2022
|
Letter No.
|
Date
|
Subject
|
2013/Sig/M/82nd SSC
|
09.05.2022
|
Item no. 1159 of 82nd SSC Metg 2012 regarding inclusion of few improvements in specification of Electric Point Machines and Electric Point Motor & adoption of new technology point machines.
|
2019
|
STS/E/Motor Operation of NI Points.
|
07.02.2019
|
Motor Operation of Non-Interlocked Points.
|
2018/Sig/SGF/9/Thick Web/Loose
|
02.04.2019
|
Issues regarding installation and maintenance of Thick Web Turnouts.
|
2018/Sig/17/35-Sig cable/1
|
23.07.2019
|
Requirement of Cables Relays and point Machines during the FY 2019-20
|
2018
|
2010/Sig/SGF/Point Machine
|
11.06.2018
|
Provision of Point machine with clamp Lock at Thick web Switches.
|
2008/Sig/SGF/9/Thick Web
|
01.11.2018
|
Issues regarding Thick Web Turn Outs.
|
2017
|
2017/Sig/1/Pt.CTT
|
06.02.2017
|
Modifications to the Point Operation and Detection Circuits.
|
2010/SIG/SGF/Point-Machine
|
29.05.2017
|
Demand and Scale plan of Point Machine, manufactured by Podanur Workshop, Southern Railway
|
2013/Sig/Specifications
|
04.12.2017
|
Provision of Point Machine with Clamp Lock at Thick Web Switches.
|
2008
|
2008/Sig/SGF/9/Thick Web
|
03.01.2008
|
Provision of Point Machine with Clamp Lock at Thick Web Switches.
|
2003/CE-II/TS/2 Pt.1
|
15.02.2008
|
Advance correction slip No109 to the Indian Railways Permanent Way Manual -1986 Para -202-(1.)
|
2007
|
2007/Sig/H/2/Pt
|
24.01.2007
|
Increases of Speed on the Turnouts.
|
109-SIG/153/9/PM
|
31.01.2007
|
Detection scheme for Electrically Operated Points.
|
2007/Sig/H/2/Pt
|
09.02.2007
|
Increases of Speed on the Turnouts.
|
Track/21/07/0301/7/2/TWS
|
11.06.2007
|
Procurement of Thick Web Switches on Indian Railways.
|
2006
|
CT/PTX/TO Speed
|
13.10.2006
|
Increases of Speed on the Turnouts
|