Search Documents(Date Wise)   Search | Hindi | Increase Font size Increase Font size Increase Font size|
Indian Railway main logo
भारतीय रेल राष्ट्र की जीवन रेखा...
INDIAN RAILWAYS Lifeline to the Nation...
National Emblem of India
National Emblem of India
About Indian Railways
   Corporate Overview
      Railway Board Directorates
         Signal
            Policy Letters & Circulars
               Signalling in General
                  General


 
General

2023

Letter No.

Date

Subject

2020/Sig/31/Misc/24/Precautions 17.10.2023 Winter and Fog precautions for Signalling System.
2023/Sig/17-SigEquip/Maintenance 24.08.2023 Signalling gears description writing and painting
2020/Sig/IRISET 08.08.2023 Competency in carrying out Signalling Modification/Alteration works.
2021/Sig/21/Safety Performance 28.06.2023 Verification of Indoor and Outdoor writing work details of Signalling gears at stations.
2022/Sig/33/1/SEM/Misc. 20.06.2023 CS no. 2 of India Railway Signalling Engineering Manual (July 2021 Edition)
2021/Sig/21/Safety Performance 10.06.2023 Joint Procedure Order Disconnection/reconnection for S&T gears.
2020/Sig/21/Safety Performance 10.06.2023 Issues related with Safety of Signalling.
2017/Sig/WP/Works Progress/1 18.05.2023 Gazette Notification for exemption in ‘The Railway Act 1989 Dispensation of CRS sanction for identified Signalling works`.
2020/Sig/21/Safety Performance 17.05.2023 Instruction for safe working in Relay Room at Stations Cabins.
2020/Sig/SGF/7 30.03.2023 Proposed criteria for indigenous development of Software embedded system except systems having cab mounted equipments.
2022

2020/Sig/31/Misc/24/Precautions

19.10.2022 Winter and fog Precautions for Signalling Systems.

2020/Sig/31/Misc/24/Precaution

06.04.2022

Summer & Monsoon Precautions for Signalling Systems

2022/Sig/CoE

27.06.2022

Role & Responsibilities of Center of Excellence (CoE)

2022/Sig/19-FRPCPY/12

15.07.2022

Signalling Assets & FRPCPY methodology.

2020/Sig/17/Procurement

27.07.2022

Procurement Policy of S&T items for projects.

2012/Sig/S&T/Shield

20.09.2022

Revised Criteria for selection of Best Zone for S&T Efficiency Shield.

2017/Sig/WP Progress/1

23.11.2022 Works to be sanctioned within the Railway powers.

E(MPP)2021/1/16

28.12.2022 Norms/yardstick for Non-gazetted Group C Signalling staff.

2021

2020/Sig/12-SFTYMTR/1/CCRS/CRS

11.01.2021

Restrictions imposed by CRS/WC/CCG in replacements works.

2019/Sig/17/36/ETCS L-2

19.02.2021

Associate membership of EULYNX by RDSO.

2020

201/Sig/Safety Performance 

07.01.2020

Disconnection Memo.

2019/Sig/25-Conf/1

14.01.2020

Proceedings of Performance  Review Meeting of CRB & Board  Members with all  GMs & DRMs through Video Conference (VC) on 24.12.2019

2019/Sig/33/1/SEM-II/Misc

30.01.2020

Revision / Re-issue of  IRSEM Pt I & Pt II.

2020/Sig/IMPRINT

17.02.2020

Impacting Research Innovation and Technology (IMPRINT)

2015/Sig/SF/1

24.02.2020

Asset Performance

2020/Sig/IMPRINT

11.03.2020

Impacting Research Innovation and Technology (IMPRINT)

2017/Sig/Moderzation/ Signalling

16.03.2020

Design & Development of Artificial Intelligence Powered Systems to improve RAMS functionality of S&T system

2019/Sig/33/1 SEM-II/Misc

21.04.2020

Nomination of Sub Committees for Revision / Re-issue of IRSEM Pt- I & Pt-II

2012/Sig/SGF/7/Pt (e-3080586)

28.04.2020

Cross Acceptance/ Approval policy

2019/Sig/26-A/SCR/04

01.05.2020

Route Release by passage of train- SEM Pt- II para 21.5.8

2020/Sig/IMPRINT

19.05.2020

IMPRINT for Indian Railways

2020/Sig/13-CDR/10/OHD

12.06.2020

Open House Discussions with S&T Field Supervisors, Maintainers and Assistant (S&T) over all Zonal Railways

2019/Sig/33/1/SEM-II/Misc

12.06.2020

Co-opting of following officers for reviewing and updating of IRSEM

2020/Sig/31/Misc/24/Precautions

16.06.2020

Monsoon Precautions for Signalling Systems

2020/Sig/RDSO/EOI

24.06.2020

Calling of Expression of Interest by  RDSO for various Signalling items

RDSO-TELE0LKO(SPEC)

/6/2020-TelecomDirectorate

/RDSO

 

21.07.2020

Revision of RDSO Specification

2020/Sig/3-WP/6/2020-21

21.08.2020

Development of IOT based Condition Monitoring and Predictive Maintenance platform for Indian Railways

2020/Sig/WP/RE Works

18.09.2020

Elimination of balance Mechanical Signalling installations on IR

2019

2016/Sig/WS

04.04.2019

Minutes of Audio Conference held on 01.04.2019 by AM/Signal with CWM’s OF Signal Production Units in connection with Modernization of S&T Workshops.

2004/Sig/W/5

27.05.2019

Provision of Automatic Fire Detection and Alarm System.

2017/Sig/SEM-II/Misc.

29.05.2019

Joint Procedure Order to be followed in cases of infringement of minimum distance between OHE mast and Signal post.

2012/Sig/M/7/Gen(D AC)

17.07.2019

Procurement of Signalling items against works contract from RDSO approved vendor list

2011/Sig/RHS/AT

01.08.2019

Location of Signals-Provision in SEM

2017/Sig/Modernization/Signalling

21.08.2019

Development of common protocol for various software based railway equipments-projects for Research

2015/Sig/A/Fire

09.09.2019

Provision of Automatic Fire Detention and alarm system

2016/Sig/Board Meeting

12.09.2019

Strategy/action plan for achieving operating ratio of 95%/90% in 2019-20

2017/Sig/SEM-II/Misc

12.09.2019

Condonation of Signal Locations having less spacing between OHE structure and Signal Post

2019/Sig/34/GR/1

25.09.2019

Provision of intermediate Block Hut in Signal Line Section

2016/Sig/Board Meeting

03.10.2019

Strategy action plan for  achieving operation ratio of 95%90% in 2019-20

2015/Sig/SF/Punctuality

11.10.2019

Reliability Improvement Measures

2016/Sig/Winter Precautions/1

28.10.2019

Winter and Fog precautions for Signaling Systems.

2012/Sig/PRIME/1

29.10.2019

Plan for Reliability Improvement and Maintennce Effectiveness Targets.

2015/Sig/SF/1

07.11.2019

ONE Page Report (OPR)of Signalling and Interlocking Failures.

2013Sig/SF/1/NI

11.11.2019

Speed of train during Non- Interlocking working.

2012/Sig/PCDO/Misc

26.11.2019

Submission of BPAC position.

2019/AM(Sig)/Insp. Note/2

29.11.2019

Recorded Note of AM(Sig) Railway Board’s inspection of Train Management System, Mumbai Division, Central Railway on 16.11.2019. 

2017/Sig Modernization

18.12.2019

Mapping of Aptitude of officers in the area Modern Signaling.

2017/Sig/WP/RE works

18.12.2019

Approval for use Podanur type TLBI with UFSBI in 25KV RE area on D&E route in Single Line section.

2014/Sig/TPWS/160KMPH/Loose

26.12.2019

Minutes of meeting held on 16.12.2019 in Railway Board inconnection with preparation of detailed Estimates for the works of raising of speed up to 160kmph on Delhi-Mumbai and Delhi –Kolkata routes

2015/Sig/E/Non-Gaz/1

30.12.2019

Open house discussion with S&T field supervisors, Maintainers & Helpers.

2013/Sig/G/2/RDSO

30.12.2019

Agenda Item for Maintenance Study Group Meeting (MSG).

2018

2013/Sig/SF/1/NI

19.04.2018

Proposal for improved train operation during non-interlock working.

2017/SIG/WO/Misc.

10.05.2018

Interlocking of Manned level crossing with high TVUs.

2018/Sig/31/11-REMatters/1

13.11.2018

Assistance required for faster execution of S&T Works

2012/Sig/PCDO/Misc.

25.06.2018

Submission of PCDO to Board (DG/S&T) latest of 5th of every Month.

2012/Sig/SF/2(Policy)

14.09.2018

Commissioning of New Works.

2012/Sig./PCDO/Misc.

25.10.2018

Discontinuation of hard copy of few Monthly/Quarterly positions being sent to Railway Board (DG/S&T).

2011/Sig/E-Gaz/1

13.11.2018

Inclusion of requirement of officers and staff in RVNL on deputation in the assessment of vacancy of selection/requirement being made by zonal railways.

2018/Sig/31/11-REMatters/1

13.11.2018

Assistance required for Faster execution of S&T Works.

2017/Sig/WP/RE Works

20.11.2018

Execution of S&T Works in RE Areas.

2017/Sig/Misc.

18.12.2018

Up-gradation of Signaling and Interlocking on HDN/HUN Routes.

2016/Sig/1/SMMS

28.12.2018

Signaling Maintenance Management System.

2017

2016/Sig/Safety/Perf/Safety Rev.(2-27.10.16)

05.01.2017

Special safety review and Safety audit of Zonal Railways-deficiencies observed during the Audit.

2003/Sig/SEM/3 (Pt)

02.02.2017

Increasing of speed of passenger trains to 200Kmph.

2012/Sig/Safety Performance/1(Pt)

13.02.2017

Safety in train operation.

2014/Sig/SGF/SF/ Summer Precautions

10.03.2017

Summer Precautions.

2012/Sig/PRIME/1

14.03.2017

Revised Targets for year 2017-18 of Plan for Reliability Improvement and Maintenance Effectiveness (PRIME) annexure in PCDO.

2015/Sig/Vision 2030

29.03.2017

Safety Plan- Indian Railway’s Short Term and Long Term Safety Plan.

2014/Sig/PMO

12.04.2017

Workshop on Adaption & Sustainability of Modern Technologies in Railway Signalling-Foucs on Skill Development & make in India.

2006/SIG/Roll Diagram

13.04.2017

Inclusion of details of various assets in System Map.

2013/Sig/Safety/1 (CRS)

24.04.2017

Replacement of old Signal Gears.

2015/Sig/Air Conditioning

01.05.2017

Provision of Air Conditioning for Signal Installations.

2017/Sig/NR/1

04.05.2017

Completion of Indian Railways Book and Annual Reports & Accounts for 2016-17.

2017/Sig/2/Double Distant Aspect.

05.05.2017

Display of Top Yellow in case of blanking of Bottom Yellow (Caution Aspect) for Inner distant signal in double distant signal.

 2014/Sig/Std.Comm/Rly..

12.05.2015

Standing Committee on finance on Demand for grants 2016-17 recommendations on widening tax base to reach a reasonable tax –GDP ratio.

2015/Sig/SF/Monsoon Precautions

17.05.2017

Monsoon Precautions for Signalling Systems.

2017/AM (Sig)/KRCL/1

02.06.2017

S&T Incidents affecting punctuality of Trains.

2016/Sig/WS

07.06.2017

CSTEs and CWMs / Officers In-charge meeting of Signal Production Units (SPU)/Workshops.

2016/SIG/Board’s Meeting

14.06.2017

Board’s Safety Review Video Conference with GMs of Zonal Railways and CMD/KRCL.

2015/Sig/Air Conditioning

16.06.2017

Provision of Air Conditioning for Signalling installation.

2007/SIG/Non-Gaz/1/Norm.

19.06.2017

Long duration Signalling Failures in Railways.

2012/Sig/PRIME/1

22.06.2017

Information regarding total populations to be done in PRIME Vs completed.

2015/sig/WG/Standardize layout.

12.07.2017

Audit Profile of Signal Directorate and also of Telecom Directorate.

2016/Sig/Safety/1(CRS)

24.07.2017

Replacement of Old Signal Gears.

2014/Sig/W/5.

31.07.2017

Minutes of Special Board Meeting held on 11.07.2017.

2014/Sig/High Speed.

31.07.2017

Running of ‘Tejas’ trains on Konkan Railway Routes.

2015/Sig/Budget/Task Force.

03.08.2017

Report of the Task force on Safety Reg.

2017/Sig/WP/Double Dist.

22.08.2017

Provision of second Distant Signal on ‘B’ Route.

2017/Sig/WP/Double Dist.

29.08.2017

Provision of second Distant Signal on ‘B’ Route.

2016/SIG/WS.

31.08.2017

Provision of ERP system for 6 Signal Production Units (SPUs) located at Byculla, Podnur, Mettuguda, Ghaziabad, Gorakhpur and Howrah.

2017/Sig/PCDO/Misc.

12.09.2017

MTTR, MTBF & FRPCPY of SSDAC &, MSDAC & HASSDAC.

2013/Sig/Specification

14.11.2017

Provision of Fire Suppression System

2015/SIG/SF/1

04.12.2017

Increase in Signal incidences.

2013/Sig/A/A&Rs

13.12.2017

Accidents due to negligence of S&T Staff.

2016

2003/SIG/G/5 

28.04.2016

Policy on Type of Interlocking to be adopted at stations provided with Centralized operation of Points and Signals

2014/Sig/SF/Summer Precautions

03.05.2016

Summer and Pre-Monsoon Precautions.

2016/Sig/SF/Monsoon Precautions

12.05.2016

Monsoon Precautions for Signalling systems.

2015/Sig/A/Fire/Pt.

22.08.2016

Joint Safety checks to prevent Drive-Fire hazard in S&T Service buildings.

2016/Sig/Winter precautions/01

18.10.2016

Winter and Fog precautions for Signaling System.

2015/Sig/A/Fire/Pt.

27.10.2016

Fire hazard in S&T Service Building- prevention thereof.

2008/Sig/G/4

11.11.2016

Regarding Locking of Advanced Starter Signal and Starter Signal.

2016/Sig/.IBS

29.11.2016

Provision of IBS on Single Line Sections

2015

2015/Sig/SEM Pt.I/Para 7.131.

13.01.2015

Increasing the speed of Passenger Train consisting of 13nos. BG high capacity AC EOG Double Decker Chair Car Coaches (Width 3050 mm) fitted with pneumatic suspension at the secondary stage on fiat bogies and 2 Nos. of BG LHB Generator Van hauled by signal WDP4B/WAP 5/WAP 4 class of Locomotive on Mumbai Central – Ahemdabad - Mumbai Central section of Western Railway from existing maximum 120 Kmph to130 Kmph (increase from 120Kmph to 130 Kmphn VR-BRC and 110 Kmph to 130 Kmph on BRC-ADI Section) on track maintained to C&M Vol.I standard.

2001/Sig/SGF/12(LED)Pt.

21.01.2015

Failure of Route Signal leading to unusual situation.

2012/Sig/E Non Gaz/1

09.03.2015

Safety of Personnel during maintenance and /or construction work.

2015/Train Punctuality/MR,s Action Plan

01.04.2015

Punctuality and asset failure

2014/Sig/SF/Summer Precautions

15.04.2015

Summer & Pre-monsoon precautions.

2014/Sig/SF/Summer Precautions

18.05.2015

Monsoon precautions for signaling system.

2013/Sig/Specifications

22.06.2015

Automatic Fire Detection and Suppression System.

2008/Sig/G/4

17.09.2015

Regarding Locking of Advanced Starter Signal and Starter Signal.

2015/Sig/PLN/Blue Print

21.09.2015

Policy for Adoption of various signaling technologies on BG Network of Indian Railways

2012/Sig/ATSS

26.11.2015

Signalling Installations at Major Junction Stations (> 100 routes).

2015/Sig/PLN/Blue Print

30.11.2015

Policy for adoption of various signalling technologies on BG network of Indian Railways

2010

2010/SIG/SEM/8/Pt.

15.09.2010

Improvement in Maintenance Practices

2010/Sig/Sem/8/Pt.

18.11.2010

Improvement on Maintenance Practices-Annual Maintenance Contract (AMC) with Original Equipment Manufacturer for S&T equipment.

2009

2002/Sig./A/Misc.

28.05.2009

Safe maintenance of Signaling System.

2008

S&T/S/334/Pt.V/1381

27.03.2008

Speed certificate for operation of 3WAG A/B/C class locomotives with T.A.O 659traction moron track maintained to other than C&M-1.Vol-I Standard.

2000/RS(G)/379/2

27.05.2008

Pre Inspection of Safety items procured from non-RDSO approved sources

98/W1/Genl/0/30-Pt.

13.08.2008

Standardization of service buildings for S&T Requirement. (Joint Engineering & S&T Circular)

2008/Sig/G/5

18.09.2008

Development/Trail of S&T System.

2003/SIG/SGF/7

18.11.2008

Indigenous Development of Signaling Equipment.

2007

2007/Sig/PCDO/REL.

19.06.2007

Reliability improvement measures for Single Section Digital Axle Counter (SSDAC) of M/S CEL Make.

SD.WAG5.11

27.11.2007

Speed certificate for operation of 3WAG A/B/C class of locomotives with T.A.O 659traction moron track maintained to other than C&M-1.Vol-I Standard.

2006

2004/Sig/SF/2/Pt.1

24.02.2006

Recommendations of task force to study the issues concerning asset failure and asset maintenance for establishing of a near ”Zero defect regime”

2002/AC-II/1/10

24.05.2006

Revised codal life of Assets.

2002/Elect(G)/150/9

09.06.2006

Air conditioning of S&T installations.

2005

2005/SIG/SEM/8

04.10.2005

Improvement in Maintenance Practices.

2005/Sig/PLG/3/Pt.

02.11.2005

Policy for Adoption of various signaling technologies on BG Network of Indian Railways.

2005/SIG/SEM/5

18.11.2005

Procedure Order for Handing Over/Taking Over of Newly Created Signalling Assets.

2005/SIG/SF/2

30.11.2005

Adoption of Direct Maintenance for reduction in Signal Failures.

 




Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 22-11-2023  

Admin Login |  Site Map  |  Contact Us  |  RTI  |  Disclaimer  |  Terms & Conditions  |  Privacy Policy  Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.