Letter
|
Date
|
Subject
|
2013/Sig/G/2/RDSO
|
30.12.2019
|
Agenda Item for Maintenance Study Group Meeting (MSG).
|
2019/Sig/86th SSC
|
30.12.2019
|
Items foe discussion in 86th Signal Standard Committee(SSC).
|
2014/Sig/TPWS/160KMPH/Loose
|
26.12.2019
|
Minutes of meetingheld on 16.12.2019 in Railway Board inconnection with preparation of detailed Estimates for the works of raising of speed up to 160kmph on Delhi-Mumbai and Delhi –Kolkata routes
|
2019/Sig/17/37/CTC
|
30.12.2019
|
Minutes of meeting heldin Railway Board on 19.12.2019 to review performance of centralized Traffic Control (CTC) Systam Tundla.
|
2015/Sig/E/Non-Gaz/1
|
30.12.2019
|
Open House discussions with Field Spervisors, Maintainers and Helpers.
|
2015/Sig/WG/Standardise Layouts
|
26.12.2019
|
Standardisation of Station Yard Layouts and Signalling Documents.
|
2018/Sig/36-SD/1
|
18.12.2019
|
Uploading of SIP & Roll Diagram.
|
2008/Sig/SGF/4/EI/GEN
|
19.12.2019
|
Integrating train operations into Electronic Interlocking (EI).
|
2017/Sig/WP/RE works
|
18.12.2019
|
Approval for use Podanur type TLBI with UFSBI in 25KV RE area on D&E rout in Signal Line section.
|
2017/Sig Modernization
|
18.12.2019
|
Mapping of Aptitude of officers in the area Modern Signaling.
|
2012/Sig/M/DAC
|
10.12.2019
|
Video conference on 13.12.2019 at 15.00 Hrs.
|
2019/Sig/86th SSC
|
10.12.2019
|
Holding of 86th Signaling Standards Committee Meeting.
|
2017/Sig Modernization
|
10.12.2019
|
Pilot Project of Provision ETCS Level-2 on four Sections of Indian Railway.
|
2015/Sig/WG/Standardize Layouts
|
09.12.2019
|
Standardisation of Station Yard Layouts and Signalling Documents.
|
2019/Sig/17/37/CTC
|
09.12.2019
|
Review of performance of centralized Traffic Control (CTC) Tundla.
|
2018/Sig/18/6/Data logger/1
|
09.12.2019
|
Safety Alarm generation by Data logger.
|
2010/Sig/M/5/81st SSC-1125
|
04.12.2019
|
Addendum and Corrigendum Slip No 7 of Indian Railway Signal Engineering Manual PT-II.
|
2019/Sig/17/36/ETCS L-2
|
04.12.2019
|
Inter –Operability of TCAS and ETCS Level-2 ATP System.
|
2019/AM(Sig)/Insp. Note/2
|
03.12.2019
|
Recorded Note of AM(Sig) Railway Board’s inspection of Train Management System, Mumbai Division, Central Railway on 16.11.2019.
|
2019/SIG/PCDO/Misc
|
29.11.2019
|
Type of Train Detection System.
|
2019/AM(Sig)/Insp Note/1
|
29.11.2019
|
Recorded Note on CBTC with AM (SIG),Railway Board during the discussion held on 16.11.2019 at MRVC.
|
2017/Sig/Modernization/Signalling
|
27.11.2019
|
Pilot Project of Provision of ETCS Level-2 on four Sections Indian Railway.
|
2018/Sig/36-SD/1
|
26.11.2019
|
Standardization of Signalling Drawings.
|
2012/Sig/PCDO/Misc
|
26.11.2019
|
Submission of BPAC position.
|
2018/Sig/36-SD/1
|
20.11.2019
|
Standardization of Typical circuits for Electronic Interlocking.
|
2018/Sig/36-SD/1
|
20.11.2019
|
Standardization of S&T Drawings.
|
2017/Sig/Modernization/Signalling
|
22.11.2019
|
Points notes during Hon’ble MR’s interaction with Member of Railway Board on 06.11.2019
|
2016/Sig/P/Misc
|
19.11.2019
|
Supply of material pertaining to the Ministry of Railway for the Pre-Budget Economic Survey 2019-20.
|
2019/Sig/17/36/ETCS L-2
|
13.11.2019
|
Interoperability of TCAS and ETCS Level-2 ATP Systems.
|
2014/Sig/M/83rd SSC
|
11.11.2019
|
Block working built into Electronic Interlocking.
|
2013Sig/SF/1/NI
|
11.11.2019
|
Speed of train during Non- Interlocking working.
|
2015/Sig/SF/1
|
07.11.2019
|
ONE Page Report (OPR)of Signalling and Interlocking Failures.
|
2008/Sig/SGF/4/EI/GEN/pt-1
|
04.11.2019
|
Automation in Signal Drawing-Self Relince in Electronic Interlocking.
|
2017/Sig/Modernization/Signaling
|
31.10.2019
|
Sanction of Signalling project deliberated in 34th GCM.
|
2016/Sig/DRG.OFFICE/1
|
31.10.2019
|
Approval of SIPs for Super Critical and Critical projects
|
2018/Sig/25/Conf./2
|
30.10.2019
|
PCSTEs’conference on 23&24 November 2019 at IRISET Secunderabad
|
2019/Sig/4/12/Est/2
|
25.10.2019
|
Revised Estimatefor the work of Bankura-Vishnupur-Repl.of signaling gears with electronic interlocking of S.E.Railway.(PBitem no SER 388/2019-20)
|
2012/Sig/PRIME/1
|
29.10.2019
|
Plan for Reliability Improvement and Maintennce Effectiveness Targets.
|
2016/Sig/Winter Precautions/1
|
28.10.2019
|
Winter and Fog precautions for Signaling Systems.
|
2018/Sig/7/6/RVNL/1
|
28.10.2019
|
Emprowering RVNL for Approval of Design documents of S&T installation in BZA-GDV-BVRM-NDD-NS-MTM Doubling,UR-MBNR and MMTS phase ii Dubling Project on South Central Railway.
|
2014/Sig/TPWS/160 KMPH/Loose
|
28.10.2019
|
Signalling Telecommunicotion works in connection with raising of speed to160 KMPH in Delhi Mumbai and Delhi-Kolkata Sections preparation of Detailed Estimate.
|
2019/Sig/17/37/CTC
|
25.10.2019
|
Review of performance of Ceentralized Traffic Control (CTC) Tundla in Board Meeting held on 03.10.2019
|
2017/Sig/Modernization Signalling
|
24.10.2019
|
Organizing Technical Workshop on Automatic Train Protection (ATP) System withspecial focus on ETCS Level-2.
|
2011/Sig/WP/15/2Pt
|
22.10.2019
|
Train Management System (TMS) Centralized Traffic Control (CTC) Operation &maintenance responsibility.
|
2019/Sig/26-A/ECoR/03
|
16.10.2019
|
Head on collisinn of Train No-18005 of (Howrah-Jagdalpur Samalleswarri Exp.) with 8-W OHE Tower Wagon on ECoR 190001 (Make ICF) at Km 160/9-10between Singapur Road A Cabin (SPRO)Keutguda (KTGA) station of Waltair Division of East Coast Railway at about 16.38 hours on 25.06.19.
|
2019/Sig/25-Conf./VC/PCSTE/2
|
16.10.2019
|
Carrying out a detailed inventory accountal of relays both in Open Line and Construction Units.
|
2015/Sig/SF/Punctuality
|
11.10.2019
|
Reliability Improvement Measures
|
2018/Sig/17/36/Modernisation
|
10.10.2019
|
Execution of works of trials of Modern Train Control System approved and sanctioned in Supplementary WP 2018-19
|
2014/Sig/TPWS/160KMPH/Loose
|
09.10.2019
|
Signalling and Telecommunication works in connecation with raising of speed to 160 KMPH in Delhi- Mumbai and Delhi –Kolkata Section preparation of Detailed Estimates
|
2019/Sig/SGF/18/6/2/Data Logger (COA)
|
03.10.2019
|
Synchronization of timings of Data Logger (COA)
|
2016/Sig/Board Meeting
|
03.10.2019
|
Strategy action plan forachieving operation ratio of 95%90% in 2019-20
|