2023
|
Letter No.
|
Date
|
Subject
|
2020/Sig/IRISET |
31.05.2023 |
Special courses on ‘Kavach’ for Dy.CSTEs/Sr.DSTEs |
2020/Sig/TCAS/Estimates (e3316629) |
18.05.2023 |
Components of Kavach/CTC inclusion in yard remodeling/ABS/LC gate/Signalling works |
2022/Sig/33/1/SEM/Misc |
31.03.2023 |
Addendum and Corrigendum Slip No. 1 of the IRSEM, July 2021 – Para no. 9.2.1, 9.2.2, 22.3.1 |
2022 |
2021/Sig/Committee/KavachmaintenanceCost
|
31.01.2022
|
EPC Tender for provision of TCAS in New Delhi Mumbai, New Delhi Howrah sections and other section of IR.
|
2021
|
2013/Sig/TCAS/status
|
18.01.2021
|
EPC Tender for provision of TCAS in new Delhi –Mumbai, New Delhi- Howrah sections and other sections of IR.
|
2014/Sig/ATP/IR
|
18.02.2021
|
Approved scheme for TCAS & Automatic Signalling.
|
2014/Sig/ATP/IR
|
19.02.2021
|
Committee for interoperability of features between TCAS & ETCS level-2
|
2014/Sig/TPWS/160 kmph/Pt./loose
|
30.03.2021
|
Raising speed to 160 kmph on new Delhi-Mumbai central route.
|
2020
|
2016/Sig/Modernisation
|
02.01.2020
|
Provision of Modern Automatic Train Protection System.
|
2013/Sig/TCAS/Status
|
16.01.2020
|
Request for approval for engaging consultancy services at international level to develop interoperability between ETCS Level-2 and TCAS and other requirement for Indian Railways.
|
2013/Sig/TCAS/status
|
30.01.2020
|
Execution of works of TCAS on 1200 km on SCR- Monitoring.
|
2019/Sig/17/36/ETCS L-2(e-3304767)
|
17.04.2020
|
Applying for associate membership of EULYNX for designing of Interface between EI/Relay Interlocking and RBC in the project of ETCS L-2
|
2019
|
2014/Sig/TPWS/160KMPH/Loose
|
09.10.2019
|
Signalling and Telecommunication works in connection with raising of speed to 160 KMPH in Delhi- Mumbai and Delhi –Kolkata Section preparation of Detailed Estimates
|
2017/Sig/Modernization Signalling
|
24.10.2019
|
Organizing Technical Workshop on Automatic Train Protection (ATP) System with special focus on ETCS Level-2.
|
2014/Sig/TPWS/160 KMPH/Loose
|
28.10.19
|
Signalling and Telecommunication works in connection with raising of speed to 160 KMPH in Delhi – Mumbai and Delhi – Kolkata Sections – preparation of Detailed Estimate.
|
2017/Sig/Modernization/Signaling
|
31.10.2019
|
Sanction of Signalling project deliberated in 34th GCM.
|
2019/Sig/17/36/ETCS L-2
|
13.11.2019
|
Interoperability of TCAS and ETCS Level-2 ATP Systems.
|
2017/Sig/Modernization/Signalling
|
22.11.2019
|
Points notes during Hon’ble MR’s interaction with Member of Railway Board on 06.11.2019
|
2019/AM(Sig)/Insp Note/1
|
29.11.2019
|
Recorded Note on CBTC with AM (SIG),Railway Board during the discussion held on 16.11.2019 at MRVC.
|
2019/Sig/17/36/ETCS L-2
|
04.12.2019
|
Inter –Operability of TCAS and ETCS Level-2 ATP System.
|
2017/Sig Modernization
|
10.12.2019
|
Pilot Project of Provision ETCS Level-2 on four Sections of Indian Railway.
|
2017
|
2013/Sig/TCAS/Status
|
12.05.2017
|
Field trial for development of TCAS: E70 & CCB type brake interfaced Locos (WAP-5) at speeds up to 160 KMPH.
|
2014/Signal/PMO
|
07.07.2017
|
Inclusion of proposal of TPWS works (ETCS L-I) for Trunk routes in works programme 2018-19.
|
2016
|
2016/Mobility(S&T)/9/1
|
29/31.08.2016
|
Mission Raftaar - Data for Signalling Asset Reliability and Road Map.
|
2015
|
2013/Sig/TPWS
|
17.03.2015
|
Execution of sanctioned TPWS works on Indian Railways.
|
2013/Sig/TPWS.
|
22.06.2015
|
Provision of Train Protection & Warning System (TPWS) based on ETCL-1 Technology.
|
2010
|
2010/Sig/OBTPS
|
27.09.2010
|
On Board Train Protection System.
|
2005/Sig./TPWS/1(DLI-AGC)/Vol.II
|
12.10.2010
|
TPWS projects on Railways.
|