Search Documents(Date Wise)   Search | Hindi | Increase Font size Increase Font size Increase Font size|
Indian Railway main logo
भारतीय रेल राष्ट्र की जीवन रेखा...
INDIAN RAILWAYS Lifeline to the Nation...
National Emblem of India
National Emblem of India
About Indian Railways
   Corporate Overview
      Railway Board Directorates
         Civil Engineering
            SANCTION LETTERS
               SD-2013
SR-2007
SD-2007
SD 2008
SR 2008
SD 2006
SR 2006
SD2005
SR 2005
SR 2004
SD 2004
SR-2000
SD-2000
ORI-2000
ORI-2002
SR-2002
SD-2002
SR-2001
SD-2001
SD 2003
SR 2003
ORI-2008
ORI-2003
ORI-2004
ORI-2006
ORI-2007
ORI-2005
SD-RS-2011
SR - 2010
ORI-Misc
SD/SR-2009
SD/RS-2008
SD/RS-2007
SD/RS-2006
SD/RS-2005
SD/RS-2004
SD/RS-2003
SD/RS-2002
SD/RS-2001
SD/RS-2000
SD - 2012
ORI - 2012
SR-2012
SD-RS-2012
SR-Misc
SR-2013
SD2013
SD-RS-2013
SD-2014
ORI-2013
ORI-2014
SR-2014
SR-1999
SD-RS-1999
SR-1998
SD-RS-1998
Before SD-RS-2000
Before SR-2000
SD-RS-2014
SR-2015
SD-2015
ORI-2015
SD-RS-2015
ORI-2015
SR-2016
SD-2016
ORI_2016
SR_2017
SD_2017
SD RS 2017
SR_2018
SD-RS_2018
ORI_2018
SD-RS-2019
SD 2019
SR-2019
SD/RS-2020
SD-2020
SR-2020
SD-RS-2021
SR-2022
SR-2023
SD_2023
SR-2011
SD/RS-2023
ORI_2019
RDSO Speed Certificate of different Wagons
SANCTION LETTERS OF ROLLING STOCK_MERGED
SPEED_CERTIFICATES_WAGON_RDSO
SR-2021
SD/SR-2010
SR-2009
IRSOD_2011
IRSOD_2010
IRSOD_2009
Railways_2010
Railways_2009
SD-RS-2022
SD RS 2016
SD_2018
SD_2021


 
SD-2013

Condonation to IRSOD - Other than Rolling Stocks - 2013

Circular No.

Date

Subject

2013/CEDO/SD/20 04.11.2013 Condonation for retention of existing horizontal infringements in the minimum distance from centre line of track to any structure to the IRSOD inside existing Parsik Tunnel between KM 36/6-37/1 in connection to modification of existing 1500 Volts DC traction to 25 KV AC traction in KYN-TNA & TNA-LTT (via 5th & 6th Lines) section in Mumbai suburban section of Mumbai Division, Central Railway.
2013/CEDO/SD/16 28.10.2013 Condonation for existing infringing gradient of 1 in 136.8 and 1 in 155 grades (steeper than 1 in 260) at the proposed Kharagpur West Outer Cabin on Kharagpur - Gokulpur section of Kharagpur Division of South Eastern Railway
2013/CEDO/SD/17 22.10.2013 Condonation for retaining existing infringements to lesser Vertical clearances under ROB at Muzaffarpur Yard (HJP end ; Km-87/0-1) to IRSOD (BG) 2004 in Barauni – Muzaffarpur - Hajipur section in connection to Railway Electrification work of Sonpur Division of East Central Railway
2013/CEDO/SD/15 15.10.2013 Condonation to infringements for adoption of lesser track centres in Kosi Kalan yard from Km 1437.920 to 1438.960 w.r.t. IRSOD (BG) 2004 on newly constructed 3rd line between Chahata and Hodal stations on Palwal-Bhuteshwar section ofAgra Division on North Central Railway.
2013/CEDO/SD/14 25.09.2013 Condonation for retaining existing infringements to lesser Horizontal clearances of OHE structures to IRSOD (BG) 2004 between CSTM and Kurla (i.e. at CSTM, Mazgaon, Byculla, Dadar, Matunga and Kurla) in connection to modification of existing 1500 Volts DC traction to 25 KV AC traction of Mumbai Division of Central Railway
2013/CEDO/SD/13 25.09.2013 Condonation for retaining existing infringements to lesser Vertical clearances under one ROB and two FOBs to IRSOD (BG) 2004 in Thane (TNA)- Kalyan (KYN) section in connection to modification of existing 1500 Volts DC traction to 25 KV AC traction of Mumbai Division of Central Railway
2013/CEDO/SD/12 25.09.2013 Condonation  for retaining existing infringements to lesser Horizontal clearances to 04 nos of HT overhead power line crossings to IRSOD (BG) 2004 in KYN-DW section in connection to modification of existing 1500 Volts DC traction to 25 KV AC traction of Mumbai Division of Central Railway
2013/CEDO/SD/11 23.09.2013 Condonation for retaining existing infringements to lesser Vertical clearances for contact wire height at the existing LC Gates at Diva Jn. (DW) & Thakurli (THK) in KYN-DW section of Mumbai Division of Central Railway in connection  to modification of existing 1500 Volts DC traction to 25 KV AC traction
2013/CEDO/SD/10 26.09.2013 Condonation  for retaining existing infringements to lesser Vertical and Horizontal clearances to (08 + 02 nos.) ; 66 KV (02nos), 132KV (03 + 02 nos.) and 220KV (03 nos.) overhead power line crossings to IRSOD (BG) 2004 in Ankleshwar -  Rajpipla section in connection with Gauge Conversion of NG line to BG line Work of Vadodara Division of Western Railway
2013/CEDO/SD/09

29.08.2013

09.07.2013

Tikiapara station : Condonation of existing infringing gradients at Tikiapara Station Yard of Tikiapara-Santragachi section of Kharagpur Division on South Eastern Railway.
2013/CEDO/SD/08 14.05.2013 Condonation  for retaining existing infringements to lesser Horizontal clearances to 1 no. 220 KV Double Circuit Power line crossings of BBMS to IRSOD (BG) 2004 in Jn. Cabin TKD-Palwal section at Km. 1500/26-28, in connection with Construction of 4th line of Delhi Division of Northern Railway
2013/CEDO/SD/07 13.05.2013 Temporary condonation (upto 31.12.2013) for infringements due to lesser vertical and horizontal clearances under Foot Over Bridge (FOB) (SRE end) at km. 67/275 over line no. 1 & 2 at Meerut City station on SRE-MTC section of Delhi Division of Northern in connection with Railway Electrification
2013/CEDO/SD/05 10.04.2013 Condonation  for retaining existing infringements to lesser vertical and horizontal clearances to (Five nos.) 01 no. 66 KV, 01 no. 132KV and 03 nos. 220KV overhead power line crossings to IRSOD (BG) 2004 in Jallandhar Cantt-Suchipind section in connection with Doubling Work of Firozpur Division on Northern Railway
2013/CEDO/SD/06 01.04.2013 Condonation  for retaining existing infringements of lesser vertical clearances for 15 nos. (11 nos. Permanent & 04 nos. Temporary) overhead power line crossings to IRSOD (BG) 2004 in Pathankot (Incl.) – Jammu Tawi (Incl.) section in connection with Railway Electrification Work of Northern Railway.
2013/CEDO/SD/03 01.04.2013 Condonation for retaining existing infringements of lesser horizontal clearance for 1 no. 66 kV overhead power line crossing at chainage Km 95.790 (from CDG) to IRSOD 2004 in Sahnewal-Madhpur section of Firozpur Division on Northern Railway
2013/CEDO/SD/04 01.04.2013 Condonation for retaining existing infringements of lesser horizontal clearance for 1 no. 132 KV  D/C Railway overhead power line crossing at Km. 66, between OHE Mast Location Km. 66/6-7 to IRSOD 2004 in Panipat- Khukrana section of Delhi Division on Northern Railway.
2013/CEDO/SD/01 28.03.2013 Condonation of infringement in the existing engineering structures (ROBs/FOBs) regarding Electrification of Madurai – Vanchimaniyachchi – Tuticorin & Vanchi Maniyachi – Tirunelveli section of Southern Railway
2013/CEDO/SD/02 25.02.2013 Condonation of infringement in the existing steel Foot Over Bridge (FOB) no. 1479A at Madurai Yard; regarding Electrificationof Dindigul- Madurai section of Southern Railway.
2012/CEDO/SD/04 28.01.2013 Condonation of infringing gradients on proposed yard arrangements at Kallakkudi Palanganathan yard of Villupuram-Dindigul section f Southern Railway.
2012/CEDO/SD/38 22.01.2013 Condonation of infringements in the existing structure to the SOD of FOB at Budhapank station in East Cost Railway.

2012/CEDO/SD/37

22.01.2013

Condonation of infringements in the existing structure to the SOD of FOB at Meramandali station in East Cost Railway.

 




Source : Ministry of Railways (Railway Board) CMS Team Last Reviewed on: 04-11-2013  

Admin Login |  Site Map  |  Contact Us  |  RTI  |  Disclaimer  |  Terms & Conditions  |  Privacy Policy  Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.