.2017
|
2017/C&IS/Project/EA-MDM-RC-Ph-1/1
|
Sanction for the work of "Enterprise Architecture (Phase-1)".
|
18.04.2017
|
2016/C&IS/Project/Rep.Mod. HW-UTS/153
|
Sanction for the work of "Hardware replacement and modernization of UTS Project on Indian Railway".
|
11.04.2017
|
2016/C&IS/Project/DR-ICMS/149
|
Sanction for the work of "Disaster Recovery set up for ICMS Application".
|
11.04.2017
|
2016/C&IS/Project/Rly. Proposals/147
|
Sanction for the works of " Enhancement of infrastructure for exsting Mail Server and SMS Gateway to be used in FOIS".
|
12.04.2017
|
2016/C&IS/Project/Rly. Proposals/147
|
Sanction for the work of " Implementation of direct IP Peering between Railnet and Railway Internet Datacentre (RIDC) at CRIS".
|
12.04.2017
|
2916/C&IS/Project 43 IR Websites GIGWC/161
|
Sanction for the works of " Making 43 Indian Railways (IR) websites GIGW compliance".
|
12.04.2017
|
2016/C&IS/WP 2016-17/Rly. Proposals/147
|
Inclusion of the works of Northeast Frontier Railway in the works Programme, 2017-18.
|
12.04.2017
|
2016/C&IS/WP 2016-17/Rly. Proposals/147
|
Inclusion of the works of Northeast Frontier Railway in the works Programme, 2017-18.
|
12.04.2017
|
2016/C&IS/WP 2016-17/Rly. Proposals/147
|
Sanction for the works of "Replacement of 630 Nos. UTS Ticket Printers" and " Replacement of overaged/ defective UPS and batteries in PRS, UTS, Booking Offices".
|
12.04.2017
|
2016/C&IS/WP 2016-17/Rly. Proposals/147
|
Inclusion of the work of "South Western Railway- Replacement of PRS, UTS and FOIS Equipment" of South Western Railway in the works Programme, 2017-18.
|
11.04.2017
|
2016/C&IS/WP 2016-17/Rly. Proposals/147
|
Inclusion of the work of " Provision of Datacom Equipment for UTS in Kharagpur Division" of South Eastern Railway in the Works Programme, 2017-18.
|
11.04.2017
|
2016/C&IS/WP 2016-17/Rly. Proposals/147
|
Inclusion of the works of South Central Railway in the works Programme, 2017-18
|
11.04.2017
|
2016/C&IS/Project/PRS-M-Ph-2/120
|
Sanction for the work of " Passenger Reservation System Modernization (Phase-2)".
|
11.04.2017
|
2016/C&IS/Project/PRS-DC-Cons/121
|
Sanction for the work of "Passenger Reservation System Data Centre Consolidation at CRIS".
|
11.04.2017
|
2016/C&IS/Project/Near Site DR-FOIS/135
|
Sanction for the work of " Near Site Disaster Recovery setup for FOIS".
|
11.04.2017
|
2017/C&IS/Project/PM&MS/3
|
Sanction for the work of "Project Monitoring and Management System and PPP Project Approval and Monitoring System".
|
11.04.2017
|
2016/C&IS/WP 2016-17/Rly. Proposals/147
|
Sanction for the work of "Realignment of Network Topology of existing unified Ticketing Network of Eastern Railway and migration of existing network operation from EIGRP to OSPF and "Procurement of 150 pairs of High Speed Modems".
|
11.04.2017
|
2016/C&IS/Project/Repl.CAO Storage/156
|
Sanction for the work of "Replacement of storage of COA system at 37 Divisions of Indian Railways"
|
11.04.2017
|
2017/C&IS/Project/BSIS/4
|
Sanction for the work of "Design, Development and Implementation of Building and Structures Information System (BSIS) for Indian Railways".
|
11.04.2017
|
2015/C&IS/Project/AGBTCS/19
|
Sanction for the work of "Automatic Gate Based Ticket Checking System (for trial in two stations)".
|
11.04.2017
|
2016
|
2016/C&IS/Projects/CRIS Charges/99
|
Standardization of CRIS Charges for all estimates of IT Projects pertaining to the Plan Head-17 (Computerization)
|
16.09.2016
|
2016/C&IS/WP-2016-17/LAW Book/5
|
Distribution of outlays among works of LAW Book for Budget 2016-17
|
21.06.2016
|
2016/C&IS/WP 2016-17/Rly-DRF/2
|
Procurement of PRS & UTS equipment on replacement account over S.W.Railway during 2016-17.
|
19.05.2016
|
2016/C&IS/WP 2016-17/Rly-DRF/2
|
Replacement of datacom equipment of PRS/UTS and structure cabling at 450 PRS & UTS locations over South Central Railway.
|
19.05.2016
|
2016/C&IS/WP 2016-17/Rly-DRF/2
|
Replacement of 439 nos. of 3 kVA UPS at various locations over South Central Railway.
|
19.05.2016
|
2016/C&IS/WP 2016-17/Rly-DRF/2
|
Replacement of 17nos.of Routers equivalent to CISCO 3945 in the PRS/ UTS network of South Central Railway.
|
19.05.2016
|
2016/C&IS/WP 2016-17/Rly-DRF/2
|
Replacement of Thinclients for UTS with Comprehensive onsite warranty for 3 years - 667 Nos.
|
19.05.2016
|
2016/C&IS/Project/IPAS-PAO-RB/107
|
Implementation of IPAS in Pay & Accounts Office, Railway Board
|
19.05.2016
|
2016/C&IS/WP 2016-17/Rly-DRF/2
|
Replacement of 827 UTS Ticket printers over Northern Railway.
|
19.05.2016
|
2016/C&IS/Project/ESE Rollout/109
|
Rolling out of Software for Engineering Services Examination - Allocation and online medical reporting of candidates
|
19.05.2016
|
2015/C&IS/Project/CAMS/58
|
Implementation of Call and Appointment Management Software (CAMS) for MR
|
19.05.2016
|
2016/C&IS/Project/CRS/108
|
Design, Development and Implementation of CRS sanction management system on PAN India basis
|
19.05.2016
|
2015/C&IS/Project/Integn-COMS/94
|
Integration of COMS, IVRS, 138, Catering and Security - Socaial Media Twitter
|
19.05.2016
|
2016/C&IS/WP 2016-17/Rly-DRF/2
|
REPLACEMENT OF UTS TICKET PRINTERS - 600 Nos.
|
19.05.2016
|
2016/C&IS/WP 2016-17/Rly-DRF/2
|
REPLACEMENT OF TERMINAL WITH KEY BOARD - 519 Nos.
|
19.05.2016
|
2016/C&IS/WP 2016-17/Rly-DRF/2
|
NGP(GS)-Replacement of old UPS provided at various loactions on Nagpur division on age cum condition basis
|
19.05.2016
|
2016/C&IS/WP 2016-17/Rly-DRF/2
|
REPLACEMENT OF 643 Nos. UTS TICKET PRINTERS
|
19.05.2016
|
2016/C&IS/WP 2016-17/Rly-DRF/2
|
REPLACEMENT OF PRS 513 Nos DUMB TERMINALS WITH KEYBOARDS
|
19.05.2016
|
2016/C&IS/Project/ERP HRMS/105
|
ERP based Human Resource Management System
|
24.05.2016
|
2016/C&IS/Project/WAMS/103
|
Design, Development and implementation of Workshop Accounts Management System
|
19.05.2016
|
2016/C&IS/Project/DR-IPAS/102
|
Sanction for the work "Setting up a Disaster Recovery Site for IPAS, e-RECON, ARPAN, TAMS and WAMS".
|
19.05.2016
|
2015/C&IS/Project/D-Warehouse-IPAS/53
|
Data Warehouse for IPAS
|
19.05.2016
|
2015/C&IS/Project/Data Analytics/52
|
Data Analytics Unit for Indian Railways
|
|
2015/C&IS/Project/TMMMS/55
|
Design, Development and Implementation of Track Machine Maintenance and Management System on PAN India basis
|
19.05.2016
|
2015/C&IS/Project/Bridge MS/54
|
Design, Development and Implementation of Bridge Management System on PAN India basis
|
19.05.2016
|
2015/C&IS/Project/CDKR/76 Pt.
|
Creation of Centralized Design Knowledge Resource at CRIS
|
19.05.2016
|
2015/C&IS/Project/Fuel-MS/82
|
Fuel Management System - Pilot for South Central Railway
|
19.05.2016
|
2016/C&IS/Project/CMM-II/97
|
Rollout of coaching maintenance management phase - II for 24 coaching depots
|
19.05.2016
|
2015/C&IS/Project/ESB/73
|
Enterprise Service Bus for IT Application
|
19.05.2016
|
2015/C&IS/Project/HHT-Exp/62
|
Proliferation of HHT for TTE's
|
19.05.2016
|
2015/C&IS/Project/Rly Mobile App/51
|
Integrated Railway Mobile App
|
19.05.2016
|
2015/C&IS/Project/SMS Alert System/47
|
SMS Alert System (Destination alert) to Reserved Passengers
|
20.05.2016
|
2015/C&IS/Project/e-CRM/66 Pt.
|
Development of e-CRM (Customer Relationship Management) Module
|
31.05.2016
|
2015/C&IS/Project/PRs Web/93
|
Upgradation of PRs Web www.indianrail.gov.in on state-of-the-art technology
|
19.05.2016
|
2016/C&IS/WP 2016-17/Rly-DRF/2
|
Replacement of overaged datacom equipment of PRS & UTS network over KUR & SBP divisions of ECoR&provision of back up power supply & datacom equipment to PRS & UTS over WAT division of ECoR.
|
19.05.2016
|
2015
|
2015/C&IS/Project/Re-Appropriation/20
|
Progress/Status of works under Plan Head-17 (Computerisation) being executed by CRIS.
|
12.04.2016
|
2009/C&IS/Project/PRS-1000 New Terminals/12/Pt.
|
Sanction of the revised estimate of the work of 1000 Passengers Reservation System location in various cities across the country.
|
02.09.2015
|
2014/C&IS/Project/NR-IPAS Ph-II/57
|
Sanction of the detailed estimate of the work Implementation of IPAS on 11 Zonal Railways
|
11.08.2015
|
2014/C&IS/Project/NR-TH CLT/36
|
Revised estimate of the work of Northern Railway- Replacement of 1700 Thin Clients.
|
11.08.2015
|
2009/C&IS/Project/Refund Coaching/56
|
Revised Estimate for the work of " Computerization of refund Coaching over all Indian Railways".
|
19.06.2015
|
2013/C&IS/Project/13-14/NR-621 Term KB/10
|
Change in the name of work from " Replacement of 621 Dumb Terminals with thin Clients and Keyboard" and the detailed estimate of the work.
|
19.06.2015
|
2014/C&IS/WP 2015-16/Law Book/2
|
Distribution of outlays among works of LAW Book for Budget 2015-16 under Plan Head-17 (Computerization)
CR || DLW || DMW || ER || ECR || ECoR || ICF || Metro || NR || NCR || NWR || NER || NFR || SECR || SWR || SR || SCR || SER || WR ||WCR ||
|
11.06.2015
|
2015/C&IS/Projects/
|
Sanction letters for works programme 2015-16 costing above 2.5 crores under Plan Head 17(Computerisation).
NR || ER || SCR ||
|
06.06.2015
|
2014/C&IS/Project/RSMS/29
|
Sanction of the detailed estimate for the work of " Rollout of Phase-II of networking system of security control rooms over Indian Railways RPF Security Management System (RSMS)".
|
25.05.2015
|
2012/C&IS/Project/IREPS-II/31
|
Sanction of the revised estimate for the work of " Expansion of e-Procurement to Divisions/Depots/Workshops and other Field Units".
|
08.05.2015
|
2008/C&IS/Project/Time-Tabling-Mod-ICMS/3
|
Amendment of MOU of Software Aided Train Scheduling System
|
15.01.2015
|
2008/C&IS/Project/MMCHG-Depot-Ph-1/8
|
Sanction of detailed estimate for Phase-I Rollout of Maintenance Module for Coaching Depots
|
15.01.2015
|
2014/C&IS/Project/IWR-UTS-REPL/58
|
Sanction of detailed estimate for WR – Replacement of UTS equipment
|
14.01.2015
|
2013/C&IS/Project/IReplacement-PMS_Equip/5
|
Sanction of detailed estimate of Replacement of hardware of 10 stations of New Delhi – Howrah Corridor and replacement of SAN storage installed at Central Site, CRIS for PMS.
|
15.01.2015
|
2014
|
2011/C&IS/Project/IRGIS Map/38
|
Sanction of detailed estimate for the work of "Station Navigation Information System(SNIS)" under the Plan Head 17 (Computerization)
|
10.12.2014
|
2014/C&IS/Projects/WPMS/16
|
Sanction of the revised estimate for the work of Deployment and Implementaion of WPMS in Indian Railways.
|
20.11.2014
|
2014/C&IS/Projects/SECRSECROADS/67
|
Detailed estimates of the work of Replacement of Hardware, Software and Migration of E-working application of SECR-SECRoads
|
12.11.2014
|
2014/C&IS/Projects/WR-Repl. Datacom Equip/61
|
Detailed estimates of the work of Western Railways - Replacement of Datacom Equipments of Unreserved Ticketing system.
|
.11.2014
|
2014/C&IS/Projects/WR-Repl. DumbTerminals/59
|
Detailed estimates of the work of Western Railways - Replacement of 335 Nos. LCD Dumb Terminals
|
.11.2014
|
2014/C&IS/Projects/14-15/WP/64/Pt.1
|
Sanction letters for works programme 2014-15 costing above 2.5 crores under Plan Head 17(Computerisation).
NR
|
28.10.2014
|
2014/C&IS/Project/LAW Book 2014-15/28
|
Distribution of outlays among works of LAW Book for Budget 2014-15 under Plan Head-17 (Computerization)
CR | DLW | DMW | ICF | ER | ECR | ECoR | Metro | NR | NCR | NWR | NER | NFR | SECR | SWR | WCR |SR | SCR | SER | WR |
|
09.09.2014
|
2014/C&IS/Projects/14-15/WP/64
|
Sanction letters for works programme 2014-15 costing above 2.5 crores under Plan Head 17(Computerisation).
NR | SCR | SER | WR
|
19.08.2014
|
2014/C&IS/Projects/14-15/WP/64
|
Sanction letters for works programme 2014-15 costing below 2.5 crores under Plan Head 17(Computerisation).
CR | NR | NCR | SR | SCR |
SER | SECR | WR
|
08.08.2014
|
2012/RBCC/5/3/Digital Certificate
|
Issue of Digital Signature Certificates
|
13.08.2014
|
2011/C&IS/Project/RBCS/7
|
Sanction of the detailed estimate for the work of Upgradation & Web Enabling of Railway Budget Compliation System.
|
08.08.2014
|
2009/C&IS/Project/NTES-Sys Upg/48
|
Detailed Estimate for the work of NTES - System Upgradation.
|
08.08.2014
|
2005/C&IS/WP/Vending Machine (ATVM)
|
Sanction of Revised-Detailed Estimate for Expansion of Automatic Ticket Vending Machines on Indian Railways
|
08.05.2014
|
2010/C&IS/Project/ICMS/Progress/28/Pt.I
|
Sanction of O&M charges for the ICMS for Indian Railways for the year 2013-14
|
24.03.2014
|
2012/C&IS/Project/ICMS-Repl/26/Pt.
|
Sanction of Detailed Estimate of replacement-Augmentation of ICMS Assets
|
21.03.2014
|
2013/C&IS/Project/13-14/ER-ACT PASS/6
|
Sanction of Detailed Estimate of Procurement of Active and Passive Equipment for strengthening Data Channel Connectivity through Railway OFC at 29 UTS locations in Howrah Division
|
21.03.2014
|
2009/C&IS/Oth/CRIS RBS AMC/19
|
Sanction of AMC-ATS of system Hardware-Software and Application Software for Rates Branch System
|
21.03.2014
|
2012/C&IS/UTS/Progress/6
|
Updation of commissioning date of UTS locations.
|
20.02.2014
|
2013
|
2012/C&IS/PMS/Progress
|
Joint Procedure Order (JPO) for installation and Maintenance of Network connectivity for Parcel Management System over Indian Railways.
|
06.09.2013
|
2012/C&IS/Project/ATVM Exp/Det Est-WR/35
|
Western Railway- Extension of automatic ticket vending machines.
|
06.08.2013
|
2013/C&IS/Project/ATVM-SWR/24
|
Detailed Estimate of the work of "South Western Railway-Extension of automatic ticket vending machine".
|
06.08.2013
|
2012/C&IS/Project/351 ATVMs CR/32
|
Central Railway-Extension of automatic ticket vending machine.
|
06.08.2013
|
2013/C&IS/Project/LAW Book 2013-14/25
|
Distribution of outlays among works costing below Rs. 250.00 Lakhs each under Plan Head-17 (Computerization).
|
28.06.2013
|
2013/AC-II/3/1
|
Introduction of new primary units for procurement of Laptops by Officers in classification of Revenue and Capital and other Works Expenditure.
|
24.06.2013
|
2012/C&IS/Project/4th Revised Estimate/FOIS/14
|
Sanction of the 4th revised estimate of the work of FOIS (Freight Operations and Information System)
|
15.01.2013
|
2012
|
2006/C&IS/OTH/Delegation of Powers/36-Pt
|
Delegation of Powers on Information Technology related matters.
|
11.09.2012
|
2002/AC-II/2/10/Vol.II
|
Revised Codal life of assets.
|
22.08.2012
|
2011/C&IS/Project/LAW Book 2012-13/20
|
Distribution of outlays among works costing below Rs. 250.00 Lakhs each under Plan Head -17 (Computerization)
|
29.06.2012
|
2012/C&IS/Project/e-Ticketing IR/9
|
Enhanced E-Ticketing System for Indian Railways
|
12-06-2012
|
2011/C&IS/Project/IRGIS Map/38
|
Indian Railways’ GIS map and geospatial database of Indian Railways assets
|
12-06-2012
|
2011/C&IS/Project/Net Security Infra/31
|
Implementation of Network Security Infrastructure at 06 PRS/UTS datacenters and Railways’ Internet Datacenter (RIDC) in Chanakyapuri, New Delhi as well as implementation of IPSec over Unified Ticketing Network
|
12-06-2012
|
2012/C&IS/Project/Sims/8
|
Safety Information Management System (SIMS)
|
12-06-2012
|
No. 2012/C&IS/Project/ Comp(Ph-II)-DLW/10
|
Implementation of Customized ERP at DLW Varanasi (Phase-II)
|
12-06-2012
|
2012/C&IS/Project/UPG Server-JMP/18
|
Up-gradation of existing system with procurement of one server (Unix Based) compatible with MF COBOL
|
12-06-2012
|
2010/C&IS/Project/Repl. Thin Client-ER/53
|
Replacement of Thin Client (with Sybase Licence – 240 Nos.)
|
12-06-2012
|
2010/C&IS/Project/Repl. Tkt Prn-UTS-ER/52
|
Replacement of UTS Ticket Printers – 600 Nos
|
12-06-2012
|
2011/C&IS/Project/Repl. HDCP PRS/WR/2
|
Replacement of Heavy Duty Chart Printers at various PRS locations
|
12-06-2012
|
2011/C&IS/WP 2012-13/Repl. Of DG Set/CR/2
|
Replacement of 1x625 KVA/500 KW Diesel Generating set complete with standard accessories for stand by power supply arrangement to CPRS,CSTM
|
12-06-2012
|
2012/C&IS/Project/UTS & PRS-Kumbh/13
|
Procurement of UTS/PRS equipment for installation of additional UTS/PRS counter during Kumbh Mela 2012-13
|
12-06-2012
|
2007/RBCC/5/6/Tender Portal
|
Issue of Digital Signature Certificate by NIC for Railway Personnel.
|
06.06.2012
|
No.2002/AC-II/2/10/Vol.II
|
Revised Codal life of assets.
|
15.03.2012
|
No.2011/RBCC/5/6/WebPolicy 2 Pt.
|
Hosting of websites on CRIS servers
|
23/27.01.2012
|
No.2011/C&IS/Committee/Laptops/Pt.II
|
Provision of Laptops to officers in lieu of Desktops
|
23.01.2012
|
2011
|
2007/RBCC/5/6/Tender Portal
|
IR web portal-tender hosting and management.
|
21.11.2011
|
2007/RS(S)/709/10
|
e-waste (Management and Handling) Rules, 2011 (Circular issued from Stores Deptt.)
|
06.07.2011
|
2011/C&IS/Project/LAW Book 2011-12/22
|
Distribution of outlays among works costing below Rs. 250.00 Lakhs each under Plan Head-17 (Computerization).
|
18.05.2011
|
2010/C&IS/Committee/Laptops/3/Pt.1
|
Provision of Laptops to officers in lieu of Desktops.
|
30.03.2011
|
2004/RBCC/5/6/Web Policy/2
|
Posting and System Administration of websites belonging to unit under Ministry of Railways
|
25.01.2011
|
2010
|
2004/RBCC/05/06/Webpolicy-2(Rly)
|
Changes in URL - Migration of Railway websites in newly created IR web portal
|
03.11.2010
|
स.2003/आर.बी.सी.सी/वेब पार्ट -1
|
कंप्यूटर पर हिंदी के प्रयोग से संबंधित सॉफटवेयर तथा फोंटस की समस्या का समाधान.
|
22.10.2010
|
2009/C&IS/Oth/E-waste/29
|
Handling of hazardous wastes.
|
13.09.2010
|
2006/C&IS/PRS/Audit/4/Pt.I
|
Crisis Management Plan of Indian Railways.
|
01.09.2010
|
2004/RBCC/Web Pt.1
|
Bi-lingual updation of website
|
21.06.2010
|
C&IS/PH-17/PRS-1000/Non Rail Head Location/06/10
|
Sanction for the work of "1000 Passenger Reservation System locations in various cities across the country" under the Plan Head 17 (Computerization).
|
14.06.2010
|
2010/C&IS/WP/2010-11/Works less than Rs.250 lakhs/AZR/12
|
Distribution of outlays among works costing below 250.00 Lakhs each under Plan Head-17(Computerisation).
|
13.05.2010
|
2009
|
No.2009/C&IS/Project/PRS 1000 New Terminals/12
|
Sanction for the work of "1000 Passenger Reservation System location in various cities across the country" under the Plan Head 17(Computerisation).
|
08.09.2009
|
2009/C&IS/Project/PRS-1000 New Terminals/12
|
Sanction for the work of "1000 Passenger Reservation System locations in various cities across the country" under the Plan Head 17 (Computerization).
|
02.09.2009
|
No.2009/C&IS/Project/Bio_identi-IR/19
|
Sanction for the work of "Pilot project for provision of Biometric Identification in vital installation and offices over Indian Railways " under the Plan Head 17 (Computerization).
|
25.08.2009
|
2006/C&IS/OTH/Laptop/14
|
Provision of Laptops to officers in lieu of Desktops.
|
10.08.2009
|
No.2008/C&IS/Project/Integrity Server(Itanium)/25
|
Sanction for the work of "Deployment of CONCERT on ITANIUM Servers" under the Plan Head 17(Computerization).
|
09.08.2009
|
No.2009/C&IS/WP/2009-10/Works less than Rs.250lakhs/AZR/4
|
Distribution of outlays among works costing below Rs.250.00Lakhs each under Plan Head-17(Computerisation).
|
31.07.2009
|
No.2004/RBCC/5/6/Web Policy/2
|
Providing details about your official website.
|
28.05.2009
|
No. F(X)II-2009/PW/3
|
Delegation of Powers to General Managers - Powers to sanction IT related works and estimates.
|
16.03.2009
|
No.2009/C&IS/WP 2009-10/Expenditure/3
|
Utilization of allocated funds - Plan head - 17 (Computerization).
|
03.03.2009
|
No.2009/C&IS/WP 2009-10/Expenditure/3
|
Utilization of allocated funds - Plan head - 17 (Computerization) (Excel sheet).
|
03.03.2009
|
2008 and before
|
No. 2008/C&IS/Project/PMS/7
|
Sanction for the work of "Parcel of Computerisation Management System over major stations of Indian Raiways" under the Plan Head-17 (Computerisation).
|
30.12.2008
|
No.2005/C&IS/CCCS for IR/WP 2005-06 Vol.-II (Part)
|
Instructions for regular cleaning of server room and other IT equipment for Control Office Application.
|
08.12.2008
|
- Presentation by S.S.Mathur, GM/IT(CRIS)
|
Upgrading the PRS datacentres - Space requirement.
|
16.12.2008
|
No.2005/C&IS/Rly.Data Channel/pt.1
|
Procurement of Datacom equipment for extension of UTS at ’E’ Category Stations.
|
12.12.2008
|
No.2006/C&IS/Oth/Delegation of Powers/36
|
Delegation of Powers on Information Technology related matters.
|
10.12.2008
|
2007/C&IS/WP 2007-08/Setting of Assessment Centre (Psycho Test)/9
|
Sanction for the work of " Setting up of Computerized Aptitude Test Assessment Centre on Indian Railways" under the Plan Head 17 (Computerization).
|
08.12.2008
|
2007/C&IS/OTH/Ref Doc for PPP/52
|
Sanction for the work of "Unreserved Ticketing Through Mobiles (Pilot at Mumbai and Chennai Sub-urban sections)" under the Plan Head 17 (Computerization)
|
08.12.2008
|
2006/C&IS/WP 2006-07/Web-Portal/12/Pt.
|
Sanction for the work of " Setting up of Web Portal for Indian Railways" under the Plan Head 17 (Computerization)
|
02.12.2008
|
2005/C&IS/Vending Machine/Pt-1/Smart Card
|
Provision of R&D charges of 7.5% to CRIS
|
18.11.2008
|
2000/C&IS/Datawarehouse
|
Instructions regarding items to be charged to "Revenue".
|
18.11.2008
|
No.2005/C&IS/FOIS/AT Supply/Dup/Pt.-1
|
Terminal Management System (TMS) : Directives for supply of electricity through ATs
|
29.08.2008
|
2006/C&IS/WP20027-08/AZR/UTS/10/Pt.
|
Enhancement in the delegation of powers to GMs of Zonal Railways regarding sanction of detailed estimate against the work/ project relating to the IT under the Plan Head -17 (Computerization)
|
18.06.2008
|
2008/C&IS/Project/PMS/7
|
Sanction for inclusion of computerisation of Parcel Booking Offices at Patna Jn. and Danapur Station of East Central Railway as a part of the work of "Computerization of Parcel Management System over major stations of Indian Railways" under the Plan Head 17 (Computerization).
|
13.06.2008
|
2008/C&IS/Project/MMCHGDepot Ph-I/8
|
Sanction for the work of "Phase-I rollout of Maintenance Module for Coaching Depots" under the Plan Head 17 "Computerization"
|
02.06.2008
|
2008/C&IS/WP/2008-09/Works less than Rs.250 lakhs/AZR/1
|
Distribution of outlays among works costing below Rs.250.00 Lakhs each under Plan Head - 17 (Computerization)
|
27.05.2008
|
No.2006/C&IS/Oth/Laptop/14
|
Purchase of software
|
26.05.2008
|
No.2006/C&IS/Project/FOIS/3rd Revised Estimate/1
|
Sanction of the 3rd revision in the FOIS (Freight Operations and Information System) estimate.
|
16.05.2008
|
2006/C&IS/PRS/Audit/4/Pt.1
|
Information Technology Security Policy for Indian Railways
|
06.05.2008
|
No.2007-B-101
|
List of Approved Works for 2008-09 costing below Rs.2.50 crore
|
25.04.2008
|
2006/C&IS/WP2007-08/WIS Phase-II/19
|
Sanction for the work of 'Workshops Information System-Phase-II; under Plan Head 17-Computerisation."
|
24.04.2008
|
2006/C&IS/WP2007-08/AZR/UTS/10/
|
Enhancement in the delegation of powers to GMs of Zonal Railways regarding sanction of detailed estimate against the work/Projects relating to the IT under the Plan Head â?? 17 (Computerization).
|
16.04.2008
|
|
Information Technology Security policy for Indian Railways: Report of the Inter Disciplinary Core Group
|
|
No. 2007/C&IS/Project/FOIS Data/ Channel/6
|
Policy regarding charging of cost on account of hiring of data
channels and other maintenance charges (AMC Charges) for FOIS and other IT applications running on FOIS backbone to ’revenue’ in place of ’capital’- Account Head.
|
04.04.2008
|
|
Minutes of the Meeting on Strategies for Rollout of Parcel Management System held on 25.03.2008 at Rail Bhawan, New Delhi
Agenda of the Meeting on Strategies for Rollout of Parcel Management System
|
27.03.2008
|
|
Parcel Management System Presentation in Board’s office
|
24.03.2008
|
|
Book of Approved Works costing less than Rs.2.50 crore but more than Rs.50 lakh in 2007-08
|
|
No.2003/RBCC/web/pt.1
|
For bi-lingual of all zonal Railways website
|
10.03.2008
|
|
E-Payment of the Railway Freight by Customers
|
|
|
E-payment Facility Through Bank for FOIS
|
|
|
E-PAYMENT OF RAILWAY FREIGHT
|
|
2005/C&IS/Rly. Data Channel/Pt.1
|
Guidelines / Polices on IT.
|
20.12.2007
|
No.2006/C&IS/Oth/CRIS/IT Projects/Target/2
|
Implementation of IT Projects
|
29.11.2007
|
2004/RBCC/5/6/Webpolicy/2
|
Website launching by divisions.
|
17.12.2007
|
No.2004/C&IS/PMS/Prog
|
Procurement of equipments pertaining to Parcel Management System under revenue head
|
10.12.2007
|
2006/C&IS/WP2007-08/AZR/UTS/10/ Pt.
|
Delegation of powers to GMs of Zonal Railways regarding sanction of detailed estimate against the work/Projects relating to the IT under the Plan Head -17 (Computerization).
|
27.11.2007
|
D.O.No.2001/C&IS/FOIS/AM’s committee
|
Guidelines for operation and maintenance of FOIS datacomm equipments
|
30.10.2007
|
No.F(X)II-2007/PW/4
|
Delegation of Powers to General Manager - Revision of Anneuxre-II to Chapter V, Indian Railways Financial Code, Vol.I.
|
21.09.2007
|
2007/C&IS/Comp. of Budget/Pt-07A
|
Allocation of all IT projects to CRIS, empowerment of CRIS and IT Dte of Railway Board.
Corrigendum
|
26.09.2007
01.10.2007
|
2005/C&IS/Rly. Data Channel/Pt.
|
Revised Agreement between Ministry of Railways & RCIL.
|
21.09.2007
|
2002/CRIS/Nomination/Policy/EC
|
Composition of Executive Committee of CRIS
Memorandum of Association of Centre for Railway Information Systems
|
11.09.2007
|
No. 2004/RBCC/5/6/Webpolicy/2
|
Hosting of websites.
|
12.09.2007
|
2004/RBCC/5/6/Web Policy/2
|
Website launching by Divisions.
|
25.07.2007
|
No.2006/C&IS/WP2007-08/UTS Server CE & DMS/16
|
Sanction of the extension of the currency of 62 Gazetted and 209 Non-Gazetted posts of FOIS along with Advisor(Infrastructure) and supporting staff up to March, 2008.
|
22.07.2007
|
2005/RBCC/7/3/Policy
|
Hosting of website on government owned servers
|
06.07.2007
|
N0.2004/E&R/Misc/50(MCDO)
|
Standard format for GMs MCDOs to Board
|
08.06.2007
23.04.2007
|
2007/E&R/400/1
|
Yardstick for gazetted staff in Construction Projects
and
Break up of D&G charges for works of various departments i.e. Civil, RE, Elect. & S&T Departments.
|
29.06.2007
|
2007/C&IS/PRS/IVRS
|
Port for IVRS
|
27.06.2007
|
No. 2007/C&IS/WP/2007-08/Less than Rs.50 Lakhs/AZR
|
Distribution of outlays among works costing below Rs.50.00 lakhs each under Plan Head - 17 (Computerization)
|
04.06.2007
|
No.2006/C&IS/WP2007-08/Web Portal/12
|
Setting up of Web Portal for Indian Railways.
|
30 .05.2007
|
No. 2006/C&IS/WP2006-07/Expenditure
|
Utilization of allocated funds â?? Plan head â?? 17(Computerization)
|
29.05.2007
|
No.2006/C&IS/Oth/Usage of Govt. Tender Portal/38
|
Uploading of Tender on Govt. Tender Poartal.
|
04.05.2007
|
No.2005/RBCC/7/3/Policy
|
IT Security
|
30.03.2007
|
2006/C&IS/OTII/Laptop/1
|
Provision of Laptops to offleers in lieu of Desktops.
|
20-09-2006
|
No.2002/AC-II/1/10
|
Revised Codal life of Assets.
|
24.05.2006
|
|
|
|
99/C&IS/CRIS Matters
|
Execution of IT projects sanctioned by Board
|
30.09.2005
|
2004/RBCC/5/6/Web Policy/1
|
Hosting of Websites on CRIS Servers
|
26.10.2004
|
-
|
IT Vision - 2025 ( Click here for MS-Word format )
|
|
-
|
Web Server Security Guidelines
|
17.08.2004
|
2001/C&IS/Comp/Policy
|
Delegation of Powers for Information Technology
|
07.12.2001
|