Annexure 5.6 |
DAILY PROGRESS REPORT-CUM LOG BOOK |
1. Machine No._____ Machine Base _______
Work Base _______Date______
Machine stabled at: ___________
Senior Operator :_____________________
Junior Operator : _____________________
Section Engineer:_____________________
Section |
Time |
Remarks |
||
From |
To |
From |
To |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Section Code |
Block No. |
Planned |
Availed |
Effective |
Location |
Up/ Dn |
Kms |
Sleepers |
Length in Km |
|||||
From |
To |
From |
To |
From |
To |
From |
To |
From |
To |
|||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sleepers unloaded:_______ Panels unloaded: ________ Panels assembled ________
Sleepers stock on date: _______________
Block No. _______ From: ________To __________
Reasons: ____________
(a) |
|
Block No. ____________ (TTM) Maintenance: ____________ |
|
|
Behind BCM ____________ |
|
|
Behind PQRS ____________ Construction: ______________________ |
(b) |
|
Design mode/smoothing mode: __________________________ |
Rail: _______ LWR/SWR/FP: _______ Sleeper: _____ Fastenings: _______
Ballast Cushion: _____
X-Level: _______ Alignment: _______
Tamping Tools last changed: _______ Sleepers so far tamped: _______
Engine Water Temperature |
Lub Oil Pressure |
Pneumatic Pressure |
Brake Pressure |
Smoke |
Others |
||
Low Idle |
High Idle |
Full Load |
|||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
10. System Satisfactory Working
Lifting: _____ Levelling: _____ Lining: _____
Tamping: _______ Brake: _______
Joint Sleeper: ______ Hydraulic Cooling: ________
Axle Support: __________
Start: _____ Close: _______ B/F: ______
Duration: ________ Cumulative: ______
Engine/ Machine |
Due on date |
Done |
Not done with reasons |
|
|
|
|
|
|
|
|
Break-down Code |
From |
To |
In Block or not |
Major/Minor |
Remarks |
|
|
|
|
|
|
|
|
|
|
|
|
H.S.D. Oil |
Lub Oil |
Hydraulic Oil |
Gear Oil |
Others |
||||
On date |
Cumulative |
On date |
Cumulative |
On date |
Cumulative |
On date |
Cumulative |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Fit/Released |
Part Code |
Description |
Qty |
Unit |
Schedule/Break-down |
Remarks |
|
|
|
|
|
|
|
TTM: |
Total tamped on date: ___________Sleepers |
|
cumulative for month: ___________ Sleepers |
PQRS: |
CTR Ref. __________CTR: From ____________To: _____________ |
|
Panels laid on date:_______Cum. for the month: _________ |
|
Laid in the CTR: ___________ |
BCM: |
Screened on date: __________ metres |
|
Cumulative for month: _________metres |
BRM: |
Actual Km: ____ No. of passes: _____ |
|
ETKM. ______ |
|
cumulative ETKM for the month _____________ |
UNIMAT: |
Cross over on date: ________ Cumulative for month: ____ |
|
Straight Track on date ___________ Cumulative for month: ____ |
Others: |
On date: _______ Cumulative for month: __________ |
|
________ |
17. Special Remarks - Assistance Required
18. Reasons for not Availing Block: (Machine/ SE/P.Way /Electrical/OHE/Signal)
1) Block not planned |
...... |
4) Machine Break down |
...... |
7) Machine IOH/POH |
...... |
10) PQRS/BCM: Preliminary |
2) No staff |
|
5) Bad Weather/Rain |
|
8) Engineering Account |
|
11) No contract Labour |
3) Block not granted |
|
6) Machine on movement |
|
9) Traffic Account |
|
12) Want of Loco power |
________ |
________ |
______________ |
______________ |
SEN |
AEN |
SSE/SE (P. Way) |
Machine Operator |
Instructions to Use above Log Book:
A. In para 3, indicate Section Code as follows:-
GDR-MAS |
62201 (UP) |
JTJ-ED |
61207 (DN) |
MAS-GDR |
62202 (DN) |
SBC-JTJ |
62310 (UP) |
RU-AJI |
61203 (UP) |
JTJ-SBC |
62309 (DN) |
AJI-RU |
61204 (DN) |
ERS-ED |
62312 (UP) |
JTJ-AJI-MAS |
61206 (UP) |
ED-ERS |
62311 (DN) |
MAS-AJI-JTJ |
61205 (DN) |
SBC-DHW |
62313 (SL) |
ED-JTJ |
62208 (UP) |
SRR-MAQ |
62314 (SL) |
B. In para 12 for Schedule Maintenance, indicate 'weekly', 'monthly', '200 hrs', A, E checks etc.
C. In para 12, denote schedule maintenance as follows:-
(a) |
|
Engine: |
|
A- Check, B-Check, E-Check |
|
(b) |
|
Machine: Schedule- |
|
I (every day), |
II (50 hours), |
|
|
|
|
III (100 hours), |
IV (200 hours), |
|
|
|
|
V (yearly), |
VI (2000 hours), IOH |
|
|
|
|
and VII (6000 hours), POH. |
|
D. In para 13, choose breakdown codes from below:-
|
06 |
05 |
02 |
01 |
08 |
07 |
09 |
|
Mechanical |
Hydraulic |
Electrical |
Electronic |
Engine |
Pneumatic |
Hose Fittings |
1. |
Gear Box |
Cylinder |
Battery |
Relays |
Radiator |
Unloader |
No. 20 Hp |
2. |
Axle |
Pumps |
Wiring |
PCBs |
Water Pump |
Valves |
No. 16 Hp |
3. |
Bogie Structure |
Motors |
Alternator |
Others |
Lub oil Circuit |
Throttles |
No. 10 Hp |
4. |
Chain |
Valves |
Starter motor |
|
Injectors |
Others |
No. 12 Hp |
5. |
Chain Links |
Others |
Others |
|
Filters |
|
No. 8 Hp |
6. |
Others |
|
|
|
Compressor |
|
No. 4 Hp |
7. |
|
|
|
|
Others |
|
No. 6 Hp |
8. |
|
|
|
|
|
|
No. 24 Hp |
Example: For Alternator failure - Write : 02 - 3
E. In para 15 for spare parts code, refer Stores/Spare Parts Catalogue.
Note:
(i) There may be sections where Code No. is not given. In such cases, write the section between major junctions.
ii) For single line portion of SBC-JTJK, give the down line code.