Search Documents(Date Wise)   Search | Hindi | Increase Font size Increase Font size Increase Font size|
Indian Railway main logo
भारतीय रेल राष्ट्र की जीवन रेखा...
INDIAN RAILWAYS Lifeline to the Nation...
National Emblem of India
National Emblem of India
About Indian Railways
   Corporate Overview
      Directorates
         Coaching
            Coaching_Circulars
               2020


 
2020

C C NO.

Circular Subject 

Dated 

1

Stoppage of 15231/32 Panwel Barauni-Gonda Express at Suraimanpur

03.01.2020

2

Increase in frequency of 17613/14 Panvel-H.S.Nanded Express from 6 days a week to daily

10.01.2020

3

Extension of 19225/26 Jammu Bhatinda Express upto Jodhpur

10.01.2020

3 A

Modification  in Message issued by vide CC No. 3

14.01.2020

4

Conversion of 57257/58  Kakinada Port-Tirupati Passenger into Express trains alongwith short termination of 57257/58 and 57273/74 and 57273/74 Hubbali-Tirupati Passenger at Renigunta. 

13.01.2020

5

Short Termination of 17325/26 Belagavi-Ashokapuram Vishwamanav Express at Mysuru

09.01.2020

6

Introduction of train service between Anand vihar (T) to Madhupur ie. 22465/66 ANVT-MDP Express, 22459/60 ANVT-MDP Humsafar Express

13.01.2020

6 A

Modification  in Message issued by vide CC No. 6

13.01.2020

7

Extension of 19807/08 Kota-Jaipur Express (Daily) upto Hisar  as 19807/08 Kota-Hisar Express (04 days) via Loharu & 19813/14 Kota-Hisar Express via Churu. 

14.01.2020

8

Extension 19717/18 JP-CDG Express upto Daulatpur Chowk

25.02.2020

9

Speeding up of trains

28.01.2020

10

Speeding up of trains

10.02.2020

11

Introduction of new trains between Supaul and Saharsa & Banmukhi and Barhara Kothi and change in timings of 55501/02 Supaul-Saharsa Passenger and 55511/12 Banmakhi-barhara Kothi Passenger.

03.02.2020

12

Introduction of new trains on Darbhanga-Sakri-Jhanjharpur Section and change in timings of 55579 Darbhanga-Jhanjarpur Passenger

03.02.2020

13

Review of FTR policy (Earmark upto 5 rakes)

30.01.2020

14

Change in timings of 12533 LJN-CSMt Pushpak Express

14.02.2020

15

Stoppage of 12087/88 Naharlagun-Guwahati Express and 15617/18 Guwahati-Naharlagun Dorji Polo Express at Misamari

05.02.2020

16

Extension of 15009/10 Gorakhpur-Lakhimpur Pass upto Mailani 55066/61 Lakhimpur-Lucknow Passenger upto mailani

10.02.2020

17

Conversion of 22205/06 Express & 22665/66 Uday Express

13.02.2020

17 A

Modification  in Message issued by vide CC No. 17

13.02.2020

18

Change in timings and extension of 16523/24 and certain other trains

13.02.2020

18 A

Modification  in Message issued by vide CC No. 18 

14.02.2020

19

Conversion of passenger train into Express train

14.02.2020

20

Change of timings of 12087/88 Naharlagun-Guwahati Shatabdi and 12085 GHY-DBRG Shatabdi Express

14.02.2020

21

Conversion of passenger train into Express train

14.02.2020

22

Extension of 13409/10 Malda Town-jamalpur Intercity Express upto Kiul

18.02.2020

23

Change in days of 17013/14 Pune-Hyderabad Express (tri-weekly)

18.02.2020

24

13303/04 Dhanbad-Ranchi Express and 13319/20 Deoghar-Ranchi Express and 13319/20 Deoghar-Ranchi Express as Daily.

19.02.2020

26

Extension of 13053/54 Howrah-Siuri Express upto Radhikapur

25.02.2020

28

introduction of two pairs of MEMU services between PEN and DIVA

04.03.2020

29

Attachment of one ACCN and on GSCN in 14623/24 Chhindawara-Delhi Sarai Rohilla Patalkot Express and in 59385/86 Chhindwara-Indore Pench Valley Passenger.

09.03.2020

30

Introduction of train b/w Yesvantpur- Karwar Express and special train b/w Karwar- Vasco-da Gama by cancellation of 16513/14, 16523/24 SBC-Karwar Express and Partial cancellation of 70103/04 Pernem-Karwar DEMU

06.03.2020

31

Extension of 19663/64 Dr. Ambekdar Nagar-Khajuraho Express (4 days of week) upto Prayagraj Jn.

18.03.2020

32

Discussion of trains on SCR via Gulapalyamu-Kalluru by passing Gooty

16.03.2020

33

Speeding up and Shifting of terminal of 17318 Loknmanya-Hubbali Express from LTT to Dadar. 

17.03.2020

34

Naming of 13053/54 HWH-RDP Express as "Kalik Express"

19.03.2020

36

Diversion of 14803/04 BGKT-ADI Express & 12489/90 BKM-DDR express via Paten-Bhiladi. 

27.04.2020

37

Withdrawal of stoppage & conversion of 56501/02, 09/10 & 69/70

27.04.2020

37A

Modification in CC No. 37

19.05.2020

38

Running of Circular train from Chennai to Chittor

30.04.2020

39

Introduction of Special train between KSR Bengaluru and Belagavi and that between KSR Bangaluru and Mysuru

20.05.2020

40

Stoppage of 02425/26 New Delhi- Jammu Tawi AC Spl (Daily) at Pathankot Cantt.

29.05.2020

41

Amalgamation/De amalgamation  of 05 pair of trains over NWR

10.06.2020

42

Creation of 03 hrs corridor block margin on Mumbai-New Delhi route and certain other section in Zero Based time tabling

10.06.2020

42A

Modification in CC No. 42 A

22.06.2020

43

Change in terminal, change in days, Diversion and Short termination of trains

10.06.2020

44

Review of printing of abstract page of TAG in Public Time Table

10.06.2020

45

Elimination of enroute amalgamation/bi-fraction of 14887/88 Barmer-Kalka Slip coaches at Ambala. Discontinuation of 14887/88 and Running of 24887/88 Barmer -Rishikesh

22.06.2020

46

Change in timings of 06597/98 KSR Bengaluru-Belagavi Spl and 06503/04 KSR-MYS Spl and increase in its frequency

24.06.2020

47

Standardization of rakes of trains running with LHB stock 

24.06.2020

47B Standardization of Rake running with LHB coaches 19.10.2020

48

Short termination of 18631/32 RNC-Ajmer Express at MDU and splitting of some trains and certain other matters under ZBTT

29.06.2020

49

Extension of 19037/38 Bandra-Gorakhpur Express & 19039/40 BDTS-MFP upto Barauni with single number and extension of 19715 JP-LKO Express upto Gomti Nagar

01.07.2020

49A

Modification in CC No. 49

01.07.2020

50

Attachment of FTR coaches

01.07.2020

51

Discontinuation of link train 51821/51822 Jhansi-Khajuraho

08.07.2020

52

Changes in Zero base time table on Central Railway

17.07.2020

53

Diversion of 12237/12238 Varanasi-Jammu Express

20.07.2020

53A

Restoration of the route of 12237/12238 Varanasi-Jammu Express

07.08.2020

53B Restoration of original route of train in Lucknow Division 18.09.2020

54

Partial cancellation of trains proposed by Zonal Railways

20.07.2020

54A

Change in terminals of trains

11.08.2020

55

Extension of 13015/13016 Howrah-Bhagalpur Kaviguru Express upto Jamalpur

21.07.2020

56

Extension of 11061/11062 Lokmanya Tilak (T)-Darbhanga Express upto Jaynagar

21.07.2020

56A

Introduction of  train between Islampur and Natesar

 21.07.2020

57

Short termination, Diversion and Cancellation of trains over SWR

 27.07.2020

58

Diversion of 12751/12752 H.S Nanded-Jammu Tawi Express via Ambala-Rajpura-Dhuri-Ludhiana

27.07.2020

59

Withdrawal of Link  service from 11107/08 Bundelkhand Express & other train services

28.07.2020

60

Conversion of 11101/11102 Pune-Gwalior Express

27.07.2020

60A

Conversion of 11101/11102 Pune-Gwalior Exp.(Weekly) & 11103/11104 Jhansi-Bandra (T) Express into Superfast Express

30.07.2020

61

Extension of 15547/15548 Jaynagar-Lokmanya Tilak (T) Exp.

27.07.2020

61A

Extension of 15547/15548 Jaynagar-Lokmanya Tilak (T) Express upto Raxaul

04.08.2020

62

Changes in Zero base Time Tabling

27.07.2020

63

De-linking of 29019/29020 Merrut City-Mandasor Express

06.08.2020

64

Increase in frequency of 15905/15906 Dibrugarh-Kanniyakumari Vivek Exp.

28.07.2020

65 Extension of 64589/90 CNB-PHP upto Etawah 27.11.2020

66

Delinking of 29019/29020 Meerut City-Mandasor Exp.

27.07.2020

 

66 A Speeding of 2 Mail/Express into Superfast service. 17.12.2020

67

Speeding UP of 18 Trains with average speed of above 55 KMPH

06.08.2020

68

Discontinuation of slip coaches/link trains.

07.08.2020

68 A

Discontinuation of slip coaches/link trains.

28.08.2020

69

Extension of  56263/64 Mysuru-KSR Bengaluru Passenger & 56565/66 Arsikere-Mysore Passenger upto Nanjangud and Change in timings of 56513 Karaikal-KSR Bengaluru Passenger

07.08.2020

70 Augmentation of 11105/06 Jhansi-Kolkata Pratham Swatantrata Sangram Express from 15 coaches to 24 coaches 28.08.2020

71

Diversion of 22981/22982 Kota-Shri Ganganagar

10.08.2020

72

Introduction of New Train Between Supaul,

11.08.2020

73

Introduction of New Train Between Ghoswar and Vaishali

13.08.2020

74

Splitting  of 14163/64 Prayagraj JN-Meerut Exp.

17.08.2020

75

Speeding up of 11111/12 Gwalior-Balrampur Exp.

14.08.2020

76

Splitting of 69155/56 Ratlam-Mathura at Kota and running of new service between Kota and Mathura

19.08.2020

77

Sanction for the expenditure of Rs. 45,74,550/- for conducting a study for path optimization to increase freight trains speed under ZBT by Indian School of Business, Hyderabad

19.08.2020

78

Extension and change in terminal partial cancellation, diversion and cancellation of trains.

20.08.2020

79

Diversion of 12467/68 Jaipur-Jaisalmer Express

24.08.2020

79A Diversion of 12467/68 Jaipur-Jaisalmer Leelan Express 08.09.2020
79 B Proposal of NWR 28.12.2020

80

Attachment of 1 GS & 1 SLR in 00950 NGL-Okha Parcel Spl. On 27.08.2020

24.08.2020

81

Extension of 12323/24 Howrah-ANVT Express upto Barmer

25.08.2020

81A Extension of 12323/24 Howrah-Anand Vihar (T) Express upto Barmer 08.09.2020

82

Attachment of G.S. Coaches in parcel special train

26.08.2020

83

Partial Cancellation of some train in SCR

31.08.2020

84 Cancellation of 14807/08 Jaipur-Alwar Express and 59723/24 Jaipur Phulera Passenger 02.09.2020
85 Change in terminal of 17255/56 Narsapur-Hyderabad Express from Hyderabad to Lingampalli 22.09.2020
86 Running of special trains 23.09.2020
87 Introduction of a DEMU Service 16.12.2020
88 Attachment of LVPH by Humsafar Express 28.09.2020
89 Change in nature of Passenger trains into Mail Express 20.10.2020
90 Printing and Publication on TAG-20 13.10.2020
91 Festival Special-2020 13.10.2020
91A Festival Special-2020 15.10.2020
91B Festival Special-2020 21.10.2020
92 Attachment of General Coaches in Mail/Express trains 21.10.2020
93 Change in timings and increase in frequency of 14803/04 Ahmedabad-Bhagat ki Kothi Express  09.11.2020
94 Speeding of 11105/06 Kolkata-Jhansi Pratham Swatantrata Senani Express 17.11.2020
95 12927/28 Vadodara-Mumbai Express, 22903/04 Vadodara-Varanasi Mahamana Express and 22905/06 Vadodara- Rewa Mahamana Express upto Kevadiya and introduction of MEMU service between Pratapnagar and Kevadiya.  18.11.2020
68B Modification in CC No. 68 19.11.2020
96 12723/24 Secunderabad-Shalimar AC Express & 22849/50 Secunderabad-Shalimar Express via revised route 23.11.2020
97 12723/24 Secunderabad-Shalimar AC Express & 22849/50 Secunderabad-Shalimar Express via revised route 23.11.2020
98 Stoppage of 12221/22 Howrah-Pune Duranto Express and 12261/62 Mumbai-CSMT-Howrah Duranto Express at Raipur 24.11.2020
68C Restoration of Slip Coaches services 24.11.2020
99 Revised route of 16359/60 Ernakulam-Patna Express and five other trains and extension of 14815/16 Bhagat ki Kothi- Tambram Humsafar Express upto Tiruchchirappalli  26.11.2020
100 Stoppage of 22659/60 Kochuveli-Dehradun Express at Ernakulam and Alappuzha  27.11.2020
101 Introduction of Bhagalpur-Godda DEMU EXPRESS 07.12.2020
102 Introduction of train service between Ahmedabad and Kevadia  10.12.2020
103 Running of new train between Okha & Howrah 08.12.2020
104 Approval of the proposal of NFR 11.12.2020
105 Approval of the proposal of NR 08.12.2020
106 Approval of the proposal of SWR 08.12.2020
108 Approval of proposal of ECoR for diversion 08.12.2020
108 B Approval of the proposal of SER 28.12.2020
109 Stoppage of 20817/18, 22811/12, 22823/24 BBS-NDLS Rajdhani at Prayagraj 11.12.2020
110 Approval of the proposal of SR 11.12.2020
111 Train between Tuticorin and Vanchi Maniyachchi 11.12.2020
113 Change in days of 15548 LTT-Raxaul Express change in days of 14115/16 MHOW-Prayagraj Express and elimination of slip coach in 14511/12 Prayagraj Khurja Express as proposed by CR, NR and NR 17.12.2020
114 Extension of 12917/18 ADI-NZM S.K. Express upto Kevadiya 17.12.2020
115 Diversion of 12389/90 Gaya-MAS Express  21.12.2020
116 Stoppage of 12891/92 BBS-Bangriposi Express at Rajlukah 22.12.2020
117 Operation of 14085/86 Tilak Bridge-Sirsa Express and 14019/20 Agaratala-ANVT Tripur Sundari Express 23.12.2020
118 Speeding up of 18495/96 BBS-RMM Express 24.12.2020

 




Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 07-07-2021  

 Site Map  |  Contact Us  |  RTI  |  Disclaimer  |  Terms & Conditions  |  Privacy Policy  Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.