2023
|
Letter No.
|
Date
|
Subject
|
2022/Sig/33/1/SEM/Misc |
31.03.2023 |
Addendum and Corrigendum Slip No. 1 of the IRSEM, July 2021 – Para no. 9.2.1, 9.2.2, 22.3.1 |
2020 |
2018/sig/LX/2
|
12.11.2020
|
Reliability improvement measure at interlocked LC Gates – Provision of Sliding Booms at mid section Interlocked LC Gates
|
2019
|
2018/Sig/LX/2 |
11.11.2019 |
Reliability Improvement measures at Interlocked LC gates – Provision of Sliding Booms. |
2010/Sig/LX/2
|
13.06.2019
|
Installation of Additional Safety Gears at Manned Level Crossing Gates.
|
2018/Sig/7/6-RVNL/1
|
14.08.2019
|
Sliding Boom for Level Crossings Standaridzation
|
2018
|
2017/Sig/WP/Misc.
|
26.03.2018
|
Interlocking of manned level crossings with high TVUs.
|
2014/Sig/LX/2
|
16.04.2018
|
Interlocking of mid sections Manned level crossings.
|
2015/CE-II/CS/2
|
08.05.2018
|
Correction Slip No. 144 to the Indian Railways Permanent Way Manual.
|
2017/SIG/WO/Misc.
|
10.05.2018
|
Interlocking of Manned level crossing with high TVUs.
|
2010/Sig/LX/2
|
18.05.2018
|
Interlocking of LC Gates.
|
2009/Sig/GR/1/Pt.1
|
11.06.2018
|
Correction Slip No. 143 to the Indian Railways Permanent Way Manual.
|
2016
|
2012/Sig/PCDO/Misc
|
21.12.2016
|
Inclusion of Electrical Lifting Barriers (nos.) in Asset details of PCDO.
|
2010
|
2009/CE-1/LX/116
|
21.12.2010
|
Manning and Interlocking of unmanned Level Crossing gates in Automatic Territory.
|