CHAPTER-XIX

DETAILED INSTRUCTIONS FOR INSTALLATION & MAINTENANCE OF ELECTRICAL SIGNALLING EQUIPMENT

. SECTION 'A' - GENERAL INSTRUCTIONS FOR PROPER USE OF TOOLS
19.1 to 19.3 General Instructions
19.4 Soldering Connections
19.5 Wire Termination
. SECTION 'B' - COLOUR LIGHT SIGNALS  INSTALLATION
19.6 Type
19.7 Visibility
19.8 Location
19.9 Mounting and Fixtures
19.10 Alignment
19.11 Focussing
19.12 Hoods and Back Screens
19.13 Cables
19.14 Gaskets and Sealing
19.15 Locking
. SECTION 'C - ELECTRIC SIGNAL MACHINES
19.16 Type
INSTALLATION      
19.17 to 19.18 Installation
19.19 Testing
19.20 Locking
. SECTION 'D' - ELECTRICALLY LIT SEMAPHORE SIGNALS
19.21 to 19.23 Installation
. SECTION 'E' - ELECTRIC SIGNAL REVERSERS       ......
19.24 Type
19.25 Fixing
19.26 Locking
19.27 Installation
. SECTION 'F' - ELECTRIC POINT MACHINES REQUIREMENTS
19.28 to 19.33 Installation
19.34 Initial adjustment of Point Machine
19.35 Adjustment of Driving Rod  
19.36 Adjustment of detector contacts
19.37 Adjustment of friction clutch
19.38 Obstruction Test
SECTION 'G' - ELECTRICAL DETECTOR    
19.39 to 19.46 Installation
19.47 Circuit Controller
SECTION 'H' - RELAYS REQUIREMENTS
19.48 Type        
19.49 Flasher
19.50 Storage
19.51 Protection
19.52. Transportation
. INSTALLATION   
19.53 to 19.58 Location     
19.59 Code Pin Configuration
19.60 Relay Clip
19.61 Relay Index Board
19.62 Cross protection and double cutting
19.63 Contact Chart
19.64 Sealing of Plug-in Relays
. SECTION 'I' - STATION MASTER'S SLIDE CONTROL FRAMES   
19.65 Type       
19.66 Fixing
19.67 Location
19.68 Mechanical Locking 
19.69 Locking or sealing
. SECTION 'J' - ELECTRIC KEY TRANSMITTER INSTALLATION 
19.70 Type  
19.71 Fixing
19.72 Location
19.73 Communication
19.74 Keys     
19.75 Sealing
. SECTION 'K' - ELECTRIC LEVER LOCK    
19.76 to 19.78 Installation
. SECTION 'L' - SIGNAL INDICATOR 
19.79 Location      
19.80 Protection
19.81 Audible Warning   
19.82 Wiring
19.83 Signal Arm & Light Repeater
19.84 Colour Light Signal Indicator
19.85 to 19.86 (Left blank intentionally)
. SECTION 'M' - FUSES
19.87 Fuses
. SECTION 'N' - EARTH CONNECTIONS   
19.88 to 19.91 Earth Connections 
19.92 Method of obtaining Earth
19.93 Earthing Leads      
19.94 to 19.101 Earth Electrode Siting
19.102 Earth Resistance  
19.103 Earth Electrodes
19.104 Watering   
19.105 Earth Connections 
. SECTION 'O' - PAINTING OF ELECTRICAL SIGNALUNG EQUIPMENT
19.106 Colour Scheme
19.107 Interval of Painting
. COLOUR LIGHT SIGNALS        
19.108 Cleanliness of Lenses
19.109 Replacement     
19.110 Maintenance checks
. ELECTRIC SIGNAL MACHINES
19.111 Cleanliness  
19.112 Lubrication
19.113 Contacts
19.114 Commutators and Brushes
19.115 Tests
. ELECTRICALLY LIT SEMAPHORE SIGNALS........
19.116 Maintenance
. ELECTRIC SIGNAL REVERSERS
19.117 Maintenance
19.118 Tests
. ELECTRIC POINT MACHINES
19.119 to 19.126 Maintenance
19.127 to 19.129 Tests
. ELECTRIC DETECTOR
19.130 to 19.133 Maintenance
19.134 Obstruction Test
19.135 Circuit Controller
. RELAYS
19.136 to 19.138 Maintenance
19.139 to 19.140 Periodical Inspection
19.141 Overhauling
. STATION MASTER'S SLIDE CONTROL FRAMES
19.142 Maintenance
19.143 Testing and Overhauling
. ELECTRIC KEY TRANSMITTER
19.144 Maintenance
19.145 Testing of Key Transmitter
. ELECTRIC LEVER LOCK
19.146 Maintenance
. SIGNAL ARM AND LIGHT INDICATORS
19.147 Maintenance
. MAINTENANCE SCHEDULE
19.148 Schedule of Maintenance of Electrical Signalling Equipment
Annexure 29 Colour Scheme for Electrical Signal Equipment
Annexure 30 Schedule of Maintenance Electrical Signalling Equipment