Condonation to IRSOD - Other than Rolling Stocks - 2018
|
Circular No.
|
Date
|
Subject
|
2018/CEDO/SD/33 |
03.12.2018 |
Condonation for infringement of 1 in 130 within yard limits - Guntur Division - Guntur - Tenali section - Proposed doubling of track with electrification between Tenali and Guntur section - Proposed Yard arrangements at Guntur Junction. |
2018/CEDO/SD/31 |
03.10.2018 |
Temporary condonation of infringement w.r.t. IRSOD, 2004 for Mancotta Road Over Bridge, Dibrugarh Town Yard (km 0/6-7), between DBRT-CKW of Tinsukia Division of Northeast Frontier Railway, upto March’ 2020. |
2018/CEDO/SD/25 |
19.09.2018 |
Condonation for infringement of track centre of 4720mm and minimum horizontal distance of any structure from center line in the extension /remodelling of Jaipur Yard |
072018/CEDO/SD/24 |
19.09.2018 |
Condonation for infringement for existing gradients of 1 in 167, 1 in 196 & 1 in 194 (steeper than 1 in 260 in Rajkharswan Bypass Line at Rajkharwan West Outer Cabin , Yard at Km. 293.516 (from Howrah) (West Outer Cabin) of Chakradharpur Division of South Eastern Railway in connection with Rajkhaswan - Chakradharpur third line project. |
2018/CEDO/SD/18 |
30.08.2018 |
Condonation of infringing gradients of 1 in 37.6 at Dudhsagar station located in the ghat section between Castle Rock - Kulem station of Hubballi Division of South Western Railway. |
2018/CEDO/SD/17 |
30.08.2018 |
Condonation of infringing gradients of 1 in 38.81 at Solanium station located in the ghat section between Castle Rock - Kulem station of Hubballi Division of South Western Railway. |
2018/CEDO/SD/16 |
30.08.2018 |
Condonation of infringing gradients of 1 in 37 at Caranzol station located in the ghat section between Castle Rock - Kulem station of Hubballi Division of South Western Railway. |
2018/CEDO/SD/20 |
16.08.2018 |
Temporary Condonation for adoption of IRSOD (BG) 2004 Schedule - I, Chapter - I, General and ACS - 13 Para - 10 Note (b) regarding minimum vertical permissible clearance from Rail Level to any structure at Hiran River Bridge KM 1025/1-3 in Jabalpur - Satna section of Jabalpur Division of West Central Railway. |
2018/CEDO/SD/21 |
16.08.2018 |
Temporary Condonation for adoption of IRSOD (BG) 2004 Schedule - I, Chapter - I, General and ACS -13 Para - 10 Note (b) regarding minimum vertical permissible clearance from Rail Level to any structure at Niwar Bridge KM 1067/2-3 in Jabalpur - Satna section of Jabalpur Division of West Central Railway. |
2018/CEDO/SD/27 |
16.08.2018 |
Condonation of RORUB between Katni South - Katni Station for adoption of IRSOD (BG) 2004, Schedule - I, Chapter - I and ACS -13, Para -10, Note (b) IRSOD-2004 regarding minimum vertical permissible clearance from Rail Level to any structure in Jabalpur - Satna section of Jabalpur Division of West Central Railway. |
2018/CEDO/SD/29 |
13.08.2018 |
Condonation for retaining of infringing vertical clearance in ROB ( Bridge no. 377, Km.353/3-4) on MTJ-AH section of Agra Division of North Central Railway. |
2017/CEDO/SD/50 |
31.07.2018 |
Condonation of existing & proposed gradient of 1 in 177 at Howrah ( Bagdehi ) end, 1 in 164 & 1 in 105 at Jharsuguda end (steeper than 1 in 260 ) in the Dhutra Station Yard at km. 505.445 (from Howrah) in between Panpali and Jharsuguda Stations in connection with the construction of proposed 3rd line in Rourkela – Jharsuguda section of Chakradharpur Division of South Eastern Railway.
|
2018/CEDO/SD/14 |
25.06.2018 |
Condonation for infringement horizontal dimensions to Para 7(a)(ii), Chapter-II of IRSOD in connection with the work of replacement of old FOB at ET end with new FOB 6m wide from platform no. 1 to 8 and extension upto circulating area alongiwth staircase on each platform & provision of lift on each PF, i.e. PF no. 1, 2&3, 4&5, 6, 7 &8 at Nagpur Station of Nagpur Division of Central Railway. |
2018/CEDO/SD/12 |
25.06.2018 |
Condonation for infringement to Para 2(i)(b) & 2(ii) Chapter II, Schedule I of IRSOD for existing gradient in Vaghali station 1 in 200 from km. 336.746 to 337.660 on IGP-BSL section in connection with provision of Loop Line of 753m CSR in Down Direction at Vaghali station of Bhushawal Division of Central Railway. |
2018/CEDO/SD/15 |
08.06.2018 |
Condonation for infringement to Para 2(i)(b) and 2(ii) of Chapter-II, Schedule-I of IRSOD for proposed gradient steeper than 1 in 260 in Kalwa yard in connection with laying of 5th & 6th line between Thane-Diva of CSTM-Kalyan section and retention of existing grade of 1 in 196 of Kalwa yard in Mumbai Division of Central Railway. |
2018/CEDO/SD/11 |
23.05.2018 |
Condonation for infringement to Para 2 (I) (b) & 2 (ii) of IRSOD for gradient in Jhansi Yard 1 in 200 (UP Main line Gwalior), 1 in 192 (Down Main line Gwalior), 1 in 200 Down Main line Kanpur, existion line) and 1 in 200 (Proposed UP Main line Kanpur) of Jhansi Division of North Central Railway. |
2018/CEDO/SD/10 |
23.05.2018 |
Condonation of existing gradient of 1 in 103 & 1 in 157 both at Howrah end in the Talaburu Station Yard at Km. 337.867 (from Howrah ) in between jhinkpani and Kendposi Station in connection with the construction of proposed 3rd line in Rajkharswan - Dongoaposi section of Chakradharpur Division of South Eastern Railway. |
2018/CEDO/SD/13 |
15.05.2018 |
Condonation for infringement to Para 2(i) of IRSOD for gradient at proposed jaroli ‘A’ Cabin Station Yard (km. 412.408 From/Howrah) in connection with the existing private siding of M/s Rungta Mines Ltd. between Jaroli-Nayagarh stations of Chakrdharpur Division of South Eastern Railway |
072018/CEDO/SD/03 |
15.05.2018 |
Condonation of infringement due to column of Ratlam end FOB at platform No. 4 & 5 for its minimum horizontal distance from loop line no. 7 & 8 at Nagda station in Ratlam Division of Western Railway. |
2018/CEDO/SD/01 |
15.05.2018 |
Pune: Condonation for infringement of Schedule of Dimensions on Platform nos. 4, 5 & 6 with regard to construction of new Foot Over Bridge 12 m wide and connection by skywalk to two FOB’s at Pune station of Pune Division in Central Railway. |
2017/CEDO/SD/35 |
23.04.2018 |
Condonation for vertical and horizontal infringement to IRSOD- Schedule-I, Chapter II, Item no. 10, Note-(iii) & Chapter II, Item No. 11(B) under Road-over Bridge no. 4R at chainage 1581.00m at Korukkupet end of Royapuram (RPM) Station yard; regarding laying of 3rd & 4th line between Chennai Beach (MBS) and Korukkupet (KOR) section of Chennai Division of Southern Railway |
2018/CEDO/SD/09 |
21.03.2018 |
Temporary condonation (upto July-2018) for vertical infringement to IRSOD-2004, Schedule-II, Item 12(ii) Chapter V-A, Electric Traction (ACS-10) due to less vertical clearance of 220 kv Over head Power Line crossing at Location Km 136/8-9 between Satrod- Hisar stations and at location 03/7-8 between Satrod and Raipur Haryana stations in Manheru-Hisar section of Bikaner Division of North Western Railway.
|
2018/CEDO/SD/08 |
21.03.2018 |
Condonation for vertical infringement to IRSOD-Schedule-I, Chapter II, Item 10 note(iii), of Road Over Bridge from Rail Level at Location 143/0-1 at Hisar station in Manheru-Hisar section of Bikaner Division of North Western Railway.
|
2018/CEDO/SD/07 |
21.03.2018 |
Temporary condonation (upto December-2018) for vertical infringement to IRSOD-Schedule-I, Chapter II, Item 10 note(iii) of Foot Over Bridge from Rail Level at Location 142/5-6 at Hisar station in Manheru-Hisar section of Bikaner Division of North Western Railway.
|
2018/CEDO/SD/06 |
27.02.2018 |
Temporary Condonation for infringement due to IRSOD Schedule –I, Chapter VB with A & C Slip no. 21, under Palanpur ROB (Line 2, 3 & 4) at Km. 652/16-17 in connection with introduction of new electrification at 25 KV AC under Mehsana – Palanpur of Ahmedabad Division of Western Railway.
|
2018/CEDO/SD/05 |
27.02.2018 |
Temporary Condonation for infringement to IRSOD Schedule –I, Chapter VB with A & C Slip no. 21, under Sidhpur FOB (Line 1 & 2) at Km. 681/21-22 in connection with introduction of new electrification at 25 KV AC under Mehsana – Palanpur of Ahmedabad Division of Western Railway. |
2018/CEDO/SD/04 |
27.02.2018 |
Temporary Condonation for infringement due to IRSOD Schedule –I, Chapter VA/VB with A & C Slip no. 21, under Sidhpur ROB (Main Line) at Km. 682/7-8 in connection with introduction of new electrification at 25 KV AC under Mehsana – Palanpur of Ahmedabad Division of Western Railway.
|
2018/CEDO/SD/02 |
22.02.2018 |
Permanent condonation for not adopting provisions of IRSOD for new works between Varanasi City and Sarnath stations in connection with Aunrihar – Manduadih doubling & electrification work of Varanasi Division of North Eastern Railway. |
2017/CEDO/SD/45 |
15.02.2018 |
Condonation of Vertical infringement to minimum height from rail level to the underside of contact wire in the open line section due to EHV crossing at km. 597/07 to km. 597/24 & km. 590/29 to km. 591/04; in connection with Railway Electrification work of Gulbarga – Wadi section of Solapur Division of Central Railway. |
2017/CEDO/SD/40 |
05.02.2018 |
Laying of 3rd & 4th Line between Chennai Beach (MSB) and Korukkupet (KOK) section – Condonation for infringing dimensions in centre to centre of tracks-reg. |
2017/CEDO/SD/49 |
03.01.2017 |
Condonation for vertical infringement to IRSOD-Schedule-I, Chapter-II, Para 10 Note(iv) in existing ROB No. E.17 at Tiruchchirappalli Fort Yard regarding electrification of Erode – Karur – Tiruchchirappalli section in Tiruchchirappalli Division of Southern Railway. |
2017/CEDO/SD/47 |
03.01.2017 |
Condonation for infringement of Schedule of Dimensions as per IRSOD-2004 vide Para 11(B)(VII & VIII) of Chapter –II for less horizontal distance from centre of track to any structure below rail level up to formation level in connection with extension of Harbour line from Andheri to Goregaon of Mumbai Division in Western Railway.
|
2017/CEDO/SD/46 |
03.01.2017 |
Condonation for infringement of Schedule of Dimensions as per IRSOD-2004 vide Para 1(ii) & note (c) of ACS-19 of Chapter –II for less track centres between existing line (Down local) and proposed new line (UP Harbour) in connection with extension of Harbour line from Andheri to Goregaon of Mumbai Division in Western Railway. |
2017/CEDO/SD/48 |
01.01.2018 |
Condonation for infringement of Schedule of Dimensions as per IRSOD-2004 vide Para 1(ii) of Chapter –II for track centres of new stabling sidings at Goregaon Station in connection with extension of Harbour line from Andheri to Goregaon of Mumbai Division in Western Railway.. |