2023
|
Letter No.
|
Date
|
Subject
|
2021/Sig/Estimates/DPR |
22.06.2023
|
Checklist for S&T sub estimates submitted with DPR.
|
2023/GS/Sig./Typical Abstract Estimate
|
01.05.2023 |
Preliminary cost estimation for preparation of DPR for Signaling works. |
2020/Sig/TCAS/Estimates |
18.05.2023 |
Components of Kavach/CTC inclusion in yard remodeling/ABS/LC gate/Signalling works.
|
2017/Sig/WP/Double Distant |
11.05.2023 |
Raising of Sectional Speed to 130 kmph on BG Routes over Indian Railways.
|
2022
|
2021/Sig/KAVACH/EPC
|
21.01.2022
|
Standard EPC Tender Document for Single Stage Two packet System
|
2021/Sig/Estimates/DPR (e file-3363771)
|
25.08.2022
|
Checklist & Appraisal Performa for S&T sub estimates.
|
2020/Sig/31/Misc/24/Precautions |
19.10.2022 |
Winter and fog Precautions for Signalling Systems. |
2017/Sig/WP Progress/1
|
23.11.2022 |
Works to be sanctioned within the Railway powers. |
2021
|
2020/Sig/ph-29/Zonal Exe. Auth.
|
14.01.2021
|
Change in nodal authority for plan Head 2900 (Road Safety Works Level Crossings) at Zonal Railways.
|
2020/Sig/CBTC
|
19.01.2021
|
Execution of work of CBTC on Mumbai suburban section by MRVC setting up of a Core group
|
2020/Sig/nomination East Kidwai Nagar, New Delhi
|
26.02.2021
|
Letter of Acceptance for executive of Signalling works.
|
2020/Sig/nomination Saket, New Delhi
|
26.02.2021
|
Letter of Acceptance for executive of Signalling works.
|
2020/Sig/nomination Gurgaon, Haryana
|
26.02.2021
|
Letter of Acceptance for executive of Signalling works.
|
2020
|
2016/Sig/PMO/1
|
01.01.2020
|
Expenditure Efficiency: Action Plan for reducing wasteful expenditure.
|
2017/Sig/Signallng/Modernization
|
27.02.2020
|
Workshop on Railways and Defence Sector to promote Steel usage in the country.
|
2018/E&R/3(2)/1
|
04.03.2020
|
D&G charges in various works estimates
|
2018/Sig/17/16/1
|
13.03.2020
|
Price Variation Cause for 6 Quad Cable as per IRS: TC 30.2005 (Ver.-1) Amd
|
2021/Sig/WP/IR/1
|
16.04.2020
|
Umbrella work for provision of Remote Diagnostic & Predictive maintenance system at 100 stations on Golden Quadrilateral & Golden Diagonal (GQ & GD) routes
|
2018/Sig/7/6-RVNL/1
|
16.06.2020
|
Empowering RVNL for approval of design documents of S&T installations on Indian Railway for doubling/ tripling/ new line projects being executed by RVNL
|
2020/Sig/7/3-RITES/1
|
06.07.2020
|
Empowering RITES Ltd for Approval of Design documents for S&T installation under RITES project
|
2018/Sig/17/16/1
|
05.08.2020
|
PVC clause for 6 Quad cable as per IRS: TC30/2005 with latest amendments
|
2020/Sig/WP/RE Works
|
18.09.2020
|
Elimination of balance Mechanical Signalling installations on IR
|
2020/Sig/35-Policy/4/Interlocking
|
20.10.2020
|
Implementation of Standard Layout.
|
2016/Sig/PMO/1
|
11.11.2020
|
Monitoring of action plan suggested by CVC for Indian Railways
|
2019
|
2019/Sig/31/17-Plg Matters
|
23.01.2019
|
Directions given by Hon’ble MR during presentation on 07.12.2018.
|
2012/Sig/M/7/Gen(D AC)
|
17.07.2019
|
Procurement of Signalling items against works contract from RDSO approved vendor list
|
2018/Sig/7/6/RVNL/1
|
26.07.2019
|
Empowering RVNL for approval of Design documents of S&T installations
|
2018/Sig/7/6/RVNL/1
|
28.10.2019
|
Emprowering RVNL for Approval of Design documents of S&T installation in BZA-GDV-BVRM-NDD-NS-MTM Doubling,UR-MBNR and MMTS phase ii Dubling Project on South Central Railway.
|
2018
|
2017/Sig/WP/Misc.
|
26.03.2018
|
Interlocking of manned level crossings with high TVUs.
|
2017/SIG/WP/Works Progress
|
10.05.2018
|
Work to be sanctioned with in the Railway Power
|
2014/sig/siding
|
11.09.2018
|
Levy of D&G Charges- SKS Power Generation (Chhattisgarh) Ltd. Taking off from mod section between Robertson and Bhupdeopur station in Bilaspur Division.
|
2017/Sig/3/Misc./GST
|
17.09.2018
|
Erroneous Income Tax Deduction effected on Dues receivable by Railways.
|
2018/Sig/31/11-REMatters/1
|
13.11.2018
|
Assistance required for Faster execution of S&T Works.
|
2017/Sig/Misc.
|
18.12.2018
|
Up-gradation of Signaling and Interlocking on HDN/HUN Routes.
|
2017
|
2016/SIG/WP/Work Review/1
|
10.02.2017
|
Review of progress of works and finalization of targets.
|
2017/Sig/WP/IR/RF/& IDS
|
03.04.2017
|
Execution of Works for Trial of Rail fracture & Intrusion detection system on N.C Railway & NF Railway.
|
2016/Sig./Works Review
|
11.04.2017
|
Execution of Works for under Plan head 33.
|
2017/Sig/3/ Genl/1
|
01.06.2017
|
Execution of Engineering Works along the Railway Tracks.
|
2017/Sig/3/Misc/GST.
|
31.07.2017
|
Implementation of introduction of Goods & Service Tax (GST) on the ongoing contracts.
|
2016/SIG/WP/Works Review/1.
|
21.08.2017
|
Augmentation/Creation of Training facilities for S&T personnel.
|
2017/Sig/WP/RE Works.
|
29.08.2017
|
Replacement / Modification in Signalling to suit RE.
|
2015/Sig/Vision/2030.
|
30.08.2017
|
Information relating to setting of specific goals of signal and Telecommunication to be achieved by 2022.
|
2017/SIG/WP/Misc.
|
31.08.2017
|
Inclusion of proposals for works in PWP 2018-19.
|
2017/CE-I/CT/7/GST
|
27.10.2017
|
Impact of GST Existing Works Contracts.
|
2017/SIG/WP/Misc.
|
28.11.2017
|
Modernization of Signaling and Telecommunication systems on golden Quadrilateral and Diagonals.
|
2016
|
2014/Sig/CRB/Projects/Pt. II
|
06.01.2016
|
S&T Works in connection with targeted doubling/third line projects
|
D.O.2014/Sig/PMO
|
13.01.2016
|
Change of allocation of sanctioned S&T works to capital
|
2013/Sig/GCC
|
09.06.2016
|
Price Variation Clause in Signalling Contracts
|
2016/Mobility(S&T)/9/1
|
29/31.08.2016
|
Mission Raftaar - Data for Signalling Asset Reliability and Road Map.
|
2015/Sig/WP/Alloc./SER
|
19.09.2016
|
Change of Allocation of Sanctioned signaling Works from DRF/DF to Capital/EBR.
|
2015
|
2014/Sig/FDI
|
18.06.2015
|
Sectoral guidelines for Domestic/Foreign Direct Investment in Railways.
|
2010
|
2008/Sig/Estimate/Gen
|
03.06.2010
|
Preparation of Abstract Estimates.
|
2008
|
2008/SIG/RE/(Works)
|
25.06.2008
|
Execution of S&T Works in RE Areas.
|
2007
|
2007/SIG/SGF/2
|
23.04.2007
|
Guidelines for floating and finalization of Composite tenders for S&T projects/works.
|
2000/RE/161/11.
|
01.05.2007
|
Execution of S&T works in RE area.
|
2005
|
2005/W-I/RVNL/5
|
12.05.2005
|
Timely and smooth execution of RVNL project.
|
2004/SIG/G/7
|
13.12.2005
|
Execution of Engineering works along the railway Track.
|