Policy Letter No.
|
Subject |
Date
|
Remarks
|
2023 |
2017/CE-I/WP/2018-19/1Pt. |
Necessary modalities have been incorporated in IRPSM portal - Gati shakti and DRM priority works |
30.01.2023 |
|
2018/CE-I/CT/30 |
Implementation of Increased GST rates in Works Contracts |
04.01.2023 |
|
2022 |
2018/CE-I/CT/30/Pt.I |
Introduction of new module of e-Pay Order in IR-WCMS |
26.12.2022 |
|
2022/CE-I/CT/07 |
List of Architectural Firms empanelled for providing Architectural Consultancy for Re-Development of Railway Stations |
26.12.2022 |
|
2018/CE-I/CT/36-EPC Contract Policy Pt. I |
Standard EPC Tender Document for Single Stage Two Packet System dated 15.11.2021 (Amendment No.2) |
19.12.2022 |
|
2022/CE-I/CT/GCC-2022/Policy |
Indian Railways Standard General Conditions of Contract, April 2022 (Advance Correction Slip No. 2) |
13.12.2022 |
|
2018/CE-I/CT/30/Pt.2 |
Implementation of Service Contracts in IR-WCMS as per GCC of Service Contract across Indian Railways including Zonal HQs, & Construction Organizations |
05.12.2022 |
|
2018/CE-I/CT/30 |
Reminder- Implementation of IT Application Works Contract Management System (IR-WCMS) on Construction units of Indian Railways |
22.11.2022 |
|
2015/CE-I/CT/O/20/1 |
Formation of Tender Committee |
11.11.2022 |
|
2017/CE-I/WP/2018-19/1Pt |
Procedure to be followed for execution of Umbrella Works under different Plan Heads |
27.10.2022 |
|
2022/CE-I/CT/6/PSS |
Project Supervision Services (PSS) - Contract |
20.10.2022 |
|
2022/CE-I/CT/5/Engg.CodeRevision |
Indian Railway Code for Engineering Department - Advance Correction Slip No. 60. |
20.10.2022 |
|
2022/CE-I/CT/07 |
Approved list of consultants/firms for undertaking Detailed Project Report (DPR) preparation work, Detail Design Consultancy (DDC) work and Project Management Services (PMS) work. |
19.10.2022 |
|
2022/CE-I/CT/8/CPWDDSR |
Adoption of CPWD Delhi Schedules of Rates - 2021 (DSR-Vol.I, DSR-Vol. II, DSR-Horticulture & Landscaping), Analysis of Rates for DSR (AOR-Vol. I, AOR-Vol. II) and CPWD Specification Vol. I, Vol. II) and IRUSSOR-2021 on Indian Railways |
13.10.2022 |
|
2017/CE-I/WP/2018-19/1 Pt. |
Procedure to be followed for execution of Umbrella Work under different Plan Heads |
14.10.2022 |
|
2022/CE-I/CT/07 |
Approved list of consultants/firms for undertaking consultancy services for Detailed Project Report (DPR) preparation work, Detailed Design Consultancy (DDC) work and Project Management Consultancy (PMC) work. |
15.09.2022 |
|
2022/CE-I/CT/6/PSS |
Procurement of Project Supervision Agency (PSS) and Project Management Services (PMS) |
18.08.2022 |
|
2018/CE-I/CT/30 |
Login ID's of Admin users of IRPSM and WCMS for Gati Shakti Unit in Divisions of Indian Railways |
05.08.2022 |
|
2018/CE-I/CT/30 |
Implementation of 'Contractor's e-MB' for Measurement and Billing of Works Contracts in IR-WCMS on Zonal Railways |
01.08.2022 |
|
2022/CE-I/CT/GCC-2022/Policy |
Indian Railways Standard General Conditions of Contract, April-2022 (Advance Correction Slip No. 1) |
14.07.2022 |
|
2020/CE-I/USSOR/W&M/1 |
'Indian Railways Unified Standard Schedule of Rates' (IRUSSOR- 2021), Basic Rate Sheet-2021 and 'Analysis of Rate-2021', for execution of Bridges works, Formation works and P.Way works |
05.07.2022 |
|
2018/CE-I/CT/30 |
Implementation of Contractor e-MB for Billing and Measurement of Works Contracts in IT Application Works Contract Management System (IR-WCMS) |
30.06.2022 |
|
2022/CE-I/CT/07 |
Approved list of consultants/firms for undertaking consultancy services for Detailed Project Report (DPR) preparation work, Detailed Design Consultancy (DDC) work and Project Management Consultancy (PMC) work. |
30.06.2022 |
|
2018/CE-I/CT/30 |
Implementation of IT Application Works Contract Management System (IR-WCMS) on Construction units of Indian Railways |
24.06.2022 |
|
2022/CE-I/CT/6/PSS |
Model Document of Request for Proposal for Appointment of Project Supervision Services Agency (PSSA) for providing Project Supervision Services (PSS) at various Construction Site/Sections |
13.06.2022 |
|
2022/CE-I/CT/6/PSS |
Project Supervision Services (PSS) - Contract |
01.06.2022 |
|
018/CE-I/CT/36-EPC Contract Policy Pt.I |
Standard EPC Tender Document for Single Stage Two Packet System |
20.05.2022 |
|
E(NG)II/2021/RC-4/1 |
Engagement of Ex-Serviceman against vacancies in Safety Categories of Bridge Organization, Track Machine organization and other similar technical safety categories on Contract Basis |
12.05.2022 |
|
2022/F(X)II/PW/1 |
Delegation of Powers to CAO/Con for construction projects |
10.05.2022 |
|
2022/CE-I/CT/3/PMS |
Model Document of Request for Proposal for appointment of Authority Engineer for providing Project Management Services. |
05.05.2022 |
|
2018/CE-I/CT/30 |
Implementation of IT Application Works Contract Management System (IRWCMS) on Construction units |
04.05.2022 |
|
2022/CE-I/CT/GCC-2022/POLICY |
Dispute Adjudication Board (DAB) |
27.04.2022 |
|
2022/CE-I/CT/GCC-2022/POLICY |
Corrigendum Slip No. 10 to Model SOP 2018 |
27.04.2022 |
|
2022/CE-I/CT/GCC-2022/POLICY |
Offloading of Part(s) of Work |
27.04.2022 |
|
2022/CE-I/CT/GCC-2022/POLICY |
Indian Railway Code for Engineering Department - Advance Correction Slip No. 58 |
27.04.2022 |
|
2022/CE-I/CT/GCC-2022/POLICY |
Indian Railways Standard General Conditions of Contract, April-2022 |
27.04.2022 |
|
2013/CE-I/CT/O/10/PVC/Pt.I |
Price Variation of Steel Items - SAIL Ex-Works Prices of Steel |
26.04.2022 |
|
2017/CE-I/CT/13/Procedure Simplification |
Standard Procedure Order for ESP, SIP & GAD approval in Zonal Railways |
22.04.2022 |
|
2007/CE-I/CT/18/Pt.-I (Vol II) |
Project Management Consultancy (PMC) Services |
23.03.2022 |
|
2018/CE-I/CT/1 |
Rate of interest on 'Advance to Contractors' |
10.03.2022 |
|
2020/CE-I/CT/3E/GCC/Policy |
Indian Railways Standard General Conditions of Contract, July 2020 (Performance Guarantee) |
10.01.2022 |
|
2021 |
2020/CE-I/CT/3E/GCC/Policy |
Advance Correction Slip (ACS) No.3 to IRs Standard GCC, July 2020 |
30.12.2021 |
|
2016/Track-I/29/3/1(3) TMS Misc |
Data Uploading in e-application TMS for identification of Structures Infringing Clearances required for Running of Double Stack Dwarf Container Trains (DSDC) |
27.12.2021 |
|
2020/CE-I/CT/5/IRPSM |
IRPSM : Updation of Data |
09.12.2021 |
|
2013/CE-I/CT/O/10/PVC/Pt.1 |
Price Variation of Steel Items - SAIL Ex-Works Prices of Steel |
05.10.2021 |
|
2015/CE-I/CT/O/20/1 |
Power of Acceptance of Works Tender |
14.09.2021 |
|
2021/CE-I/EDCE(G)/Misc./3/LabourIndex |
Change of Base Year of Consumer Price Index of Industrial Workers (Labour Index) |
06.09.2021 |
|
2020/CE-I/CT/10E/GCC Policy |
Payment of PVC in tunneling works in contract agreements as per GCC-2014 |
31.08.2021 |
|
2018/CE-I/CT/36-EPC Contract Policy |
Standard EPC Tender Document for single stage two packet system |
24.08.2021 |
|
2020/CE-I/CT/3E/GCC/Policy |
Advance Correction Slip (ACS) No. 2 to IRs Standard GCC, July 2020 |
08.07.2021 |
|
2009/ CE-I/CT/14/Main |
Fee and Emoulments to Arbitrators |
09.04.2021 |
|
2020/ CE-I/CT/12/IR-RLCAS |
Implementation of Revised Version of IR-RLCAS (IR-Railway Line Crossing Approval System) for Wayleave Easement Rights over all Zonal Railways |
17.03.2021 |
|
2021/CE-I/CT/SI/1 |
Improvement of Quality in Construction Works |
04.03.2021 |
|
2018/AC-II/1/57(M&P) |
Standard Novation Agreement - EBR-IF Funded Contracts |
17.02.2021 |
|
2018/CE-I/CT/1 |
Rate of Intrest on Advances to Contractors for the F.Y. 2021-22 |
08.02.2021 |
|
2018/AC-II/1/57 |
Novation Agreement for contracts under EBR-S Sources of funding |
03.02.2021 |
|
2013/CE-I/CT/O/10/PVC/Pt.1 |
Price Variation of Steel Items - SAIL Ex-Works Prices of Steel |
28.01.2021 |
|
2020
|
2020/CE-I/CT/ARB/4E/Arbitration Fee |
Fee and Emoluments to Retired Railway Officer(s) Working as Arbitrators |
31.12.2020 |
|
2020/CE-I/CT/3E/GCC/Policy |
Indian Railways Standard General Conditions of Contract, July 2020 (Bid Security/Earnest Money Deposits) |
30.12.2020 |
|
2018/CE-I/USSOR/I/W&M |
Adoption of CPWD Delhi Schedule of Rates and IRUSSOR-2019 & IRUSS-2019 on Indian Railways |
09.12.2020 |
|
2020/CE-I/CT/ARB/2E |
Arbitration Hearing through Video conferencing |
08.12.2020 |
|
|
Price Variation of Steel Items - SAIL Ex-Works Prices of Steel |
24.11.2020 |
|
|
Advance Correction Slip (ACS) No. 1 to IRs Standard GCC, July 2020 |
20.11.2020 |
|
2020/CE-I/CT/3E/ GCC/Policy |
Indian Railways Standard GCC, July 2020 (Performance Guarantee) |
20.11.2020 |
|
2020/CE-I/CT/5/E/IR-LAMS |
Implementation of IR-Land Asset Management System (IR-LAMS) over IR |
16.10.2020 |
|
2017/CE-I/CT/9 |
Simplification of Procedure for Acceptance of Works Tenders |
10.09.2020 |
|
2020/CE-I/CT/2/GCC/ Correspondence |
Restrictions under Rule 144(xi) of General Financial Rules (GFRs), 2017 |
11.08.2020 |
|
2020/CE-I/CT/3E/GCC/Policy |
Indian Railways Standard General Conditions of Contract, July 2020 |
16.07.2020 |
|
2020/CE-I/CT/2/GCC/Correspondence |
Global Tender Enquiry (GTE) as Per MOF OM no. 12/17/2019-PPD dated 28.05.2020 & another OM of even no. dated 28.05.2020 |
29.06.2020 |
|
2018/CE-I/CT/30 |
Implementation of IT Application - IR Works Contract Management System (IR-WCMS) |
12.06.2020 |
|
2018/CE-I/CT/38/GCC/ Correspondence |
Payment of wages to outsourced persons of Ministries/Departments and other organizations of Government of India during lockdown period due to COVID-19 |
03.06.2020 |
|
2012 /CE-I/ CT/ O/ 5 |
Relaxation of Eligibility Criteria for Startups (Recognized by Department of Industrial Policy and Promotion, Ministry of Commerce and Industry) in Works tenders |
01.06.2020 |
|
2018/CE-I/CT/38 /GCC /Correspondence |
Security Deposit in Existing works Contracts |
21.05.2020 |
|
2018/CE-I/CT/38 /GCC /Correspondence |
Payment of wages to outsourced persons of Ministries / Departments and other organizations of Government of India during lockdown period due to COVID-19 |
21.05.2020 |
|
2018/CE-I/CT/38 /GCC /Correspondence |
Amendment in General Financial Rules (GFR), 2017 - Global Tender Enquiry |
21.05.2020 |
|
2014/CE-I/WP/5/Pt. |
Contractor Performance Appraisal Report by last Engineer incharge of the Work |
19.05.2020 |
|
2018/CE-I/CT/37/GCC/Policy |
Release of Performance Guarantee |
15.05.2020 |
|
2018/CE-I/CT/37/GCC/ Policy |
Advance correction Slip (ACS) No.1 to IRs Standard GCC, September 2019 |
12.05.2020 |
|
2016/CE-I/CT/ARB/3 (Niti Aayog) Pt. |
Measures to revive the construction sector |
05.05.2020 |
|
2018/CE-I/CT/38/GCC/ Correspondence |
Performance Guarantee - Delay in Submission due to lockdown period |
22.04.2020 |
|
2018/CE-I/CT/30 |
Implementation of IT Application works Contract Management System (IR-WCMS) |
21.04.2020 |
|
2018 /AC-II /I /57 (Pt,) |
Standard Novation Agreement EBR-IF Funded Contracts |
20.03.2020 |
|
94/CE-I/CT/4 (pt-17) |
Two Packet System of Tendering - System Improvement |
20.02.2020 |
|
2017/CE-I/CT/9 |
Simplification of Procedure for Acceptance of Works Tenders up to Rs. 5 Crore. |
08.01.2020 |
|
2019/CE-I/SP/I |
ACS No.57 to Indian Railways Code for the Engineering Deaprtment, 1982 fourth Re-Print 2012. |
08.01.2020 |
|
2009/CE-I/CT/14/Maim |
Fee and Emoluments to Retired Railway officer(s) working as Arbitrator in Standing Arbitral Tribunal. |
02.01.2020 |
|
2015/CE-I/CT/O/20/1 |
Power of acceptance of Works Tenders. |
01.01.2020 |
|
2019 |
2019/CE-I/CT/5 |
Consultancy Contracts Modification in the powers of CAOs Construction. |
12.12.2019 |
|
2018/CE-I/USSOR/I/W&M |
Adoption of CPWD Delhi Schedule of Rates (DSR-Vol.I, DSR-Vol. II, DSR-Horticulture & Landscaping), Analysis of Rates for DSR (AOR-Vol.I, AOR-Vol.II & CPWD Specifications (Vol.I, Vol.II) and IRUSSOR-2019 & IRUSS-2019 on Indian Railways. |
06.12.2019 |
|
2018/CE-I/CT/1 |
Rate of Interest on Advances to Contractors for F.Y. 2020-21 |
05.12.2019 |
|
2019/CE-I/USSOR/W&M/I |
Indian Railways Unified Standard Schedule of Rates (IRUSSOR-2019) and Indian Railways Unified Standard Specifications (IRUSS-2019) for execution of Bridges works, Formation works and P.Way works |
26.11.2019 |
|
20-18/CE-I/CT/30 |
Implementation of IT Application Works Contract Management system |
29.11.2019 |
|
2019/CE-I/WP/2020-21/1 |
Processing for Works Programme 2020-21 on Indian Railways |
13.11.2019 |
|
2018/CE-I/CT/37/GCC/Polcy |
Indian Railways Standard General Condition of Contract. |
06.09.2019 |
|
2009/CE-I/CT/14/Main |
Fee and Emoluments to Retired Railway Officer(s) working as Arbitrator(s) |
04.09.2019 |
|
2008/CE-I/CT/6 |
Building and Other Construction Works' Welfare Cass (BOCWWC), Act, 1996 - Clarification reg. |
13.08.2019 |
|
2009/CE-I/CT/14/Main |
Payment of Arbitration Fee to Retired Railway Officers. |
02.08.2019 |
|
2013/CE-I/CT/O/10/PVC/Pt.I |
Price Variation for Steel Items – SAIL Ex-works price of steel. |
12.06.2019 |
|
2019/RS(M)/Paperless Working |
Online Refund of EMDs/Tender document cost through digital pay orders. |
31.05.2019 |
|
2012/CE-I/CT/O/5 |
Relaxation of eligibility for startups (recognized by Department of Industrial Policy and Promotion, Ministry of Commerce and Industry)’ in Works tenders. |
24.04.2019 |
|
2009/CE-I/CT/14/Main |
Fee and Emoluments to Retired Railway Officer(s) Working as Arbitrator(s)-reg. |
01.04.2019 |
|
2007/CE-I/CT/18/Pt.3 |
Indian Railway Code for Engineering Department - Advance Correction Slip No. 56 |
05.03.2019 |
|
2018/CE-I/CT/1 |
Rate of Interest on Advances to Contractors for F.Y.2019-20 |
15.02.2019 |
|
2018/CE-I/CT/30 |
Payment of bills under Demand No. 16 – Linking of IRPSMs’s Unique Works Identification Number (UWID). |
08.02.2019 |
|
2017/CE-I/CT/18/Pt.-I (Vol.II) |
Addendum & Corrigendum Slip to Model PMC tender Document. |
07.02.2019 |
|
2018/CE-I/CT/8 |
Advertisement of Works Tender Notices in Newspapers. |
07.01.2019 |
|
2018
|
2017/CE-I/CT/8/GCC/ Committee |
Indian Railways Standard General Conditions of Contract, November 2018 |
05.11.2018 |
2018/CE-I/CT/4 |
Special Condition of Contract for mandatory updation of Labour data on Railway's Sharamik Portal by Contractor |
17.10.2018 |
2007/CE-I/CT/18/Pt.19 |
Change of base year of All-India Wholesale Price Index (WPI) and its effect on PVC in Railway Works Contracts. |
28.08.2018 |
2018/CE-I/CT/8 |
Advertisement of Tender Notice in News Papers – Tenders invited through IREPS |
09.08.2018 |
2017/CE-I/WP/2018-19/1 pt. |
Procedure to be followed for Execution of Umbrella Works under different Plan Heads. |
07.08.2018 |
2014/CE-I/WP/5/Pt. |
Implementation of Electronic Reverse Auction (e-RA) in Works and Service contract on Indian Railways. |
03.08.2018 |
201/CE-I/CT/O/10/PVC/Pt.I |
Price variation for Steel Items's Ex-works price of steel. |
31.07.2018 |
2017/CE-I/CT/19 |
Empowerment of field organization-Works Contract Matters.
|
31.07.2018 |
2017/CE-I/WP/2018-19/1 pt. |
Procedure to be followed for Execution of Umbrella Works under different Plan Heads |
19.07.2018 |
2017/CE-I/WP/2018-19/1 Pt. |
Procedure to be followed for Execution of Umbrella Works under different Plan Heads. |
13.06.2018 |
2018/CE-I/CT/9 |
Inclusion of Letter of Credit as Mode of payment in Works Tender or Service Tender. |
04.06.2018 |
2009/CE-I/CT/14/Main |
Fee and Emoluments to Retired Railway Officer(s) Working as Arbitration (s)-reg. |
11.05.2018 |
2013/CE-I/CT/O/10/PVC/Pt.I |
Price Variation for Steel Items – Ex-works price of steel notified by SAIL |
11.05.2018 |
2013/CE-I/CT/O/10/PVC/Pt.I |
Price Variation for Steel Items – Ex-works price of steel notified by SAIL |
25.042018 |
2018/CE-I/CT/AP/2 |
Audit Para No. 2.3 for the year 2013-14 of C&AG Report No. 13 of 2016 (Railways) regarding ‘’Irregular award of contract’’. |
17.04.2018 |
2017/CE-I/CT/7/GST |
Impact of GST on Existing Works Contracts. |
16.04.2018 |
2017/Trans/01/Policy |
Process Reforms - Works Contracts (For expedite decision making & execution of works, Remove PVC Clause in all works contracts tenders less than 5 crore, changes approved by ME, FC & CRB) |
08.02.2018 |
2007/CE-I/CT/18/Pt.3
|
Indian Railway code for Engineering Department – Advance Correction Slip No. 54 |
22.01.2018 |
2018/CE-I/CT/1 |
Rate of Interest on Advances to Contractors for F.Y. 2018-19 |
22.01.2018 |
2018/CE-I/Innov/1 |
Use of patented Items in Works Contract. |
18.01.2018 |
2009/CE-I/CT/14/Main |
Fee and Emoluments to Retired Railway Officer(s) Working as Arbitrator(s)-reg. |
17.01.2018 |
2009/CE-I/CT/14/Main |
Modification to clause 64 of General Condition of Contract – 2014 for implementation of Arbitration and Conciliation (Amendment) Act 2015. |
17.01.2018 |
2015/CE-I/CT/AP/1 |
Audit Para No. Chapter-2 for the year 2013-14 (Railways) regarding ''Management of Works Contract in Indian Railways''- Pre-requisite for calling of tenders. |
16.01.2018 |
2017
|
2015/CE-I/CT/AP/1(pt.) |
Audit Para No. Chapter-2 for the year 2013-14 (Railways) regarding ''Management of Works Contract in Indian Railways'' |
15.12.2017 |
2017/Trans/01/Policy |
Process Reforms - Engagement of consultants |
27.11.2017 |
2001/CE-I/CT/17/pt.III |
Indian Railway Code for Engineering Department – Advance Correction Slip No.53 |
06.11.2017 |
2017/CE-I/CT/7/GST |
Impact of GST on Existing Works Contracts. |
27.10.2017 |
2017/CE-I/CT/10-Procurement Cycle |
Reduction in Tender Notice Period for Works Values upto Rs 2 crore – ACS No. 52 to Para 1238 of Engineering Code. |
23.10.2017 |
2017/CE-I/CT/13/Procedure Simplification |
Approval of Engineering Drawings |
20.10.2017 |
F(X)II-2015/PW/7 |
Delegation of Powers to General Managers-Item no.39(B) regarding |
05.10.2017 |
2001/CE-I/CT/17/Pt.III |
Indian Railway Code for Engineering Department – Advance Correction Slip No. 51 |
27.09.2017 |
2016/CE-I/CT/14/Measurement/1 |
Indian Railway Code for Engineering Department – Advance Correction Slip No. 50 |
21.09.2017 |
2016/CE-I/CT/14/Measurement/2 |
Indian Railways Standard General Conditions of Contract – 2014 – Advance Correction Slip |
21.09.2017 |
2016/CE-I/CT/14/Measurement/3 |
Measurement of work by Contractor in Works Contract |
21.09.2017 |
2007/CE-I/CT/18/Pt.1(Vol.II) |
Addendum & Corrigendum Slip to Model PMC tender document and revised guidelines for implementing PMC services in Railways |
14.09.2017 |
2015/CE-I/CT/O/20/1 |
Power of acceptance of works Contract. |
14.09.2017 |
2017/CE-I/CT/9 |
Simplification of Procedure for Acceptance of Works Tenders upto Rs. 2 crore |
11.09.2017 |
2007/CE-I/CT/18/Pt.13 |
Powers to dispense with calling of tenders (Calling of quotations) |
11.09.2017 |
2016/CE-I/CT/ARB/3 (NITI Aayog) |
Monitoring of Arbitration cases for implementation of instructions related to ’Measure to revive Construction Sector’ issued by NITI Aayog. |
04.08.2017 |
2016/CE-I/CT/SI/4 |
Amendment in Clause 6, Part-I of Indian Railways Standard General Condition of Contract2014 – Care in submission of Tenders. |
19.07.2017 |
2017/CE-I/CT/5/GST |
Implication of Introduction ofgoods and Services Tax (GST) on the ongoing contracts. |
05.07.2017 |
2017/CE-I/CT/4/GST |
Amendment in Clause 46.A, Part-II of Indian Railways Standard General Conditions of Contract, July 2014- Price Variation Clause. |
05.07.2017 |
2016/CE-I/CT/12/GST/Pt.I |
Implementation of GST Act, 2017 – Procedure for payment of Contractual bill. |
29.06.2017 |
2017/CE-I/CT/4/GST |
Compliance with the GST Act, 2017- Change in para (a) of Clause 6, Part I of Indian Railways Standard General Conditions of Contract, July 2014. |
23.06.2017 |
2017/W-I/Genl./Survey/1 |
Tender & Contract Management of Survey Works. |
22.05.2017 |
2007/CE-I/CT/18/Pt.13 |
Powers to dispense with calling of tenders (calling of quotations). |
17.05.2017 |
2016/CE-I/CT/ARB/3 (Niti Aayog)/Pt. |
Clarificatiion in regard to monitoring of Arbitration Cases for implementation of instructions related to Measures to revive Construction Sector issued by NITI Aayog. |
01.05.2017 |
2011/CE-I (SPL)/CT/O/4 |
Power for awarding single tender |
02.05.2017 |
2015/CE-I/CT/O/20/1 |
Power of acceptance of Works Contract. |
03.04/2017 |
2016/CE(I)/CT/ARB/3(NITI Aayog)/Pt. |
Standard Operating Procedure (SOP) for release of payments towards the Arbitration award in case of challenge of Arbitration award. |
08.03.2017 |
2011-B-174 |
Reappropriation of Budget Grant Demand No. 16 |
16.02.2017 |
2016/CE-I/CT/ARB/3(NITI Ayog)/Pt.2
|
Modus Operandi for switching over to the Arbitration and Conciliation (Amendment) Act 2015, based on recommendation of NITI Aayog. |
31.01.2017 |
2016/CE-I/CT/ARB/3 (NITI Aayog) |
Monitoring of Arbitration Cases |
02.01.2017 |
2016 |
2016/CE-I/CT/18/OMC/ Time Frame/Para 13.3 |
Adhering to time frame for finalization of tender.
|
22.12.2016 |
2016/F(X)-II/PW/5 |
Delegation of powers to General Managers. (works/M&P Under Lumpsum provision)_Sanctio of lumsum works. |
07.12.2016 |
2015/CE-I/CT/ARB/18 |
Modification to Clause-64 of General Conditions of Contract 2014 regarding Arbitration |
16.11.2016 |
2016/CE-I/CT/ARB/3(NITI Ayog)/Pt.
|
Measures to revive the Construction Sector. |
08-11-2016 |
2007/CE-I/CT/O/20/1 |
Power of acceptance of Works Tenders |
19.10.2016 |
F(X)II/2016/PW/3/Pt.3 |
Delegation of powers to GMS to sanction detailed/revised estimate Item No. 40(1)_Sanction of detailed estimate. |
14.10.2016 |
2016/F(X)-II/10/17 |
Delegation of Powers to General Managers on certain items of SOP_Sanction of detailed estimate |
05.10.2016 |
F(X)-II/2016/PW/3  |
Delegation of Powers to General Managers on certain items of SOP_Consultancy and sanction of Information Technology works. |
14.09.2016 |
2015/CE-I/CT/5/1 |
Corrigendum Notice & online payment of Earnest Money Deposit (EMC) and Tender Document Cost (TDC) in e-tendering. |
31.08.2016 |
2016/CE-I/CT/3/MSME |
Applicability of Public Procurement Policy for Micro & Small Enterprises in Works Contract |
29.08.2016 |
2007/CE-I/CT/18/Pt.XII |
Requirement of finance vetting for variation upto 150% |
08.07.2016 |
2013_CE-I_CT_1_PG |
Performance Guarantee value in case of negative variation in contract value more than 25%. |
27.06.2016 |
F(X)-II/2011/5/11  |
Delegation of powers_Annual Maintenance Contract |
15.06.2016 |
2013_CE-I_CT_O_45_JV |
Amendment in Clause 5 (2) of Part-I of General Conditions of Contract 2014 – Earnest Money |
23.06.2016 |
2011/CE-I(SPL)/CT/O/4 |
Empowerment of Field Organizations (Works Contract Matters)- Power for awarding Single Tender in projects targeted for completion. |
15.02.2016 |
2014/CE-I/WP/5 |
Training to all Department user of zonal Railways, PUs and CTIs for implementation of ''e- Tendering in Works Contract''. |
05.02.2016 |
2011_CE-I(SPL)_CT_O_4 |
Empowerment to Field Organization (Work Contract Matters)- power for awarding single Tender in projects targeted for completion.
|
28.01.2016 |
2015
|
F(X)II-2014/PW/1 Pt II |
Delegation of Powers to General Managers to Sanction estimates. |
07/10/15 |
2007/CE-I/CT/O/20/1 |
Power of acceptance of Works Tenders |
08.10.2015 |
No. 2015/CE-I/CT/1/1/TS |
Checking of Tender Schedule by the Technical Staff. |
24.08.2015 |
2015/CE-I/CT/AP/1 |
Provisional Paragraph no. 20 regarding “Contract Management (Works contract) in Indian Railways”proposed for inclusion in the Report of the Comptroller and Auditor General of India – Union Govt. (Railways) for the year ended 31.3.14. |
19/06/15 |
No. F(X)II-2014/PW/1 Pt.II |
Delegation of Powers to General Managers. |
29.05.2015 |
2014/CE-I/CT/O/9/RET |
Addendum & Corrigendum Slip (ACS) No. 3 to GCC, July 2014 : Amendment in Para 17 (a) of Tender Form and Clause 59(10)& 62(1)(xii)(A) to GCC regarding employment etc. of retired Government Officers by Railway contractors. |
22.01.2015 |
2013/CE-I/CT/O/10/PVC/Pt.1 |
Non-application of price Variation clause (PVC) to Annual Maintenance Contracts (AMC) and Zonal Contracts. |
27.01.2015 |
88/RS(G)/779/14/Pt.
(O.O. No. 03 of 2015) |
Constitution of Tender Committee and Accepting Authority in Railway Board for supply items (as mentioned in Para 701 & para 702 of Stores Code) for tender invited in Railway Board. |
02.01.2015 |
F(X)II-2014/PW/1 |
Delegation of Powers for acceptance of Contracts. |
01.01.2015 |
2014/O&M/5/1 |
Delegation of Powers in respect of Stores and Works Contract. |
01.01.2015 |
2014
|
2007/CE-I/CT/18/Pt. 19 |
Price Variation Clause – Addendum & Corrigendum Slip (ACS) no. 02 to GCC, July 2014 : Amendment in Clause 46A.1 of GCC |
15.10.2014 |
|
2014/CE-I/CT/O/21/1 |
Display Boards at all works sites of projects, being executed on Indian Railways. |
10.11.2014 |
|
2013/CE-I/CT/0/33 SI |
Submission of documents related to constitution Firm by the Partnership Firm/Society/Companies etc. in tendering process. |
11.10.14 |
|
2014/CE-I/CT/O/11/GCC |
Suggestions for improvement to the existing provisions of IR’s Standard General Conditions of Contract 2014(GCC) . |
29.09.2014 |
|
2013/CE-I/CT/O/45/JV |
Addendum & Corrigendum Slip (ACS) no. 01 to GCC, July 2014 : Amendment in Para 5(2) of Part-I of GCC and Clause 65.5 to GCC. |
22.09.2014 |
|
2014/CE-I/CT/O/19/1 |
Recovery of various taxes/cess from contractors bills in works contracts. |
12.09.2014 |
|
No. 2013/CE-I/CT/28/GCC |
Updated Document on – IR’s General Conditions of Contract (GCC) – July 2014 |
22.07.2014 |
|
2014/CE-I/CT/O/10/TN |
Short Tender Notice. |
18.06.2014/01.07.2014 |
|
2007/CE-I/CT/18/Pt.13 |
Addendum & Corrigendum Slip (ACS) No. 6 to GCC, July 2013 : Amendment to Clause 46A.7 (a sub clause of PVC) to GCC. |
02.05.2014 |
|
2013/CE-I/CT/O/34/SI |
Clubbing of various works in one single contract- Invitation of Tenders. |
18.03.2014 |
|
2007/CE-I/CT/8 |
Guidelines for Vendor Approval in respect of supply of steel (TMT Reinforcement Bars) on Indian Railways. |
07.03.2014 |
|
2013/CE-I/CT/o/29/VAR |
Variation in Works Contracts – Reiteration of para 1265(d) of Engineering Code. |
05.03.2014 |
|
2009/O&M/8/2 |
Power of Acceptance of Works Tenders by MR and MSRs. (Office Order no. 09 of 2014) |
28.01.2014 |
|
2014/O&M/5/1 |
Power of Acceptance of Works Tenders. (Office Order no. 08 of 2014) |
28.01.2014 |
|
2011/CE-I/CT/O/17 |
In-house testing of ballast by Zonal Railways. |
03.02.2014 |
|
No. 94/CE-I/CT/4/Pt.18 |
Procurement of materials from IS approved firms |
27.01.2014 |
|
2013/CE-I/GNS/29 |
Implementation of already agreed to recommendations of the Joint Committee on Package and Career Progression for Trackman. |
01.01.2014 |
|
2013
|
95/CE-I/CT/24 Pt. (duplicate) |
Provision of Pass facility to the Arbitrator/Co-arbitrators (Retire Railway Officers) |
06.12.2013 |
|
2008/CE-I/CT/6 |
Addendum & Corrigendum Slip (ACS)No. 4 to GCC, July 2013 : Clause 55-C : Implementation of " The Building and Other Construction Workers (RECS) Act, 1966" and " The Building and Other Construction Workers' Welfare Cess Act, 1996" in works contracts on Indian Railways. |
29.11.2013 |
|
2013/CE-I/CT/O/20/Pt.II(ii) |
Power for calling Limited Works Tenders |
26.11.2013 |
|
2007/CE-I/CT/13(i) |
Power of acceptance of Works Tenders |
26.11.2013 |
|
2013/CE-I/CT/O/36/TOC/Pt.-I |
Addendum and Corrigendum Slip no. 1 to GCC , July 2013: Amendment in Performa of 48 hours notice. |
14.11.2013 |
|
2011/CE-I/CT/O/4 |
Power for awarding Single Tender in projects, targeted for completion in that financial year. |
14.11.2013 |
|
94/CE-I/CT/4 (Pt.-II) |
Addendum and Corrigendum Slip (ACS) No. 3 to GCC July 2013: Submission of Income Tax Clearance Certificate (ITCC) by contractors in Works Contracts-Finalization of Tenders. |
14.11.2013 |
|
2002/CE-I/CT/37 JV Pt III |
Advance Correction Slip no. 2 to GCC, July 2013: Amendment in Clause 65.15.4 regarding Joint Ventrue |
14.11.2013 |
|
2012/CE-I/CT/ARB/24 |
Amendment to Clause 64 (3)(a)(i) of the General of Contract-raising the limit for sale Arbitrator from Rs. 10,00,000 (Rupees ten lakh) to Rs. 25,00,000 (Rupees twenty five lakh). |
05.11.2013 |
|
2007/CE-I/CT/13 |
Power of acceptance of Works Tenders. |
27.08.2013 |
|
2012/CE-I/CT/O/10 |
Mention in the Letter of Acceptance (LOA) regarding rates restricted for future reference. |
26.08.2013 |
|
2013/CE-I/CT/O/25/VOC |
Upkeep and record of Measurement Books (MBs) by field units. |
26.08.2013 |
|
2013/CE-I/CT/O/25/VOC |
Assessment of capacity/capability of tenderer. |
05.08.2013 |
|
2013/CE-I/CT/28/GCC |
Updated Document on - Indian Railways Standard'General Conditions of Contract'(GCC) |
02.08.2013 |
|
2013/CE-I/CT/O/25/VOC |
Detailed measurement of repetitive works based upon SMBs. |
01.08.2013 |
|
2012/CE-I/CT/O/12 |
Recording of final measurement in Measurement Book (MB) of old contracts before entering into new contracts. |
29.07.2013 |
|
2012/CE-I/CT/O/20 |
Utilisation of Engineers in P.Way contracts having qualification of Diploma in Railway Engineering, awarded by IPWE (India).
|
12.07.2013 |
|
98/W-I/Genl./0/30/Pt.-I  |
Entering into contractual liabilities before land acquisition. |
03.07.2013 |
|
2013/CE-I/CT/O/12/ZT |
Working out estimated cost (NIT value) for calling of tenders. |
07.06.2013 |
|
2012/CE-I/CT/0/20 |
Modification of Clause 26 and introduction of new clause 26A to IR's General Conditions of Contract (GCC).
|
10.05.2013 |
|
2007/CE-I/CT/18/Pt.19 |
Modification to Railway Board’s letter of even no. dated 14.12.2012 regarding Price Variation Clause (PVC) 46A to IR’s General Conditions of Contract (GCC)- ‘General Instructions’.
|
07.05.2013 |
|
2002/CE-I/CT/37 JV Pt. VIII |
Participation of Joint Venture Firms in Works Tenders on Indian Railways- Additional Provisions for GM/CORE & CAO/USBRL/NR. |
08.01.2013 |
|
|
|
|
|
2012
|
2012/CE-I/CT/0/22 |
Application of the provisions of employees provident fund & miscellaneous provisions act, 1952 and employees deposit linked insurance scheme, 1976 to railway contracts. |
14.12.2012 |
|
No.2002/CE-I/CT/18 Pt. 19 |
Price Variation Clause 46A to IR’s General Conditions Of Contract (GCC)- ‘General Instructions’. |
14.12.2012 |
|
No.2002/CE-I/CT/37 JV Pt. VIII |
Participation of Joint venture Firms in Works Tenders on Indian Railways. |
14.12.2012 |
|
2008/CE-I/CT/6 |
Implementation of "The Building and Other Construction Workers" Welfare Cess Act, 1996 in railway contracts - Allocation of Head. |
08.11.2012 |
|
2011/CE-I(Spl)/CT/O/4 |
Empowerment to Field Organisations (Works Contract matters) - Power for awarding Single Tender in projects targeted for 2012-13. |
11.10.2012 |
|
No. 2007.CE-I.CT.18 Pt. 2 |
Addendum & Corrigendum Slip (ACS) No. 46 to Para 1264 of Indian Railways Code for Engineering Department (Third Reprint) 1999. |
05.10.2012 |
|
94/CE-1/CT/4 Pt.17 |
Two Packets System of Tendering - Finalization of Works Tenders. |
13.08.2012 |
|
85/W-I/CT/7 Pt.1 |
Price Variation for supply of steel by contractors in works contracts. |
18.07.2012 |
|
2012/CE-I/CT/0/16 |
Miantenance Contracts for projects of New Lines. Doubling etc. executed by Construction Organisations, RVNL etc. |
20.06.2012 |
|
2007/CE-I/CT/18/Pt.3 |
'Mobilisation Advance' in works contracts-Correction Slip to Engineering Code. |
23.05.2012 |
|
No. 2007.CE-I.CT.18 pt.XII |
Tenders – Procedure for submission of Performance guarantee.
|
07.05.2012 |
|
85/W-I/CT/7 Pt.1 |
Price Variation for supply of steel by contractors of Works Contracts. |
02.05.2012 |
|
2007/CE-I/CT/8 |
Guidelines for procurement of Steel Items in Railway Projects/Contracts. |
01.05.2012 |
|
2007/CE-I/CT/18/Pt.3 |
'Mobilisation Advance' in works contracts-Correction Slip to Engineering Code. |
12.04.2012 |
|
2012/CE-I/CT/0/5 |
Minimum Eligibility Criteria in Works Tenders. |
09.04.2012 |
|
2011
|
2002/CE-I/CT/37 |
Participation of Joint Venture Firms in Works Tender on Indian Railways. |
07.09.2011 |
|
2010/CEI(Spl)/CT/9 |
Arbitration Fee of retired Railway Officers/ Outsiders working as Arbitrators appointed by the Hon’ble High Court. |
18.08.2011 |
|
2011/CE.1(Spl.1)CT/0/10 |
Award of consultancy services and project / work to IITs etc. |
22.07.2011 |
|
2011/CE.I(Spl)/CT/o/4 |
Empowerment to Field Organisations (Works Contract matters) - Power for awarding Singly Tenderin projects targeted for 2011-12. |
27.06.2011 |
|
2010/CE-I(Spl.)/CT/41 |
Recovery of claims of Railways in regard to terminated contracts from running ’on-account bills’ : Amendment to Clause-52 of G.C.C. |
27.04.2011 |
|
2011-CEI(Spl)/CT/O/5 |
References for changes /amendments instructions |
09.02.11 |
|
2010-CEI(Spl)/SP/12/Policy(NR)
|
Approved Consultants for Railway sidings
|
09.02.11
|
|
2010
|
E(G) 2010 HO 1/20 |
Remuneration to Railway Officer acting as Arbitrator |
11.09.2010 |
|
2007-CE1-CT-18 Pt.12 |
Empowerment to field organisations (Works contract matters) |
31.12.2010 |
|
F(X)II-2010/PW/2 |
Delegation of Powers to General Managers-Revision of Annexure-II to Chapter V, Indian Railways Financial Code Vol.I |
11.10.2010 |
|
2007-CE1-CT-18 Pt.13
|
variation in works contracts where vitiation is involved.
|
04.10. 2010
|
|
E(G) 2010 HO 1/20 |
Remuneration to Railway Officers acting as Arbitrators. |
11.09.2010
|
|
2007-CE1-CT-18-Pt.13
|
Powers to dispense with calling of tenders (calling of quotations)
|
06.09.2010
|
|
2003-CE-I-CT-4 Pt.
|
Issues related to Performance guarantee in works contracts
|
10.08.2010
|
|
2007-CE1-CT-18 Pt.II
|
reduction of tender notice period for small value tenders.
|
30.07.2010
|
|
No.2010-CE1-CT-11
|
Certificate of completion of works- amendment to clause 48(1) of GCC
|
11.06.2010
|
|
2009-CE1-CT-40
|
Out of court settlement of arbitration awards related to contract mattes
|
23.04.2010
|
|
2009/CE-I/CT/50 |
Application for setting aside Arbitral Award. |
12.02.2010 |
|
W-362-O-A-3-Pt.VIII-W-3(G)
|
NER’s letter
|
29.01.2010
|
|
2007-CE1-CT-18 Pt.
|
modification of item 9(variations upto 110%) of 28.9.2007 letter
|
05.01.2010
|
|
2009
|
2002-CE-1-CT-37 JV Pt.
|
Participation of JV in Works Tenders
|
13.08.2009
|
|
2002-CE-1-CT-37 JV Pt.
|
Participation of Jt. Venture in Works Tenders-partial modification of Clause No.15.4
|
13-8-2009
|
|
2009-CE1-CT-14
|
Appointment of Retired Officers as Arbitrators-raise the maximum fee limit to Rs.75000--.
|
24-6-2009
|
|
2007-CE1-CT-18 Pt.
|
Mobilisation advance
|
01.04.2009
|
|
2007-CE1-CT-18 Pt.
|
Empowerment of Field Organisations (Work Contract matters)
|
1-4-2009
|
|
2008-CE1-CT-21
|
Lengthy Tender Notices
|
5-3-2009
|
|
2007-CE1-CT-18 Pt.
|
powers to dispense with calling of quotations
|
05.03.2009
|
|
2008-CE1-CT-21
|
Lengthy Tender Notices
|
05.03.2009
|
|
2007-CE1-CT-18 Pt.
|
Powers to dispense with calling tenders (calling of quotations)
|
5-3-2009
|
|
2008-CE1-IRICEN-Maint-13
|
Maintenance of IRICEN
|
18.02.2009
|
|
2008-CE1-IRICEN-Maint-13
|
Taking over of maintenance of IRICEN assets by Central Railway from IRICEN.
|
18-2-2009
|
|
2008
|
2008-CE1-CT-Con-7(PCE-GM)
|
Works Contract Procedure amendment
|
15.12.08
|
|
2008-CE1-CT-Con-7(PCE-GM)
|
Works Contract Procedures ? amendment thereof
|
15.12.2008
|
|
2008-CE1-CT-1
|
Form of declaration to be signed by the tenderer
|
12.09.08
|
|
2008-CE1-CT-1
|
Form of declaration to be signed by the tenderer before tender negotiation meeting.
|
12-9-2008
|
|
2007-CE1-CT-18 Pt.I
|
Refund of Earnest Money Deposit (EMD) to unsuccessful tenderers ? streamlining of procedure ? reg.
|
10.09.08
|
|
2007-CE1-CT-18 Pt
|
definition of small value contracts
|
10.09.08
|
|
2007-CE1-CT-18 Pt.
|
Definition of small value contracts
|
10-9-2008
|
|
2007-CE1-CT-18 Pt.I
|
Refund of Earnest Money Deposit (EMD) to unsuccessful tenderers ? streamlining of procedure ? reg.
|
10-9-2008
|
|
2002-CE1-CT-37
|
Participation of JV in works tenders
|
02.09.08
|
|
2002-CE-1-CT-37
|
Participation of Jt. Venture in Works Tenders
|
2-9-2008
|
|
2007-CE1-CT-18
|
Correction slip for Mobilsation Advance
|
16.07.08
|
|
2007-CE1-CT-18
|
Correction Slip to Para No.1264 of Indian Railway Code for Engg. Deptt. (3rd reprint)1999.
|
16-7-2008
|
|
2008-CE1-CT-6
|
Construction workers welfare cess
|
09.07.08
|
|
2008-CE1-CT-6
|
Implementation of ? The Building and other Construction Workers (RECS) Act 1966 & the Building & Other Construction Workers Welfare Cess Act, 1996 in Railway contracts.
|
9-7-2008
|
|
2008-CE1-CT-11
|
Transparency in works contracts awarded on nomination basis.
|
25.06.2008
|
|
2008-CE1-CT-11
|
Transparency in works contracts awarded on nomination basis.
|
25.6.2008
|
|
85-W1-CT-7-Pt.I
|
Price variation for supply of steel
|
09.05.08
|
|
85-W-1-CT-7-Pt.I
|
Price variation for supply of steel by contractors in works contracts.
|
9-5-2008
|
|
2007-CE1-CT-8
|
Procurement of steel
|
07.05.08
|
|
2007-CE1-CT-8
|
Guidelines for procurement of Steel items
|
7-5-2008
|
|
2003-CE1-CT-4 Pt.I
|
Amendment to GCC- payment of SD
|
04.04.08
|
|
2003-CE1-CT-4 Pt.I
|
Amendment to General Conditions of Contract ? Works contracts.
|
4-4-2008
|
|
2007-CE1-CT-13
|
Power of Acceptance of Work Tenders
|
20-3-2008
|
|
2007-CE1-CT-18
|
Empowerment of field organisations
|
07.03.08
|
|
2007-Ce1-CT-18
|
Empowerment of Field Organisations (Works Contract matters)
|
7-3-2008
|
|
2003-CE1-CT-4 Pt.I
|
Regarding acceptance of EMD
|
23.01.08
|
|
2003-CE1-CT-4 Pt.I
|
Amendment to General Conditions of Contract (Works contracts)
|
23-1-2008
|
|
2007
|
2007/CE-I/CT/13 |
Power of Acceptance of Works Tenders. |
03.09.2007 |
|
2007-CE1-CT-18
|
Performance Guarantee ? forms of submission
|
10-12-2007
|
|
2007-CE1-CT-18
|
PG forms of submission
|
10.12.07
|
|
2007-CE1-CT-2
|
Irregularities in contract agreements
|
10.12.2007
|
|
2003-CE1-CT-4-Pt.I
|
Procedure for risk and cost tenders
|
23.11.07
|
|
2003-CE1-CT-4-Pt.I
|
Procedure for finalizing Risk and Cost Tenders
|
23-11-2007
|
|
2007-CE1-CT-13
|
Power of Acceptance of Works Tenders
|
15-10-2007
|
|
2007-CE-1-CT-13
|
Powers of acceptance of work tenders
|
15.10.2007
|
|
2007- CE1-CT-18
|
Sudhir Chandra Committee
|
28.09.2007
|
|
2007-CE-I-CT-1
|
Enhancement of tendeer value- delegation of powers of NS Items
|
31-8-2007
|
|
94-CE-I-CT-53
|
CS No 41 Cost of Tender Documents
|
18.05.2007
|
|
2006
|
94-CE1-CT-4
|
Clarification regarding minimum technical eligibility criterion in Works Tenders
|
23.11.06
|
|
2002-CE-1-CT-37
|
Inclusion of Joint Venture-Partnership firms in tender conditions and NIT
|
02.08.2006
|
|
2003- CE1-CT-4 Pt.I
|
Gadkari Comnmittee- amendment to GCC
|
12-16.5.2006
|
|
No. 2003/CE-I/CT/4/PT.I
|
Amendment to General Conditions of Contract (works contracts)
|
12-05-2006
|
|
No.85/WI/CT/7.Pt.I.
|
General Conditions of Contract-Price Variation Clause (PVC)- Amendment thereto
|
18/19-4-2006
|
|
2004
|
96-CE.I-SP-12 (Pt.)
|
Empanellment of the approved consultants for Siding Works
|
20 .7.2004
|
|
RB/CE-I/10/2004
|
Appointment of the Arbitrator from zonal Railways directly by PSUs.
|
13-07-2004
|
|
RB/CE-I/8/2004
|
Reg: Appointment of works contractors (Finalisation of Tenders) Corrections to Annexure-I of Board?s letter of even number Dated 11.6.2003.
|
07-07-2004
|
|
RB/CE-I/9/2004
|
Report of the Committee on issue of Earnest Money and Security Deposit from Public Sector Undertakings (PSUs)
|
07-07-2004
|
|
RB/CE-I/6/2004
|
Report of the Committee on issue of Earnest Money and Security Deposit from Public Sector Undertakings (PSUs)
|
17-05-2004
|
|
E(G)2004 HO1-2
|
remuneration to serving officers acting as arbitrators -
|
24.02.2004
|
|
RB-35/2004
|
Remuneration to Railway Officers acting as arbitrator (RBE No 35/04)
|
24-02-2004
|
|
95-CE1-CT-24
|
Guidelines for appointment of retired railway officers as arbitrators-with Annexures
|
12/1/2004
|
|
95-CE1-CT-24
|
Guidelines for appointment of retired railway officers as arbitrators-with Annexures
|
12-1-2004
|
|
RB/CE-I/1/2004
|
Appointment of Retired Railway Officers as Arbitrators. (RB/CE.I/1/2004)
|
12-01-2004
|
Hindi Version
|
2003
|
RB/CE/18/2003
|
Disposal of Arbitration Cases./ (Hindi version in PDF) (RB/CE/18/2003)
|
31-12-2003
|
Hindi Version
|
94/CE-I/CT/4(Pt.II) |
Role of Tender Committee (T.C.) in finalizing the Works Tenders/Contracts. |
19.11.2003 |
|
RB/CE/10/2003
|
Issue of Instructions in regard to drawing up of self-contained and self explanatory TC Minutes/(Hindi version in PDF) (RB/CE/10/2003)
|
15-10-2003
|
Hindi version
|
RB/CE/6/2003
|
Appointment of Works Contractors - Finalisation of Tenders.(RB/CE/6/2003)
|
11-06-2003
|
|
RB/CE/5/2003
|
Appointment of Works Contractors - Finalisation of Tenders.(RB/CE/5/2003)
|
04-06-2003
|
|
RB/CE/3/2003
|
Irregularities in execution of Annual Zonal Contracts.(ESO17) .(RB/CE/3/2003)
|
21-05-2003
|
|
RB/CE/2/2003
|
Submission of Income Tax Clearance Certificate(ITCC) by Contractors/Tenderers.(ESO16) .(RB/CE/2/2003)
|
06-05-2003
|
|
2002
|
94- CE1-CT-4
|
Sudhir Chandra Committee
|
17.10.2002
|
|
No.94/CEI/CT/4
|
Report of the committee on appointment of Works Contractors- Finalization of tenders.
|
17-10-2002.
|
|
2001
|
99/CE-I/CT/28 |
General Condition of Contract – Termination of Contract under Clause 62 and procedure for revival. |
24.5.2001 |
|
94- CE1-CT-4
|
Sudhir Chandra Committee
|
22.10.2001
|
|
1997
|
94- CE1-CT-4
|
Bahmani Procedure for inviting tenders
|
17.9.1997
|
|
96- CE1-CT-29
|
Arbitration & reconciliation
|
6.8.1997
|
|
1996
|
95-CE1-CT-24
|
Appointment of Retired Officers as Arbitrators-Guidelines and Other conditions
|
14-11-1996
|
|
85-W-1-CT-7- Vol.I
|
Price variation clause Amendment thereto
|
04.04.96
|
|
1995
|
No. 90/CE-I/CT/27 |
Two packet system of tenders.
|
17.08.95 |
|
94-CE-1-CT-37
|
Enhancement of original contract value
|
24. 8.95
|
|
94- CE1-CT-37
|
Enhancement of original value
|
05.05.1995
|
|
1987
|
85-W-1-CT-7
|
Price variation clause amendment thereto
|
20.1.1987
|
|
1980
|
80-W-1-CT-10
|
Price variation clause
|
25.04.80
|
|