|
03.08.2018
|
Third Party Audit of Railway Bridges/ ROBs/ FOBs.
|
|
02.07.2018
|
Inspection of Railway Bridges/ROBs before commissioning
|
|
09.05.2018
|
Approval of GADs / detailed drawings of bridges for Private Sidings
|
|
28.03.2018
|
Inspection of RUB/LHS by ADEN/DEN/Sr. DEN during monsoon.
|
|
08.12.2017
|
Audit Para Chapter 1 of CAG Report No. 24 of 2015 (Vol.II) review on Maintenance of Bridges in Indian Railway.
|
|
08.12.2017
|
Execution of Bridge Rehabilitation Works/RUBs/ROBs and Strengthening of Bridge Organisation
|
|
27.10.2017
|
Delay in construction of railway bridges on replacement account
|
|
21.09.2017
|
Inspection and rehabilitation of ORN-1 2 Bridges.
|
|
11.09.2017
|
Inspection & Maintenance of Railway Affecting Works ( RAWs) and Liaison with Railways.
|
|
24.08.2017
|
Safety precautions and prevention/ readiness for Accident
|
|
03.08.2017
|
Construction of Bridges during doubling
|
|
31.07.2017
|
Correction Slip No. 35 to Indian Railway Bridge Manual
|
|
31.07.2017
|
Use of Spherical Bearing for long span Bridge girders
|
|
20.06.2017
|
Replacement of Steel Girders upto 9.15m by PSC Slabs
|
|
26.05.2017
|
Inspection of new steel Bridge Girders.
|
|
26.05.2017
|
Retention of existing Free board.
|
|
25.05.2017
|
Welders Qualification Test (WQT) procedure for fabrication of Steel Bridge Girders.
|
|
17.05.2017
|
Use of Phased Ultrasonic Testing (PAUT) in NDT testing of Butt welds in fabrication of steel Bridge Girders
|
|
19.05.2017
|
Use of phased array ultrosonic testing (PAUT) in NDT testing of butt welds in febrication of steel bridge girder.
|
|
27.04.2017
|
Monsoon Precatutions 2017-18.
|
|
23.03.2017
|
Committee Report on Holistic Review of Civil Engineering Workshop ( Bridge workshops on Indian railway
|
|
09.03.2017
|
Approval of design basis of Important Bridges by RDSO
|
|
15.11.2016
|
Type of Foundation for Railway Bridges
|
|
28.07.2016
|
Proper framing of Works Programme proposals under PH-32 Bridge Works.
|
|
08.06.2016
|
Fabrication of Bridge Girders & FOB through Bridge Workshops.
|
|
06.06.2016
|
Stability of Cutting
|
|
04.12.2015
|
Guide line for repair rehabilitation / rebuilding of Bridges.
|
|
01.12.2015
|
Protection arrangements for RCC Box Culverts & RUB / LHS.
|
|
16.11.2015
|
Status & Maintenance of Guide bunds of Railway bridges.
|
|
29.10.2015
|
Provision of man refuges on girder bridges
|
|
13.10.2015
|
Provision / availability of Binoculars for Bridge Inspection
|
|
21.09.2015
|
Feeding of Bridge Management (Master Data)
|
|
09.09.2015
|
Measurement of longitudinal movement of Bridge bearings
|
|
31.08.2015
|
Use of High Strength Friction Grip (HSFG) bolts on Indian Railways
|
|
02.07.2015
|
Installation of Water level monitoring system at Railway Bridges
|
|
25.06.2015
|
Availability of relieving girder in adequate nos.
|
|
29.05.2015
|
Construction of Road Under Bridge (RUBs)
|
|
12.05.2015
|
Approval of General Arrangement Drawing (GAD) of major Bridges on DFCCIL alignment.
|
|
21.04.2015
|
Span arrangement of Railway Bridge
|
|
19.02.2015
|
Inspection of POT – PTFE bearings.
|
|
04.02.2015
|
Calculation of water ways, foundation design etc.
|
|
22.09.2014
|
Time bound action plan for reducing temporary as well as permanent speed restrictions on bridges.
|
|
|
Providing necessary inspection arrangements for new bridges.
|
|
|
Adoption of Open foundation for railway bridge
|
|
|
Use of Standard drawings on railway system
|
|
|
Proper framing of Works Programme proposals under PH-32 Bridge Works
|
|
|
Planning of new important bridges
|
|
|
Nomination of Bridge Workshops – Secondary source.
|
|
|
Inspection of Steel Bridge Girders- Quality Control Thereof.
|
|
|
Approval of GADs of bridges for the lines executed by RVNL.
|
|
|
Sanction of detailed Estimates
|
|
|
Inspection of welded girders- quality control thereof.
|
|
|
Bridges with Well/Pile foundations- Fixing of Safe Scour Depth.
|
|
|
RUBs-Provisions of Covers to prevent falling of waste /Garbages on road users
|
|
|
Man Refuge on through open web girder bridges.
|
|
|
Estimation of Design Discharge
|
|
|
Fabrication inspection of steel bridge girders.
|
|
|
Use of 30.5M Composite Girder welded type on Indian Railways.
|
|
|
Adoption of steel super structure of bridges for spans more than 24.4m.
|