Search Documents(Date Wise)   Search | Hindi | Increase Font size Increase Font size Increase Font size|
Indian Railway main logo
भारतीय रेल राष्ट्र की जीवन रेखा...
INDIAN RAILWAYS Lifeline to the Nation...
National Emblem of India
National Emblem of India
About Indian Railways
   Corporate Overview
      Railway Board Directorates
         Signal
            Policy Letters & Circulars
               EI


 
EI

2023

2012/Sig/ATSS

27.06.2023

Compliance of stipulations – TSAA of EI & other sanctions at PCSTEs level.

2012/Sig/ATSS/Pt.

28.02.2023

TSAA of Electronic Interlocking

2021/Sig/7/PSUs

05.01.2023 MRVC for approval of interface/logic circuit for EIs and PI/RRI

2022

2018/Sig/36-SD/1/Pt 18.11.2022 Nomination of Committee member for “Standardization of typical circuits for EI”.

2021

2013/Sig. Vig/01 (Part)

21.01.2021

System Improvement in works contract for commissioning of Electronic Interlocking (EI) system.

2021/Sig/25-Conf/5/SSC

26.02.2021

Special signal standards committee (SSC)’s meeting for EI.

2020

2012/Sig/ATSS

10.01.2020

Technical System Application Approval (TSAA) of Electronic Interlocking (EI)

2020/Sig/35-Policy/4/Interlocking

04.11.2020

Provision of isolation for simultaneous reception at stations due to chance in interlocking from std-I to std-II (R) for EI

2013/Sig/01/(pt)Dup

19.11.2020

System Improvement in works contract for commissioning of Electronic Interlocking (EI) System

2013/Sig/Vig/01(Part)

30.12.2020

System Improvement in works contract for commissioning of Electronic Interlocking (EI) System

2019

2008/Sig/SGF/4/EI/Gen/Pt.

08.03.2019

Implementation of recommendations contained in the report to bring “Self Reliance on Electronic Interlocking (EI)”In Indian Railways.

2008/Sig/SGF/4/EI
/Gen/Pt.1

06.06.2019

Automation in Signaling Drawing - Self Reliance in Electronic Interlocking (EI)

2010/Sig/SGF/EI
(MEDHA)

06.06.2019

Medha make EI model MEI 633: (i) Upgradation to executive software to version 1.2(ii) Restoration of Hot Standby mode.

2008/Sig/SGF/4/El/GEN

28.08.2019

EI OEMs Organization chart for post commissioning maintenance

2008/Sig/SGF/4/EI/GEN/pt-1

04.11.2019

Automation in Signal Drawing-Self Relince in Electronic Interlocking.

2014/Sig/M/83rd SSC

11.11.2019

Block working built into Electronic Interlocking.   

2018/Sig/36-SD/1

20.11.2019

Standardization of Typical circuits for Electronic Interlocking.

 2008/Sig/SGF/4/EI/GEN

19.12.2019

Integrating Train operation into Electronic Interlocking (EI).

2018

2018/Sig/1/Sig-Equip/IPS/1.

12.01.2018

Siemens Electronic Interlocking-Provision of newer version power supply card PSU 24.

2011/Sig/EI/Policy.

22.03.2018

Review of Electronic Interlocking (EI) Application Data Design for achieving uniformity across approval vendors.

2008/Sig/SGF/4/EI/GN/Pt.1

03.08.2018

Self-Reliance on Electronic Interlocking (EI).

2017

STS/L/SSI/General

10.03.2017

Implementation of Recommendations contained in the report to bring “Self-Reliance on Electronic Interlocking (RI) in Indian Railways.

2008/Sig/SGF/4/EI/GEN

19.05.2017

Non 0bservation of General and Subsidiary Rules while Undertaking yard remodeling.

2013/Sig/IRSET.

09.08.2017

Review of Electronic Interlocking (EI) Application Data Design for achieving uniformity across approval vendors.

2016

2003/SIG/G/5

28.04.2016

Policy on type of interlocking to be adopted at stations provided with centralized operation of points and signals.

2008/Sig/SGF/4/EI/Gen/Pt.1

16.08.2016

Implementation of Recommendations contained in the Report to bring “Self-Reliance on Electronic Interlocking (RI) in Indian Railways”

2012/Sig/ATSS

06.10.2016

Technical System Application Approval (TSAA) of Advanced Technology Signalling: - EI installations up to 100 routes.

2015

2012/Sig/ATSS

02.09.2015

Technical System Application Application approval of Advanced Technology Signaling Systems.

2011/ Sig/EI/Policy

15.04.2015

Incorporation of condition or MoU with OEMs (RDSO approved sources) in technical eligibility criteria in tender award of  works contract for Electronic Interlocking (EI)

2012/Sig/ATSS

16.04.2015

Technical System Application Approval (TSAA) of Advance Technology Signalling System.

2008/Sig/SGF/4/EI

30.06.2015

Failure of EI at Purna due to lightning.

2012/Sig/ATSS

02.09.2015

Technical System Application Approval (TSAA) of Advance Technology Signalling System.

2012/Sig/ATSS

26.11.2015

Signalling Installations at Major Junction Stations (> 100 routes).

2012

2012/Sig/ATSS

03.05.2012

Technical System Application Approval (TSAA) of Advance Technology Signalling System.

2010

2008/Sig/SGF/4/EI/GEN

22.07.2010

Microlock-II Approval of version CC3.0.

2009

2008/SIG/SGF/4/EI/GEN

29.07.2009

Provision of Electronic Interlocking System.

2006

2003/Sig/G/5.

14.09.2006

Policy on type of interlocking to be adopted at stations provided with centralized operation of points & Signals.

2005

2005/Sig/SGF/4/EI

01.06.2005

Improvement in Electronic Interlocking (SSI) Equipment- Micro Lock-II.

2005/Sig/SGF/4/EI

14.10.2005

Induction of new technologies for Electronic Interlocking.

 




Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 31-03-2023  

Admin Login |  Site Map  |  Contact Us  |  RTI  |  Disclaimer  |  Terms & Conditions  |  Privacy Policy  Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.