Letter No. |
Date |
Subject |
2010 |
2000/Safety(A&R)19/39 Pt. |
27.12.2010 |
Policy on Interlocking
of level crossing gates and Comprehensive
guidelines on provision of Safety Devices at
Level Crossing Gates. |
|
|
|
98/Safety(A&R)/19/16 |
14.12.2010 |
Train Operation during
Fog – Precautions – Clarification (VTO). |
2009/Safety(A&R)/19/24 |
06.12.2010 |
Publication of Gazette
Notification amending Indian Railways (Open
Lines) General Rules – 1976
Amendment/Deletion/Addition/ Substitution to
General Rules 3.07 (Description of Distant
Signals and their Indications), 9.02 (Duties
of Loco pilot and Guard when an Automatic
stop signal on double line is to be passed
at ‘on’), 9.07 (Duties of Loco Pilot and
Guard when an Automatic stop signal on
single line is to be passed at ‘on’). |
2000/Safety(A&R)/19/39 Pt. |
03.12.2010 |
Equipments to be
maintained at Traffic LC gates. |
2005/Safety(A&R)/6/4 |
02.12.2010 |
Finalization of
enquiries where the responsibility is fixed
on staff of Foreign Railway. |
2009/Safety & Signal/26/2 |
26.11.2010 |
Generation of exception
report regarding reversal of points. |
2010/Safety(A&R)/19/24 |
24.11.2010 |
Communication by Guards
after traversing permanent Speed
restriction. |
2000/Safety(A&R)/19/39 |
22.11.2010 |
Working Instructions
for manned Level Crossing Gates. |
2010/Safety(A&R)/19/19 |
19.11.2010 |
Provision of Approach
Locking Arrangement at Interlocked Level
Crossing Gates in Block Section. |
2004/Safety(A&R)/19/16 |
16.11.2010 |
Review of Station
working Rules. |
2010/Safety(A&R)/14/2 |
16.11.2010 |
Minutes of Chief
Operations managers; Conference on Safety
held on 26th October, 2010 |
98/Safety(A&R)/19/16 |
04.11.2010 |
Train Operation during
Fog – Precautions. |
98/Safety(A&R)/19/16 |
04.11.2010 |
Train Operation during
Fog – Precautions. |
2010/Safety(A&R)/19/10 |
19.10.2010 |
Simultaneous reception
and dispatch facilities – Withholding of
permission by CRS/Western Circle as
prescribed under GR 3.40. |
2000/Safety(A&R)/19/39Pt. |
19.10.2010 |
Manning of Unmanned
Level Crossing Gate within station limits. |
2010/Safety(A&R)/19/20 |
18.10.2010 |
Rules for Working of
Trains in Modified Automatic Block
Singalling – Corrigendum thereto. |
2010/Safety(A&R)/19/8 |
01.10.2010 |
Modification to engine
whistle code while approaching and passing
through a level crossing – SR to GR 4.50. |
2010/Safety(A&R)/3/19 |
01.10.2010 |
Ordering of limited no.
of ARTs/ARMEs/Cranes as per actual
requirement to tackle train accidents. |
2010/Safety(A&R)/19/10 |
01.10.2010 |
Provision for isolation
at stations. |
2010/Safety(A&RA)/26/12 (Trg.IRTS) |
29.09.2010 |
Modification in
Training of IRTS Probationers. |
2009/Safety(A&R)/19/17 |
29.09.2010 |
Draft Accident Manual
of Dedicated Freight Corridor Corporation of
Indian Limited (DFCCIL) – sharing of
resources of ART/ARME/Cranes of IR with
DFCCIL during train accidents, etc. |
2010/Safety(A&R)/3/19 |
29.09.2010 |
Mobility at accident
sites – Congestion from ARTs/ARMES/Cranes. |
2010/Safety(A&R)/3/19 |
29.09.2010 |
Mobility at accident
sites – Congestion from ARTs/ARMES/Cranes. |
|
|
|
2010/Safety(A&R)/3/15 |
28.09.2010 |
Restoration of Traffic
after Track/OHE Fit subsequent to Train
Accident – Provisions in Accident Manual |
2000/Safety(A&R)/19/20 |
28.09.2010 |
Definition and
Re-classification of Accidents on Indian
Railways – Amendment thereto. |
2010/Safety(A&R)/1/12 |
28.09.2010 |
Dashing of Train No.
8478 Up Utkal Express with a truck at manned
LC gate between Malatipatpur (MLT) and Puri
(PUI) stations of Khurda Road Division on
13.05.2010. |
|
|
|
2010/Safety(A&R)/19/20 |
27.09.2010 |
Rules for Working of
Trains in Modified Automatic Block
Singnalling-Corrigendum thereto. |
|
|
|
2009/Safety(A&R)/3/2 |
24.09.2010 |
Communication at Level
Crossing Gates. |
2000/Safety(A&R)/19/39/Pt. |
24.09.2010 |
Working Instructions
for Manned level Crossing Gates. |
|
|
|
2010/Safety(A&R)/19/20 |
20.09.2010 |
Rules for Working of
Trains in Modified Automatic Block
Singnalling. |
|
|
|
2010/Safety(A&R)/3/9 |
16.09.2010 |
Vulnerability of Level
Crossings – Sanctioning of Road under
Bridges (Normal/Limited Height Subways) |
|
|
|
2010/Safety(A&R)/3/19 |
08.09.2010 |
Delay in ordering and
departure of ARTs/ARMEs/Cranes after train
accidents. |
|
|
|
2010/Safety(A&R)3/9 |
26.08.2010 |
Sanction of
normal/Limited Height Subways. |
98/Safety(A&R)19/16 |
25.08.2010 |
Train Operation during
Fog – Precautions. |
2009/Safety(A&R)/19/29 |
24.08.2010 |
Exclusive frequency for
use of walkie-talkie/VHF sets by the ASMS
and Drivers/Guards etc. |
98/Safety(A&R)/19/16 |
23.08.2010 |
Train Operation during
Fog – Precautions. |
2010/Safety(A&R)/26/11 |
19.08.2010 |
Status of working of
Anti Collision Device (ACD) on Konkan
Railway. |
2010/Safety(A&R)/3/16 |
18.08.2010 |
Train Accidents on
Account of Failure of Railway Staff. |
2010/Safety(A&R)/19/18 |
18.08.2010 |
Power to Zonal Railways
to amend Unified Subsidiary Rules/Subsidiary
Rules. |
1998/Safety(A&R)/19/16/Loose |
17.08.2010 |
Fog Vision
Instrumentation project under TMRS. |
2000/Safety(A&R)/19/20 |
16.08.2010 |
Definition and
Reclassification of Accidents on Indian
Railways Amendment thereto. |
2010/Safety(A&R)/2/3 |
16.08.2010 |
Update position of
punishment awarded in accidents Occurred
during 2007-08&2008-09. |
2009/Safety(A&R)/26/1 |
13.08.2010 |
Provision of GPS based
fog safe devices on Electric Locos/EMUs/MEMUs. |
2010/Safety(A&R)/26/1 |
12.08.2010 |
Use of FOGSAFE device
during foggy weather. |
2009/Safety(A&R)/26/4 |
11.08.2010 |
Blanking of Signals –
Back up Power Supply. |
2010/Safety(A&R)/3/15 |
09.08.2010 |
Delay in Restoration of
Traffic after Track/OHE fit subsequent to
Train Accident. |
98/Safety(A&R)/19/16 |
04.08.2010 |
Suspension of
Intermediate Block Signal during Foggy
weather. |
2003/Safety(DM)/6/3 |
02.08.2010 |
Coordination with NDRF
Battalions. |
2009/Safety & Signal/26/2 |
30.07.2010 |
Data loggers for Signalling – Timely
extraction of report. |
2005/Safety(A&R)/3/15 |
27.07.2010 |
Report of Accident Inquiry – Request under
RTI Act- 2005 |
2003/Safety(DM)/6/3 |
27.07.2010 |
Mock Drills on Disaster Management. |
2003/Safety(A&R)/1/12 |
22.07.2010 |
Statutory Investigation and Inquiries into
Railway Accidents. |
2010/Safety(A&R)/19/16 Pt |
19.07.2010 |
Provision of Double Distant Signal to
enhance Safety in Train Operations during
foggy weather. |
2003/Safety(A&R)/1/12 |
19.07.2010 |
Statutory Investigation and Inquiries into
Railway Accidents. |
2010/ Safety(A&R)/19/13 |
16.07.2010 |
Crossing of Trains at stations provided with
one platform line. |
95/ Safety-I/23/7 |
12.07.2010 |
Working of Twin Single Line. |
98/Safety(A&R)/3/3 |
21.06.2010 |
Reporting of Train Accidents and unusual
occurrence. |
2010/Safety(A&R)/19/7 |
21.06.2010 |
BPAC Failures Analysis, Failures on movement
of RDSO, TRC. |
2010/Safety(A&R)/19/10 |
01.06.2010 |
Simultaneous reception and dispatch
facilities – Approved Special Instructions
prescribed under GR 3.40. |
2010/Safety(A&R)/19/10 |
01.06.2010 |
Simultaneous reception and dispatch
facilities – withholding of permission by
CRS/Western Circle as required under GR
3.40. |
2000/Safety(A&R)/19/39 Pt |
01.06.2010 |
Manning of unmanned level crossing gates
within station limits. |
95/Safety-1/23/7 |
26.05.2010 |
Working of Twin Single Line. |
2000/Safety(A&R)/19/39 Pt-I |
19.05.2010 |
Change of Normal Position of Manned
Non-interlocked (Engineering & Traffic)
Gates from ‘Closed to road traffic’ to ‘Open
to road traffic. |
2000/Safety(A&R)/19/39 Pt-I |
18.05.2010 |
Working Instructions for Manned
Non-Interlocked Level Crossing Gates
Normally Closed to Road Traffic. |
98/Safety(A&R)/19/16 |
18.05.2010 |
Train operation during Fog-Dislocation in
train operations and review of Safety
instruction. |
2008/Safety(A&R)/19/5 |
14.05.2010 |
Shunting during Reception of Trains – under
GR 5.16. |
2008/Safety (A&R)/19/5 |
14.05.2010 |
Shunting during Reception of Trains – under
GR 5.16. |
2010/Safety(A&R)/19/8 |
14.05.2010 |
Modification to engine whistle code while
approaching and passing through a level
crossing – SR to GR 4.50 |
2010/Safety(A&R)/19/7 |
13.05.2010 |
BPAC failures on account of movement of
RDSO’s Track Recording Car. |
|
|
|
2010/Safety(A&R)/3/7 |
12.05.2010 |
Elimination of Unmanned Level Crossing
Gates. |
2010/Safety(A&R) /3/7 |
12.05.2010 |
1. Unmanned Level Crossing on New Lines
and Gauge Conversion Works.
2. Constructions of RUBs under MPLADS fund. |
2009/ Safety&Signal/26/2/ Part file |
07.05.2010 |
Provisions of Auto TOL feature in Block
release circuit to reduce Block failures in
SGE Block Instrument. |
2008/Safety(A&R)/19/12 |
05.05.2010 |
Development of “Level Crossing Gate Control
Equipment using wire/wireless data
communication” – Result of Field Trials. |
2009/Safety(A&R)/19/29 |
22.04.2010 |
Use of Walkie-Talkie Sets. |
2009/Safety(A&R)/19/29 |
10.03.2010 |
Rear-end collision of 2964 Dn Mewar Express
between Mathura Jn. and Vrindavan Road
Station with 2779 Dn Goa Express on
21.10.2009 on Mathura-Pulwal Section of Agra
Division of North Central Railway. |
2009/Safety(A&R)/19/29 |
02.03.2010 |
Exclusive Frequency for use of Walkie-Talkie/VHF
sets by the ASMs and Drivers/Guard etc. |
2009/ Safety&Signal/26/2 |
19.02.2010 |
Provision of TOLR relay in Block Release
Circuit to reduce Block Failures. |
2009/Safety(A&R)/19/11 |
17.02.2010 |
Rear-end collision between 2556 Gorakhdham
Express and 2418 Prayagraj Express between
Bhaupur and Panki station on Tundla-Kanpur
section of Allahabad Division of North
Central Railway on 02.01.2010. |
2009/Safety(A&R)/26/4 |
17.02.2010 |
Conflicting signals or bobbing of signals. |
2000/Safety(A&R)/19/39 |
17.02.2010 |
Manned Traffic Level Crossing Gates
(Interlocked) – Failure of Gate Barrier
(Boom). |
2009/Safety(A&R)/26/4 |
11.02.2010 |
Conflicting signals or bobbing of signals. |
2009/Safety(A&R)/19/30 |
10.02.2010 |
Maintenance of Signalling Gear in
Mid-Sections. |
|
|
|
98/Safety(A&R)/19/16 |
02.02.2010 |
Train operation during Fog in Automatic
Signalling Sections. |
2001/Safety(A&R)/19/2 |
28.01.2010 |
Replacement of fuse signal with LED based
flashing hand signal lamps. |
98/Safety(A&R)/19/16 |
21.01.2010 |
Precautions for the Safety of Passengers in
Rear SLR during fog. |
2009/ Safety&Signal/26/2 |
21.01.2010 |
Testing of Wiring Diagrams and Interlocking
circuits. |
2009/ Safety&Signal/26/2 |
20.01.2010 |
Installation of Block Proving by Axle
Counter – Policy. |
98/Safety(A&R)/19/16 |
20.01.2010 |
Provision of Double Distant Signal to
enhance safety in Train operation. |
98/Safety(A&R)/19/16 |
19.01.2010 |
Train operation during Fog. |
98/Safety(A&R)/19/16 |
18.01.2010 |
Train operation during Fog. |
2009/Safety(A&R)/19/30 |
18.01.2010 |
Disconnection for attending failure at relay
huts in Automatic Signalling Territory. |
98/Safety(A&R)/19/16 |
16.01.2010 |
Precautions for the Safety of Passengers in
Rear SLR during fog. |
98/Safety(A&R)/19/16 |
14.01.2010 |
Train operation during Fog in Automatic
Signalling Sections. |
2000/Safety(A&R)/19/30 |
13.01.2010 |
Disconnection for attending failure at relay
huts in Automatic Signalling Territory. |
2000/Safety(A&R)/19/39 Pt |
07.01.2010 |
Exchange of Private Number between SM and
gateman of interlocked level crossing gate
in block section. |
2009/ Safety&Signal/26/2 |
05.01.2010 |
BPAC Failures. |
98/Safety(A&R)/19/16 |
04.01.2010 |
Train operation during Fog. |
2009/ Safety&Signal/26/2 |
04.01.2010 |
BPAC Failures. |
98/Safety(A&R)/19/16 |
02.01.2010 |
Train operation during Fog. |
2009 |
2000/Safety(A&R)/19/39/ Pt. |
15.12.09 |
Review of
working instructions for Manned Level
Crossing Gates. |
99/Safety(A&R)/6/1 |
15.12.09 |
Imposing
penalty of removal from service or
compulsory retirement for ESMs/ASMs |
2001/Safety(A&R)/19/2 |
14.12.09 |
Amendment to
GR 3.66, 3.67, 3.78 & 4.16. |
2009/Safety(A&R)/19/29 |
08.12.09 |
Use of
Walkie-Talkie Sets. |
98/Safety(A&R)/19/16 |
07.12.09 |
Precautions
for train operation during fog. |
2008/Safety(A&R)/19/13/ Pt. I |
01.01.09 |
Normal Aspect
of Level Crossing Gates and Manning of
Unmanned Level Crossing etc. |
2009/Safety(A&R)/26/3 |
26.11.09 |
Improved
visibility of color light signals during
fog. |
2000/Safety/Signal/26/2 |
10.11.09 |
(i) Track
Circuiting on “E” routes.
(ii) Poor
progress of Track Circuiting. |
2009/Safety/Signal/26/2 |
05.11.09 |
Installation
of Block Proving by Axle Counter – Policy. |
2009/Safety(A&R)/19/21 |
28.10.09 |
Provision for
means of isolation in sidings on gradients. |
2000/Safety(A&R)/19/20 |
15.10.09 |
Reporting of
potentially Hazardous Occurrences to Railway
Board |
2007/Safety(A&R)/3/2 |
14.10.09 |
“Blanking off”
of Signals – Backup Power Supply. Signal
aspect back to original status after
“Blanking off”. |
2009/Safety(A&R)/19/20 |
08.10.09 |
Shunting
facility – operational flexibility. |
99/Safety(A&R)/6/1 |
06.10.09 |
Awarding
minimum penalty for the staff held
responsible in accident cases – review
thereof. |
2000/Safety(A&R)/19/39Pt |
01.10.09 |
Working
Instructions for manned Level Crossing gates
non-interlocked, provided with Telephone
with normal position open to road traffic. |
2007/Safety(A&R)/3/2 |
25.09.09 |
(1)Blanking
off” of Signals – Backup Power Supply.
(2)Signal aspect back to original status
after “Blanking off”. |
2009/Safety(A&R)1/25 |
10.09.09 |
Stabling of
load without live Engine on main line at
station on gradients. |
2005/Safety(A&R)/19/23 |
10.09.09 |
Working of
Ladder Trolleys |
2007/Safety(A&R)/3/2 |
08.09.09 |
Blanking off
of Signals – back up Power Supply. |
2002/Safety(A&R)/19/29 |
21.08.09 |
Authority for
preparation of Accident Manual and Disaster
Management Plan. |
2009/Safety(A&R)/19/15 |
06.08.09 |
Exchange of
all right signals between train crew and
station staff on Multiple Line Station. |
2000/Safety(A&R)/19/35 |
28.07.09 |
Freight Train
Examination – GDR Check. |
2001/Safety(A&R)/19/2 |
20.07.09 |
Knowledge and
possession of flare signals –
Substitution/Deletion/Addition/Amendment to
General Rules 3.65, 3.66, 3.67, 3.78 and
4.16 – Advance Correction Slip No.2. |
2006/Safety(A&R)/19/8 |
23.06.09 |
Prohibition of
use of mobile phones while on train run by
Loco pilots/Guards. |
2009/Safety(A&R)/19/3 |
18.06.09 |
Interlocking
of Anemometers with Signals |
2009/Safety(A&R)/3/2 |
04.06.09 |
Thrust on
Safety at Level Crossings – Comprehensive
Instructions |
2009/Safety(A&R)/3/2 |
02.06.09 |
Thrust on
Safety at Level Crossings – Comprehensive
Instructions |
2008/Safety(A&R)/18/13 |
06.05.09 |
Stabling of
loads on Mine Line with Live engine |
2008/Safety(A&R)/14/4(S&T) |
09.04.09 |
Expending
works of Block Proving by Axle Counter. |
2000/Safety(A&R)/19/20 |
30.03.09 |
Reporting of
potentially hazardous occurrences to Railway
Board. |
2006/Safety(A&R)/19/8 |
25.03.09 |
Supply of CUG
SIM Cards to running staff – implementation
of Board’s decision with the NFIR/PNM
52/2005 and 34/2006. |
2008/Safety(A&R)/19/10 |
24.03.09 |
Provision of
Intermediate Block Signal on gradients. |
2008/Safety(A&R)/19/12 |
12.03.09 |
Development of
“Level Crossing Gate Control Equipment using
wire/wireless data communication”–Workin
Instructions thereof. |
2001/Safety(A&R)/19/2 |
29.01.09 |
Illuminating
signals – Replacement of fusees with
electronic flashing hand signal lamps |
2001/Safety(A&R)/19/2 |
16.01.09 |
Illuminating
signals – Replacement of fusees with
electronic flashing hand signal lamps |
2007/Safety(A&R)/19/6 |
09.01.09 |
General Rules
5.20 – Steep gradients 1 in 200 instead of 1
in 260, clarification therefore. |
|
- |
Train operation under any abnormal condition in
the track
2007/Safety(A&R)/19/13
dated 17.12.07 |
|
- |
Failure of Block Instruments and Introduction of
Paper line Clear Ticket
|
2005/Safety(A&R)/19/16 |
dated
12.10.07 |
|
2005/Safety(A&R)/19/16 |
dated 30.03.06 |
|
2005/Safety(A&R)/19/16 |
dated 29.03.06 |
|
|
- |
Personal Mobile Telephones of Drivers and
Guards. |
|
- |
Definition and Reclassification of Accidents on
Indian Railways - Amendments thereto. |
|
|
Proforma for reporting of
Train Accidents |
|
- |
Definition and Re-classification of Accidents on
IR
|
|
- |
Departmental
Accidental Inquiries
|
2005/Safety(A&R)/6/4 |
dated
24.02.06 |
|
2005/Safety(A&R)/6/3 |
dated 8.05.06
|
|
2005/Safety(A&R)/6/3 |
dated 3/01/06 |
|
2005/Safety(A&R)/6/3 |
dated 02.06 |
|
2005/Safety(A&R)/6/4 |
dated 02.02.06 |
|
|
- |
Replacement of illuminating flare signals
(fuses) with electronic flashing hand signal
lamps.
No.2001/Safety (A&R)/19/2
.07.2006 |
|
- |
PUNISHMENTS NORMS |
|
- |
Manned Level Crossing Instructionsss |