Letter No.
|
Date
|
Subject
|
2010
|
2000/Safety(A&R)19/39 Pt.
|
27.12.2010
|
Policy on Interlocking of level crossing gates and Comprehensive guidelines on provision of Safety Devices at Level Crossing Gates.
|
|
|
|
98/Safety(A&R)/19/16
|
14.12.2010
|
Train Operation during Fog � Precautions � Clarification (VTO).
|
2009/Safety(A&R)/19/24
|
06.12.2010
|
Publication of Gazette Notification amending Indian Railways (Open Lines) General Rules � 1976 Amendment/Deletion/Addition/ Substitution to General Rules 3.07 (Description of Distant Signals and their Indications), 9.02 (Duties of Loco pilot and Guard when an Automatic stop signal on double line is to be passed at �on�), 9.07 (Duties of Loco Pilot and Guard when an Automatic stop signal on single line is to be passed at �on�).
|
2000/Safety(A&R)/19/39 Pt.
|
03.12.2010
|
Equipments to be maintained at Traffic LC gates.
|
2005/Safety(A&R)/6/4
|
02.12.2010
|
Finalization of enquiries where the responsibility is fixed on staff of Foreign Railway.
|
2009/Safety & Signal/26/2
|
26.11.2010
|
Generation of exception report regarding reversal of points.
|
2010/Safety(A&R)/19/24
|
24.11.2010
|
Communication by Guards after traversing permanent Speed restriction.
|
2000/Safety(A&R)/19/39
|
22.11.2010
|
Working Instructions for manned Level Crossing Gates.
|
2010/Safety(A&R)/19/19
|
19.11.2010
|
Provision of Approach Locking Arrangement at Interlocked Level Crossing Gates in Block Section.
|
2004/Safety(A&R)/19/16
|
16.11.2010
|
Review of Station working Rules.
|
2010/Safety(A&R)/14/2
|
16.11.2010
|
Minutes of Chief Operations managers; Conference on Safety held on 26th October, 2010
|
98/Safety(A&R)/19/16
|
04.11.2010
|
Train Operation during Fog � Precautions.
|
98/Safety(A&R)/19/16
|
04.11.2010
|
Train Operation during Fog � Precautions.
|
2010/Safety(A&R)/19/10
|
19.10.2010
|
Simultaneous reception and dispatch facilities � Withholding of permission by CRS/Western Circle as prescribed under GR 3.40.
|
2000/Safety(A&R)/19/39Pt.
|
19.10.2010
|
Manning of Unmanned Level Crossing Gate within station limits.
|
2010/Safety(A&R)/19/20
|
18.10.2010
|
Rules for Working of Trains in Modified Automatic Block Singalling � Corrigendum thereto.
|
2010/Safety(A&R)/19/8
|
01.10.2010
|
Modification to engine whistle code while approaching and passing through a level crossing � SR to GR 4.50.
|
2010/Safety(A&R)/3/19
|
01.10.2010
|
Ordering of limited no. of ARTs/ARMEs/Cranes as per actual requirement to tackle train accidents.
|
2010/Safety(A&R)/19/10
|
01.10.2010
|
Provision for isolation at stations.
|
2010/Safety(A&RA)/26/12 (Trg.IRTS)
|
29.09.2010
|
Modification in Training of IRTS Probationers.
|
2009/Safety(A&R)/19/17
|
29.09.2010
|
Draft Accident Manual of Dedicated Freight Corridor Corporation of Indian Limited (DFCCIL) � sharing of resources of ART/ARME/Cranes of IR with DFCCIL during train accidents, etc.
|
2010/Safety(A&R)/3/19
|
29.09.2010
|
Mobility at accident sites � Congestion from ARTs/ARMES/Cranes.
|
2010/Safety(A&R)/3/19
|
29.09.2010
|
Mobility at accident sites � Congestion from ARTs/ARMES/Cranes.
|
|
|
|
2010/Safety(A&R)/3/15
|
28.09.2010
|
Restoration of Traffic after Track/OHE Fit subsequent to Train Accident � Provisions in Accident Manual
|
2000/Safety(A&R)/19/20
|
28.09.2010
|
Definition and Re-classification of Accidents on Indian Railways � Amendment thereto.
|
2010/Safety(A&R)/1/12
|
28.09.2010
|
Dashing of Train No. 8478 Up Utkal Express with a truck at manned LC gate between Malatipatpur (MLT) and Puri (PUI) stations of Khurda Road Division on 13.05.2010.
|
|
|
|
2010/Safety(A&R)/19/20
|
27.09.2010
|
Rules for Working of Trains in Modified Automatic Block Singnalling-Corrigendum thereto.
|
|
|
|
2009/Safety(A&R)/3/2
|
24.09.2010
|
Communication at Level Crossing Gates.
|
2000/Safety(A&R)/19/39/Pt.
|
24.09.2010
|
Working Instructions for Manned level Crossing Gates.
|
|
|
|
2010/Safety(A&R)/19/20
|
20.09.2010
|
Rules for Working of Trains in Modified Automatic Block Singnalling.
|
|
|
|
2010/Safety(A&R)/3/9
|
16.09.2010
|
Vulnerability of Level Crossings � Sanctioning of Road under Bridges (Normal/Limited Height Subways)
|
|
|
|
2010/Safety(A&R)/3/19
|
08.09.2010
|
Delay in ordering and departure of ARTs/ARMEs/Cranes after train accidents.
|
|
|
|
2010/Safety(A&R)3/9
|
26.08.2010
|
Sanction of normal/Limited Height Subways.
|
98/Safety(A&R)19/16
|
25.08.2010
|
Train Operation during Fog � Precautions.
|
2009/Safety(A&R)/19/29
|
24.08.2010
|
Exclusive frequency for use of walkie-talkie/VHF sets by the ASMS and Drivers/Guards etc.
|
98/Safety(A&R)/19/16
|
23.08.2010
|
Train Operation during Fog � Precautions.
|
2010/Safety(A&R)/26/11
|
19.08.2010
|
Status of working of Anti Collision Device (ACD) on Konkan Railway.
|
2010/Safety(A&R)/3/16
|
18.08.2010
|
Train Accidents on Account of Failure of Railway Staff.
|
2010/Safety(A&R)/19/18
|
18.08.2010
|
Power to Zonal Railways to amend Unified Subsidiary Rules/Subsidiary Rules.
|
1998/Safety(A&R)/19/16/Loose
|
17.08.2010
|
Fog Vision Instrumentation project under TMRS.
|
2000/Safety(A&R)/19/20
|
16.08.2010
|
Definition and Reclassification of Accidents on Indian Railways Amendment thereto.
|
2010/Safety(A&R)/2/3
|
16.08.2010
|
Update position of punishment awarded in accidents Occurred during 2007-08&2008-09.
|
2009/Safety(A&R)/26/1
|
13.08.2010
|
Provision of GPS based fog safe devices on Electric Locos/EMUs/MEMUs.
|
2010/Safety(A&R)/26/1
|
12.08.2010
|
Use of FOGSAFE device during foggy weather.
|
2009/Safety(A&R)/26/4
|
11.08.2010
|
Blanking of Signals � Back up Power Supply.
|
2010/Safety(A&R)/3/15
|
09.08.2010
|
Delay in Restoration of Traffic after Track/OHE fit subsequent to Train Accident.
|
98/Safety(A&R)/19/16
|
04.08.2010
|
Suspension of Intermediate Block Signal during Foggy weather.
|
2003/Safety(DM)/6/3
|
02.08.2010
|
Coordination with NDRF Battalions.
|
2009/Safety & Signal/26/2
|
30.07.2010
|
Data loggers for Signalling � Timely extraction of report.
|
2005/Safety(A&R)/3/15
|
27.07.2010
|
Report of Accident Inquiry � Request under RTI Act- 2005
|
2003/Safety(DM)/6/3
|
27.07.2010
|
Mock Drills on Disaster Management.
|
2003/Safety(A&R)/1/12
|
22.07.2010
|
Statutory Investigation and Inquiries into Railway Accidents.
|
2010/Safety(A&R)/19/16 Pt
|
19.07.2010
|
Provision of Double Distant Signal to enhance Safety in Train Operations during foggy weather.
|
2003/Safety(A&R)/1/12
|
19.07.2010
|
Statutory Investigation and Inquiries into Railway Accidents.
|
2010/ Safety(A&R)/19/13
|
16.07.2010
|
Crossing of Trains at stations provided with one platform line.
|
95/ Safety-I/23/7
|
12.07.2010
|
Working of Twin Single Line.
|
98/Safety(A&R)/3/3
|
21.06.2010
|
Reporting of Train Accidents and unusual occurrence.
|
2010/Safety(A&R)/19/7
|
21.06.2010
|
BPAC Failures Analysis, Failures on movement of RDSO, TRC.
|
2010/Safety(A&R)/19/10
|
01.06.2010
|
Simultaneous reception and dispatch facilities � Approved Special Instructions prescribed under GR 3.40.
|
2010/Safety(A&R)/19/10
|
01.06.2010
|
Simultaneous reception and dispatch facilities � withholding of permission by CRS/Western Circle as required under GR 3.40.
|
2000/Safety(A&R)/19/39 Pt
|
01.06.2010
|
Manning of unmanned level crossing gates within station limits.
|
95/Safety-1/23/7
|
26.05.2010
|
Working of Twin Single Line.
|
2000/Safety(A&R)/19/39 Pt-I
|
19.05.2010
|
Change of Normal Position of Manned Non-interlocked (Engineering & Traffic) Gates from �Closed to road traffic� to �Open to road traffic.
|
2000/Safety(A&R)/19/39 Pt-I
|
18.05.2010
|
Working Instructions for Manned Non-Interlocked Level Crossing Gates Normally Closed to Road Traffic.
|
98/Safety(A&R)/19/16
|
18.05.2010
|
Train operation during Fog-Dislocation in train operations and review of Safety instruction.
|
2008/Safety(A&R)/19/5
|
14.05.2010
|
Shunting during Reception of Trains � under GR 5.16.
|
2008/Safety (A&R)/19/5
|
14.05.2010
|
Shunting during Reception of Trains � under GR 5.16.
|
2010/Safety(A&R)/19/8
|
14.05.2010
|
Modification to engine whistle code while approaching and passing through a level crossing � SR to GR 4.50
|
2010/Safety(A&R)/19/7
|
13.05.2010
|
BPAC failures on account of movement of RDSO�s Track Recording Car.
|
|
|
|
2010/Safety(A&R)/3/7
|
12.05.2010
|
Elimination of Unmanned Level Crossing Gates.
|
2010/Safety(A&R) /3/7
|
12.05.2010
|
1. Unmanned Level Crossing on New Lines and Gauge Conversion Works.
2. Constructions of RUBs under MPLADS fund.
|
2009/ Safety&Signal/26/2/ Part file
|
07.05.2010
|
Provisions of Auto TOL feature in Block release circuit to reduce Block failures in SGE Block Instrument.
|
2008/Safety(A&R)/19/12
|
05.05.2010
|
Development of �Level Crossing Gate Control Equipment using wire/wireless data communication� � Result of Field Trials.
|
2009/Safety(A&R)/19/29
|
22.04.2010
|
Use of Walkie-Talkie Sets.
|
2009/Safety(A&R)/19/29
|
10.03.2010
|
Rear-end collision of 2964 Dn Mewar Express between Mathura Jn. and Vrindavan Road Station with 2779 Dn Goa Express on 21.10.2009 on Mathura-Pulwal Section of Agra Division of North Central Railway.
|
2009/Safety(A&R)/19/29
|
02.03.2010
|
Exclusive Frequency for use of Walkie-Talkie/VHF sets by the ASMs and Drivers/Guard etc.
|
2009/ Safety&Signal/26/2
|
19.02.2010
|
Provision of TOLR relay in Block Release Circuit to reduce Block Failures.
|
2009/Safety(A&R)/19/11
|
17.02.2010
|
Rear-end collision between 2556 Gorakhdham Express and 2418 Prayagraj Express between Bhaupur and Panki station on Tundla-Kanpur section of Allahabad Division of North Central Railway on 02.01.2010.
|
2009/Safety(A&R)/26/4
|
17.02.2010
|
Conflicting signals or bobbing of signals.
|
2000/Safety(A&R)/19/39
|
17.02.2010
|
Manned Traffic Level Crossing Gates (Interlocked) � Failure of Gate Barrier (Boom).
|
2009/Safety(A&R)/26/4
|
11.02.2010
|
Conflicting signals or bobbing of signals.
|
2009/Safety(A&R)/19/30
|
10.02.2010
|
Maintenance of Signalling Gear in Mid-Sections.
|
|
|
|
98/Safety(A&R)/19/16
|
02.02.2010
|
Train operation during Fog in Automatic Signalling Sections.
|
2001/Safety(A&R)/19/2
|
28.01.2010
|
Replacement of fuse signal with LED based flashing hand signal lamps.
|
98/Safety(A&R)/19/16
|
21.01.2010
|
Precautions for the Safety of Passengers in Rear SLR during fog.
|
2009/ Safety&Signal/26/2
|
21.01.2010
|
Testing of Wiring Diagrams and Interlocking circuits.
|
2009/ Safety&Signal/26/2
|
20.01.2010
|
Installation of Block Proving by Axle Counter � Policy.
|
98/Safety(A&R)/19/16
|
20.01.2010
|
Provision of Double Distant Signal to enhance safety in Train operation.
|
98/Safety(A&R)/19/16
|
19.01.2010
|
Train operation during Fog.
|
98/Safety(A&R)/19/16
|
18.01.2010
|
Train operation during Fog.
|
2009/Safety(A&R)/19/30
|
18.01.2010
|
Disconnection for attending failure at relay huts in Automatic Signalling Territory.
|
98/Safety(A&R)/19/16
|
16.01.2010
|
Precautions for the Safety of Passengers in Rear SLR during fog.
|
98/Safety(A&R)/19/16
|
14.01.2010
|
Train operation during Fog in Automatic Signalling Sections.
|
2000/Safety(A&R)/19/30
|
13.01.2010
|
Disconnection for attending failure at relay huts in Automatic Signalling Territory.
|
2000/Safety(A&R)/19/39 Pt
|
07.01.2010
|
Exchange of Private Number between SM and gateman of interlocked level crossing gate in block section.
|
2009/ Safety&Signal/26/2
|
05.01.2010
|
BPAC Failures.
|
98/Safety(A&R)/19/16
|
04.01.2010
|
Train operation during Fog.
|
2009/ Safety&Signal/26/2
|
04.01.2010
|
BPAC Failures.
|
98/Safety(A&R)/19/16
|
02.01.2010
|
Train operation during Fog.
|
2009
|
2000/Safety(A&R)/19/39/ Pt.
|
15.12.09
|
Review of working instructions for Manned Level Crossing Gates.
|
99/Safety(A&R)/6/1
|
15.12.09
|
Imposing penalty of removal from service or compulsory retirement for ESMs/ASMs
|
2001/Safety(A&R)/19/2
|
14.12.09
|
Amendment to GR 3.66, 3.67, 3.78 & 4.16.
|
2009/Safety(A&R)/19/29
|
08.12.09
|
Use of Walkie-Talkie Sets.
|
98/Safety(A&R)/19/16
|
07.12.09
|
Precautions for train operation during fog.
|
2008/Safety(A&R)/19/13/ Pt. I
|
01.01.09
|
Normal Aspect of Level Crossing Gates and Manning of Unmanned Level Crossing etc.
|
2009/Safety(A&R)/26/3
|
26.11.09
|
Improved visibility of color light signals during fog.
|
2000/Safety/Signal/26/2
|
10.11.09
|
(i) Track Circuiting on �E� routes.
(ii) Poor progress of Track Circuiting.
|
2009/Safety/Signal/26/2
|
05.11.09
|
Installation of Block Proving by Axle Counter � Policy.
|
2009/Safety(A&R)/19/21
|
28.10.09
|
Provision for means of isolation in sidings on gradients.
|
2000/Safety(A&R)/19/20
|
15.10.09
|
Reporting of potentially Hazardous Occurrences to Railway Board
|
2007/Safety(A&R)/3/2
|
14.10.09
|
�Blanking off� of Signals � Backup Power Supply. Signal aspect back to original status after �Blanking off�.
|
2009/Safety(A&R)/19/20
|
08.10.09
|
Shunting facility � operational flexibility.
|
99/Safety(A&R)/6/1
|
06.10.09
|
Awarding minimum penalty for the staff held responsible in accident cases � review thereof.
|
2000/Safety(A&R)/19/39Pt
|
01.10.09
|
Working Instructions for manned Level Crossing gates non-interlocked, provided with Telephone with normal position open to road traffic.
|
2007/Safety(A&R)/3/2
|
25.09.09
|
(1)Blanking off� of Signals � Backup Power Supply. (2)Signal aspect back to original status after �Blanking off�.
|
2009/Safety(A&R)1/25
|
10.09.09
|
Stabling of load without live Engine on main line at station on gradients.
|
2005/Safety(A&R)/19/23
|
10.09.09
|
Working of Ladder Trolleys
|
2007/Safety(A&R)/3/2
|
08.09.09
|
Blanking off of Signals � back up Power Supply.
|
2002/Safety(A&R)/19/29
|
21.08.09
|
Authority for preparation of Accident Manual and Disaster Management Plan.
|
2009/Safety(A&R)/19/15
|
06.08.09
|
Exchange of all right signals between train crew and station staff on Multiple Line Station.
|
2000/Safety(A&R)/19/35
|
28.07.09
|
Freight Train Examination � GDR Check.
|
2001/Safety(A&R)/19/2
|
20.07.09
|
Knowledge and possession of flare signals � Substitution/Deletion/Addition/Amendment to General Rules 3.65, 3.66, 3.67, 3.78 and 4.16 � Advance Correction Slip No.2.
|
2006/Safety(A&R)/19/8
|
23.06.09
|
Prohibition of use of mobile phones while on train run by Loco pilots/Guards.
|
2009/Safety(A&R)/19/3
|
18.06.09
|
Interlocking of Anemometers with Signals
|
2009/Safety(A&R)/3/2
|
04.06.09
|
Thrust on Safety at Level Crossings � Comprehensive Instructions
|
2009/Safety(A&R)/3/2
|
02.06.09
|
Thrust on Safety at Level Crossings � Comprehensive Instructions
|
2008/Safety(A&R)/18/13
|
06.05.09
|
Stabling of loads on Mine Line with Live engine
|
2008/Safety(A&R)/14/4(S&T)
|
09.04.09
|
Expending works of Block Proving by Axle Counter.
|
2000/Safety(A&R)/19/20
|
30.03.09
|
Reporting of potentially hazardous occurrences to Railway Board.
|
2006/Safety(A&R)/19/8
|
25.03.09
|
Supply of CUG SIM Cards to running staff � implementation of Board�s decision with the NFIR/PNM 52/2005 and 34/2006.
|
2008/Safety(A&R)/19/10
|
24.03.09
|
Provision of Intermediate Block Signal on gradients.
|
2008/Safety(A&R)/19/12
|
12.03.09
|
Development of �Level Crossing Gate Control Equipment using wire/wireless data communication��Workin Instructions thereof.
|
2001/Safety(A&R)/19/2
|
29.01.09
|
Illuminating signals � Replacement of fusees with electronic flashing hand signal lamps
|
2001/Safety(A&R)/19/2
|
16.01.09
|
Illuminating signals � Replacement of fusees with electronic flashing hand signal lamps
|
2007/Safety(A&R)/19/6
|
09.01.09
|
General Rules 5.20 � Steep gradients 1 in 200 instead of 1 in 260, clarification therefore.
|
|
-
|
Train operation under any abnormal condition in the track
2007/Safety(A&R)/19/13 dated 17.12.07
|
|
-
|
Failure of Block Instruments and Introduction of Paper line Clear Ticket
|
2005/Safety(A&R)/19/16
|
dated 12.10.07
|
|
2005/Safety(A&R)/19/16
|
dated 30.03.06
|
|
2005/Safety(A&R)/19/16
|
dated 29.03.06
|
|
|
-
|
Personal Mobile Telephones of Drivers and Guards.
|
|
-
|
Definition and Reclassification of Accidents on Indian Railways - Amendments thereto.
|
|
|
Proforma for reporting of Train Accidents
|
|
-
|
Definition and Re-classification of Accidents on IR
|
|
-
|
Departmental Accidental Inquiries
|
2005/Safety(A&R)/6/4
|
dated 24.02.06
|
|
2005/Safety(A&R)/6/3
|
dated 8.05.06
|
|
2005/Safety(A&R)/6/3
|
dated 3/01/06
|
|
2005/Safety(A&R)/6/3
|
dated 02.06
|
|
2005/Safety(A&R)/6/4
|
dated 02.02.06
|
|
|
-
|
Replacement of illuminating flare signals (fuses) with electronic flashing hand signal lamps.
No.2001/Safety (A&R)/19/2 .07.2006
|
|
-
|
PUNISHMENTS NORMS
|
|
-
|
Manned Level Crossing Instructionsss
|