Condonation to IRSOD - Other than Rolling Stocks - 2017
|
Circular No.
|
Date
|
Subject
|
2017/CEDO/SD/43 |
20.12.2017 |
Condonation for infringing gradient of 1 in 101 between Ch : 25558 to Ch : 25750 for proposed yard arrangement at Ambewadi yard of Hubballi Division in South Western Railway. |
2017/CEDO/SD/28 |
20.12.2017 |
Temporary condonation for vertical infringement to IRSOD-Schedule-I, Chapter I, Item 11(i) of 220 kv Overhead Power Line Crossing at Km 513/7-8 regarding Doubling and Electrification work between Birolia – Jawai Bandh in Rani - Keshavganj section of Ajmer Division of North Western Railway. |
2017/CEDO/SD/33 |
14.12.2017 |
Wadsinge Station - Condonation for adoption of Lesser horizontal distance from centre of track to any structure to IRSOD Para 11(B)(III),(VII) & its Note (C),(ACS-16) of schedule-I, Chapter-II in Wadsinge Station yard on Daund-Gulbarga Doubling project in Solapur Division of Central Railway. |
2017/CEDO/SD/44 |
05.12.17 |
Condonation for infringement of Schedule of Dimensions with regard to track centre of 4730 mm from km. 21/11 to 26/15; in connection with extension of Harbour line from Andheri to Goregaon of Mumbai Division in Western Railway. |
2017/CEDO/SD/41 |
05.12.2017 |
Makalidurga station yard : Condonation to IRSOD (Schedule-I, Chapter II, Para 2) of infringing gradient of 1 in 105 (from CH: 51750.000 to CH: 52200.000), 1 in 120 (from CH: 52200.000 to CH: 52797.000), 1 in 110 (from CH: 52797.000 to CH : 53518.000) and 1 in 100 (from CH: 53518.000 to CH: 53550.000); (steeper than 1 in 260) at Makalidurga station yard in connection with Yelahanka-Penukonda Doubling work in Bangaluru Division of South Western Railway. |
2017/CEDO/SD/37 |
27.09.2017 |
Condonation to IRSOD (Schedule-I, Chapter II,Para2) for infringing existing gradient of 1 in 100(C) (from CH: 2294.090 to CH: 2374.700) over ‘C Link’, 1 in 200(C) (from CH: 2588.000 to CH: 3048.000) over ‘B-Link’, 1 in 175(C) (from CH: 1590.000 to CH: 2352.000) over ‘A-Link’ at Mourigram yard (Fly over block hut) in connection with Andul-Baltikuri Doubling work in Kharagpur Division of South Eastern Railway. on typ |
2017/CEDO/SD/29 |
31.08.2017 |
Condonation for horizontal and vertical infringement to IRSOD-Schedule-I, Chapter I, 8(iii)(a) & 10(c)(ii) of Fly-over Bridge no. 5A/1 at km. 294/1-3 in between Rajkharswan – Barabamboo stations in Tatanagar – Chakradharpur section of Chakradharpur Division of South Eastern Railway, regarding construction of Rajkharswan – Chakradharpur 3rd line.
|
2017/CEDO/SD/38 |
10.08.2017 |
Dongaposi station yard : Condonation to IRSOD (Schedule-I, Chapter II,Para2) of existing gradient of 1 in 198 at (steeper than 1 in 400) in the Dongaposi station yard at Km. 366.481 (from HWH) in Rajkharswan-Dongaposi section in connection with proposed 3rd line between Rajkharswan-Dongaposi of Chakradharpur Division of South Eastern Railway. |
2017/CEDO/SD/36 |
08.08.2017 |
Maluka station yard : Condonation to IRSOD (Schedule-I, Chapter II,Para2) of existing gradient of 1 in 200 at Dongoaposi end and 1 in 207 at Rajkharswan end (steeper than 1 in 260) in the Maluka station yard at Km. 356.354 (from HWH) in connection with proposed 3rd line between Rajkharswan-Dongaposi of Chakradharpur Division of South Eastern Railway. |
2017/CEDO/SD/22 |
29.06.2017 |
Condonation for horizontal infringement to IRSOD-Schedule-I, Chapter II, 7(b)(i) between centre line of track and Stairway of Foot Over Bridge at Chainage 2571.50 at Washermenpet Station; in connection with laying of 3rd and 4th line between Chennai Beach (MSB) and Korukkupet (KOK) section in Chennai Division of Southern Railway. |
2017/CEDO/SD/23 |
28.06.2017 |
Condonation for horizontal infringement to IRSOD-Schedule-I, Chapter II, 7(a)(i)&(ii) between centre line of proposed 3rd line and existing Heritage Station Building from km. 1.251 to km. 1.260 Royapuram Station (RPM); in connection with laying of 3rd and 4th line between Chennai Beach (MSB) and Korukkupet (KOK) section in Chennai Division of Southern Railway. |
2017/CEDO/SD/27 |
19.06.2017 |
Condonation for adopting higher degree of curvature w.r.t. infringement to Indian Railways Schedule of Maximum/Minimum and Recommended Dimensions (2’0” Gauge, 1922), Reprint in 1949, 1M General, Item 7; in Neral- Matheran Narrow Gauge section (2’0”) line in Mumbai Division of Central Railway.
|
2017/CEDO/SD/26 |
15.06.2017 |
Condonation for less horizontal clearance of existing 132 KV (DC) Overhead Power Line Crossing of AP TRANSCO between Satulur- Narasaraoper Railway Station at Km. 40/6-7 on Nallapadu – Diguvametta section of Guntur Division of S.C. Railway. |
2017/CEDO/SD/11 |
21.04.2017 |
Vadala Road Station : Condonation for horizontal infringement to IRSOD-Schedule-I, Chapter II, 7(a) (ii) of proposed FOB at Vadala Road Station of Mumbai Division of Central Railway. |
2017/CEDO/SD/15 |
11.04.2017 |
Temporary Condonation (up to 30.06.2017) for vertical infringement to IRSOD-Schedule-I, Chapter I, Item 11(i) of 220 kv Overhead Power Line Crossing at Km 57.477 between Charkhi dadri – Manheru in Rewari - Manheru section of Bikaner Division of North Western Railway. |
2017/CEDO/SD/12 |
03.04.2017 |
Khurda Road Station : Condonation for horizontal infringement to IRSOD-Schedule-I, Chapter II, 7(a)(ii) of proposed FOB at Khurda Road Station of Khurda Road Division of East Coast Railway. |
2017/CEDO/SD/10 |
03.04.2017 |
Duvvada Station : Condonation for horizontal infringement to IRSOD-Schedule-I, Chapter II, 7(a) (ii) of proposed FOB at Duvvada Railway Station on main line of Waltair Division of East Coast Railway. |
2017/CEDO/SD/18 |
21.03.2017 |
Condonation for infringing gradient of 1 in 150 (steeper than 1 in 260) at the proposed CONCOR siding cabin in between Simhachalam North (SCMN) – Jaggayyapalem (JGPM) section (Ch:3153.861m F/SCMN/ SRJ Ch: 1274.488m to Ch: 3368.11m F/SCMN SRJ Ch : 1060.239m) of Waltair Division of East Coast Railway |
2017/CEDO/SD/20 |
20.03.2017 |
Temporary Condonation (up to 31.03.2018) for vertical infringement to IRSOD-Schedule-I, Chapter I, 10(c) and note (b), (c) & (d) of the existing Foot Over Bridge at Katihar yard in connection with Railway Electrification of Katihar – Mukuria – New Jalpaiguri – Raninagar Jalpaiguri section of Katihar Division of N.F.Railway. |
2017/CEDO/SD/21 |
20.03.2017 |
Temporary Condonation (up to 31.03.2018) for vertical infringement to IRSOD-Schedule-I, Chapter I, 10(c) and note (b), (c) & (d) of the existing Road Over Bridge at Katihar yard in connection with Railway Electrification of Katihar – Mukuria – New Jalpaiguri – Raninagar Jalpaiguri section of Katihar Division of N.F.Railway. |
2017/CEDO/SD/09 |
15.03.2017 |
Condonation for horizontal infringement to IRSOD-Schedule-I, Chapter I, Item 11(iv)(ii), Section -I of 220 kv Overhead Power Line Crossing at Km 136/6-7 between Satrod – Hisar stations in Rewari – Hisar section n of Bikaner Division of North Western Railway. |
2017/CEDO/SD/14 |
16.03.2017
15.03.2017 |
Condonation for horizontal infringement to IRSOD-Schedule-I, Chapter I, Item 11(iv) (ii) of 3 Nos. of EHT Power Line Crossing regarding Railway Electrification works between Wadi & Guntakal section of Guntakal Division of South Central Railway. |
2017/CEDO/SD/17 |
14.03.2017 |
Temporary Condonation (up to 31.12.2017) for horizontal infringement to IRSOD-Schedule-I, Chapter I, Item 11(iv)(ii) of 132 kv (Liluah – Dankuni feeder) Overhead Power Line Crossing between OHE location no. 13/9-11 (near Dankuni station) in connection with commissioning of double line in Dankuni – Bhattanagar section and 3rd line in Bally – Dankuni section (both are electrified) in Howrah Division of Eastern Railway. |
2017/CEDO/SD/16 |
14.03.2017 |
Temporary Condonation (up to 31.12.2017) for horizontal infringement to IRSOD-Schedule-I, Chapter-I, Item 11(iv)(ii) of 132 kv (Liluah - Rishra, Liluah Howrah feeder) Overhead Power Line Crossing between OHE location no. AC – 9/15-17; in connection with the proposed double line in Dankuni – Bhattanagar section in Howrah Division of Eastern Railway. |
2016/CEDO/SD/36 |
03.03.2017 |
Vaitarna Station : Condonation of gradient of 1 in 150 on existing UP main and 1 in 180 in DN main line Vaitarna Yard of Virar-Surat section of Mumbai Division of Western Railway. |
2016/CEDO/SD/18 |
03.03.2017 |
Condonation for infringing Vertical infringement to IRSOD-Schedule-I, Chapter I, 10(c) and note (b), (c) & (d) for ROB no. 410 A at Km. 8/100-200 in Yesvantpur – Chikbanavar section in connection with Railway Electrification of Bengaluru Division of South Western Railway |
2017/CEDO/SD/13 |
02.03.2017 |
Temporary Condonation (up to 31.07.2017) for horizontal infringement to IRSOD-Schedule-I, Chapter I, Item 11(iv)(ii) of 220 kv Overhead Power Line Crossing at Km 132/4-5 in Doubling of Pen – Roha section of Mumbai Division of Central Railway. |
2017/CEDO/SD/08 |
21.02.2017 |
Condonation for vertical infringement to IRSOD-Schedule-I, Chapter I, 10(c) and note (b), (c) & (d) of the existing Road Over Brides (i.e. ROB no. 918/01 and 926/01) in connection with Railway Electrification Work of AMF-CWA section in Nagpur Division of Central Railway.
|
2016/CEDO/SD/23 |
07.02.2017 |
Extension of Temporary condonation up to 31.03.2017 for vertical infringement to IRSOD under Muniguda FOB pertaining to RE of Singapur Road – Titlagarh section of Sambhalapur Division in East Coast Railway. |
2017/CEDO/SD/01 |
07.02.2017 |
Condonation for infringing dimensions in centre to centre of tracks on proposed BG (existing MG) and existing BG alignment between Km 3/10-11 to 4/4-5 {length = 558m, (Para 1(ii), Ch-I}, horizontal clearance between centre line of proposed BG track & abutment wall of Bridge no.470 at Km 4/1-2 {Para 8(iii) (a & b), Ch-I} and vertical clearance from proposed BG Rail level to bottom of girder under Bridge no. 470 at Km 4/1-2 {Para 10(c)(ii), Ch-I} between Aishbagh and Lucknow City in connection with gauge conversion of Lucknow-Sitapur section of Lucknow Division of North Eastern Railway. |
2017/CEDO/SD/07 |
07.02.2017 |
Temporary Condonation (up to 30.06.2017) for horizontal infringement to IRSOD-Schedule-I, Chapter I, Item 11(iv)(ii) of 220 kv Overhead Power Line Crossing at Km 61.790 between Charkhi Dadri – Manheru stations in Rewari – Hisar section regarding Doubling and Electrification work of Rewari – Manheru section of Bikaner Division of North Western Railway. |
2017/CEDO/SD/06 |
27.01.2017 |
Condonation of existing infringement to vertical clearance as per IRSOD (Para 4, Ch.-II of IRSOD) due raising of 19 numbers platforms up to 900mm at 07 stations in Mumbai Division suburban of Central Railway. |
2017/CEDO/SD/03 |
27.01.2017 |
Ariyalur Yard : Condonation for infringing gradient steeper than 1 in 260 (i.e. between 1 in 207.5 & 1 in 201.4)(Para 2, Note(d)(ii), Ch-II of IRSOD) between Ch: 269284m to Ch: 269616m (VM end) and Ch: 271026M to Ch: 271618M (TPJ end) respectively due to arrangement at Ariyalur Yard regarding Doubling between Villupuram and Dindigul section of Tiruchchirappelli Division of Southern Railway. |
2017/CEDO/SD/02 |
27.01.2017 |
Tavargantti Yard : Condonation for infringing gradient steeper than 1 in 260 (i.e. between 1 in 103 to 1 in 200)(Para 2, Note(d)(ii), Ch-II of IRSOD) between km 533.400 to 535.550 due to arrangement at Tavargantti Yard regarding Doubling between Hospete – Tinaighat section of Hubballi Division of South Western Railway. |
2016/CEDO/SD/38 |
09.01.2017 |
Condonation for infringing dimensions in centre to centre of tracks {Para 1(ii), Ch-I}, horizontal clearance between centre line of track & abutment {Para 8(ii) a & b,Ch-I} and vertical clearance from Rail level {Para 10(c)(ii), Ch-I} at Road Over Bridge No. 392A at 333/500-600 between Tiruchchirappalli Town and Ponmalai Jn. station regarding Proposed doubling between Villupuram Jn. and Dindigul Jn. of Southern Railway. |
2016/CEDO/SD/37 |
09.01.2017 |
Sanchi Station - Condonation for adoption of lesser horizontal distance from centre of track to any structure below rail level and up to formation level which is in violation of Para 11(B) & its Note (c)/ Chapter-II/ Schedule-I to IRSOD regarding spacing of track centre in Sanchi Station yard on Bina- Bhopal 3rd line project in Bhopal Division of West Central Railway. |